94-30290. Southern Natural Gas Co.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 59, Number 236 (Friday, December 9, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-30290]
    
    
    [[Page Unknown]]
    
    [Federal Register: December 9, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-108-000]
    
     
    
    Southern Natural Gas Co.; Notice of Request Under Blanket 
    Authorization
    
    December 5, 1994.
        Take notice that on December 1, 1994, Southern Natural Gas Company 
    (Southern), P.O. Box 2563, Birmingham, Alabama 35202-2563, filed a 
    prior notice request with the Commission in Docket No. CP95-108-000 
    pursuant to Secs. 157.205 and 157.212 of the Commission's Regulations 
    under the Natural Gas Act (NGA) for authorization to install certain 
    measurement facilities to provide for more reliable operations of a 
    delivery point for an existing customer under the blanket certificate 
    issued in Docket No. CP82-406-000, all as more fully set forth in the 
    request on file with the Commission and open to public inspection.
        Southern proposes to install a 4-inch orifice meter run and a 2-
    inch axial flow regulator at its Dallas No. 2 Point of Delivery 
    (Dallas) to sell and delivery natural gas to an existing customer, 
    Atlanta Gas Light Company (Atlanta). Southern states that the need for 
    the new facilities is due to an increase of demand of natural gas by 
    Atlanta. Southern further states that it does not propose to abandon 
    any of the existing facilities at the existing station and will use the 
    existing 3-inch meter run as a stand-by meter when lower flow or 
    pressure conditions warrant use of the meter. The estimated cost of the 
    modifications at the station is $15,055. Southern further states that 
    it has sufficient capacity to accomplish deliveries at the station 
    without detriment or disadvantage of its other firm customers and the 
    modifications proposed will not result in customers and the 
    modifications proposed will not result in termination of service, nor 
    will it result in a change to the firm transportation demand of Atlanta 
    at the Dallas No. 2 Delivery Point.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursaunt to Sec. 157.205 of the Regulations 
    under the NGA (18 CFR 157.205) a protest to the request. If no protest 
    is filed within the allowed time, the proposed activity shall be deemed 
    to be authorized effective the day after the time allowed for filing a 
    protest. If a protest is filed and not withdrawn within 30 days after 
    the time allowed for filing a protest, the instant request shall be 
    treated as an application for authorization pursuant to Section 7 of 
    the NGA.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-30290 Filed 12-8-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/09/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-30290
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: December 9, 1994, Docket No. CP95-108-000