DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Ready for Environmental Analysis and
Soliciting Comments, Recommendations, Terms and Conditions, and
Prescriptions
December 3, 1998.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Subsequent license.
b. Project No.: 1981-010.
c. Date filed: February 25, 1998.
d. Applicant: Oconto Electric Cooperative.
e. Name of Project: Stiles Project.
f. Location: On the Oconto River, near the City of Oconto Falls,
Oconto County, Wisconsin. This project would not utilize federal lands.
g. Filed Pursuant to: Federal Power Act 16 USC 791(a)-825(r).
h. Applicant Contact: Mr. Tony Anderson, General Manager, Oconto
Electric Cooperative, 7479 REA Road, P.O. Box 168, Oconto Falls, WI
54154-0168, (920) 846-2816.
i. FERC Contact: Any questions on this notice should be addressed
to Patti Leppert-Slack, E-mail address
patricia.leppertslack@ferc.fed.us or telephone (202) 219-2767.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance of this
notice.
All documents (original and eight copies) should be filed with:
David P.
[[Page 67876]]
Boergers, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE, Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission, relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Status of environmental analysis: This application has been
accepted for filing and is ready for environmental analysis at this
time.
1. Description of the Project: The existing project consists of:
(1) a 20-foot-high earthen embankment and 463-acre impoundment; (2) a
66-foot-long powerhouse, containing two generating units with a total
capacity of 1,000 kilowatts; (3) a substation; and other appurtenances.
m. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference, located at 888 First Street N.E., Room 2A, Washington, DC
20426, or by calling (202) 208-1371. The application may be viewed on
the web at www.ferc.fed.us. Call (202) 208-2222 for assistance. A copy
is also available for inspection and reproduction at the address shown
in item h above.
n. This notice also consists of the following standard paragraphs:
A4 and D10.
A4. Development Application--Public notice of the filing of the
initial development application, which has already been given,
established the due date for filing competing applications or notices
of intent. Under the Commission's regulations, any competing
development application must be filed in response to and in compliance
with public notice of the initial development application. No competing
applications or notices of intent may be filed in response to this
notice.
D10. Filing and Service of Responsive Documents--The application is
ready for environmental analysis at this time, and the Commission is
requesting comments, reply comments, recommendations, terms and
conditions, and prescriptions.
The Commission directs, pursuant to Section 4.34(b) of the
Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20,
1991) that all comments, recommendations, terms and conditions and
prescriptions concerning the application be filed with the Commission
within 60 days from the issuance date of this notice. All reply
comments must be filed with the Commission within 105 days from the
date of this notice.
Anyone may obtain an extension of time for these deadlines from the
Commission only upon a showing of good cause or extraordinary
circumstances in accordance with 18 CFR 385.2008.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Any of these documents must be
filed by providing the original and the number of copies required by
the Commission's regulations to: The Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE, Washington, DC 20426. An
additional copy must be sent to Director, Division of Project Review,
Office of Hydropower Licensing, Federal Energy Regulatory Commission,
at the above address. Each filing must be accompanied by proof of
service on all persons listed on the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b), and
385.2010.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-32712 Filed 12-8-98; 8:45 am]