94-30376. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 59, Number 236 (Friday, December 9, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-30376]
    
    
    [[Page Unknown]]
    
    [Federal Register: December 9, 1994]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-4718-2]
    
     
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared November 21, 1994, through 
    November 25, 1994, pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(C) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 10, 1994 (59 
    FR 16807).
    
    Draft EISs
    
    ERP No. D-AFS-J65224-MT Rating EC2
    
        Running Wolf Timber Sales, Implementation, Lewis and Clark National 
    Forest, Judith Ranger District, Stanford, Judith Basin County, MT.
    Summary
        EPA expressed concerns regarding the assessment of water quality 
    impacts, and the adequacy of the water quality monitoring program. The 
    final EIS needs to fully assess all potential impacts of management 
    actions.
    
    ERP No. D-AFS-K61132-CA Rating LO1
    
        Eight Eastside Rivers, Wild and Scenic River Study, Suitability or 
    Nonsuitability, Tahoe National Forest and Lake Tahoe Management Unit, 
    Land and Resource Management Plans, Alpine, El Dorado El Dorado, 
    Placer, Nevada and Sierra Counties, CA.
    Summary
        EPA expressed a lack of objections for the proposed action. 
    However, EPA suggests that the final EIS address potential water 
    quality impacts, air pollution sources and visibility.
    
    ERP No. D-BLM-K67026-CA Rating EC2
    
        Briggs Open Pit Heap Leach Gold Mine Project, Construction and 
    Operation, NPDES Permit and COE Section 404 Permit, Inyo County, CA.
    Summary
        EPA expressed environmental concerns regarding potential impacts to 
    water quality, wildlife, air quality, and visual quality. Additional 
    information was requested for impacts to surface water and wetlands, 
    facilities designs, closure of the heap leach pad, contingency measure, 
    and reclamation/ maintenance of the heap leach pad after project 
    completion and the relationship between the proposed mine and the new 
    California Desert Protection Act.
    
    ERP No. D-DOE-L39052-OR Rating EC2
    
        Columbia River System Operation Review (SOR), Multiple Use 
    Management, Long-Term System Planning By Interested Parties Other than 
    Management Agencies, Canadian Entitlement Allocation Agreement Renewal 
    or Modification and Pacific NW Coordination Agreement Renewal or 
    Renegotiation, OR.
    Summary
        EPA expressed concerns regarding the geographic scope of the draft 
    EIS; degree of integration with related regional studies addressing 
    salmon survival; limited baseline data; predictive accuracy of the 
    salmon passage models; dam operational impacts on anadromous and 
    resident fish, water quality and wetlands. EPA recommended these issues 
    be further discussed including mitigation measures monitoring 
    requirements, and the need to develop a management approach to address 
    future dam operational changes.
    
    ERP No. D-FHA-D85034-WV Rating EO2
    
        Spring Hills Subdivision Housing Project, Construction, Funding, 
    Charlestown, WV.
    Summary
        EPA expressed environmental objections with the preferred 
    alternative due to potential significant impacts to on-site wetlands 
    and the adjacent Altona Marsh. EPA also expressed concerns regarding 
    wetland delineation and stormwater management systems. EPA recommended 
    that another alternative be selected.
    
    FINAL EISs
    
    ERP No. F-JUS-G11010-00
    
        Joint Task Force (JTF)--Six Support Services Continuation Program, 
    Implementation, Programmatic EIS, TX, NM, AZ, CA, U.S./Mexico Border 
    and Texas Gulf Coast.
    Summary
        EPA had no objections to the proposed action.
    
    ERP No. F-USN-E11033-FL
    
        Pensacola Naval Air Station Realignment, Relocation of Memphis 
    Naval Air Station and Closure of San Diego Naval Training Center, 
    Implementation, Pensacola Bay, FL.
    Summary
        EPA had no objection with the project as proposed.
    
    ERP No. FB-FHW-D40010-MD
    
        Boston Street Corridor (a part of the former I-83 Corridor Project) 
    Transportation Improvements, Chester Street to Conlking Street, 
    Additional Information concerning New Alternatives Under Consideration, 
    Approval and Funding, East Baltimore, Baltimore County, MD.
    Summary
        The final EIS adequately addresses our concerns on this project.
    
        Dated: December 6, 1994.
    Richard E. Sanderson,
    Director, Office of Federal Activities.
    [FR Doc. 94-30376 Filed 12-8-94; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
12/09/1994
Department:
Environmental Protection Agency
Entry Type:
Uncategorized Document
Document Number:
94-30376
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: December 9, 1994, ER-FRL-4718-2