94-30290. Southern Natural Gas Co.; Notice of Request Under Blanket Authorization
[Federal Register Volume 59, Number 236 (Friday, December 9, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-30290]
[[Page Unknown]]
[Federal Register: December 9, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-108-000]
Southern Natural Gas Co.; Notice of Request Under Blanket
Authorization
December 5, 1994.
Take notice that on December 1, 1994, Southern Natural Gas Company
(Southern), P.O. Box 2563, Birmingham, Alabama 35202-2563, filed a
prior notice request with the Commission in Docket No. CP95-108-000
pursuant to Secs. 157.205 and 157.212 of the Commission's Regulations
under the Natural Gas Act (NGA) for authorization to install certain
measurement facilities to provide for more reliable operations of a
delivery point for an existing customer under the blanket certificate
issued in Docket No. CP82-406-000, all as more fully set forth in the
request on file with the Commission and open to public inspection.
Southern proposes to install a 4-inch orifice meter run and a 2-
inch axial flow regulator at its Dallas No. 2 Point of Delivery
(Dallas) to sell and delivery natural gas to an existing customer,
Atlanta Gas Light Company (Atlanta). Southern states that the need for
the new facilities is due to an increase of demand of natural gas by
Atlanta. Southern further states that it does not propose to abandon
any of the existing facilities at the existing station and will use the
existing 3-inch meter run as a stand-by meter when lower flow or
pressure conditions warrant use of the meter. The estimated cost of the
modifications at the station is $15,055. Southern further states that
it has sufficient capacity to accomplish deliveries at the station
without detriment or disadvantage of its other firm customers and the
modifications proposed will not result in customers and the
modifications proposed will not result in termination of service, nor
will it result in a change to the firm transportation demand of Atlanta
at the Dallas No. 2 Delivery Point.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursaunt to Sec. 157.205 of the Regulations
under the NGA (18 CFR 157.205) a protest to the request. If no protest
is filed within the allowed time, the proposed activity shall be deemed
to be authorized effective the day after the time allowed for filing a
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to Section 7 of
the NGA.
Lois D. Cashell,
Secretary.
[FR Doc. 94-30290 Filed 12-8-94; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 12/09/1994
- Department:
- Energy Department
- Entry Type:
- Uncategorized Document
- Document Number:
- 94-30290
- Pages:
- 0-0 (1 pages)
- Docket Numbers:
- Federal Register: December 9, 1994, Docket No. CP95-108-000