98-32719. Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 63, Number 236 (Wednesday, December 9, 1998)]
    [Notices]
    [Pages 67869-67870]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-32719]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. RP98-394-002]
    
    
    Transcontinental Gas Pipe Line Corporation; Notice of Proposed 
    Changes in FERC Gas Tariff
    
    December 3, 1998.
        Take notice that on November 30, 1998 Transcontinental Gas Pipe 
    Line Corporation (Transco) tendered for filing to become part of its 
    FERC Gas Tariff, Third Revised Volume No. 1, certain revised tariff 
    sheets which tariff sheets are enumerated in Appendix A attached to the 
    filing. Such tariff sheets are proposed to be effective November 1, 
    1998.
        On September 1, 1998, Transco filed in the referenced docket to 
    implement new Rate Schedules WSS-Open Access and WSS Open Access-R to 
    accommodate requests by several of its shippers to convert their 
    Section 7(c) Rate Schedule WSS firm storage service to service under 
    Transco's blanket
    
    [[Page 67870]]
    
    certificate and Part 284 of the Commission's regulations. On October 
    28, 1998, the Commission issued an ``Order Accepting Certain Tariff 
    Sheets Subject to Conditions and Rejecting Other Tariff Sheet as Moot'' 
    (October 28 Order) and required Transco to file revised tariff sheets 
    consistent with its discussion in the order.
        In compliance with the October 28 Order, Transco is filing revised 
    tariff sheets in the instant filing to (1) revise Section 9 (and remove 
    Sections 9.2-9.5 as no longer necessary) of Rate Schedule WSS and 
    Section 8 of Rate Schedule WSS-Open Access to include the base gas 
    volume that each customer has the right to repurchase and clarify that 
    new customers are not required to provide base gas; and (2) remove the 
    words ``by seller'' from the last sentence in Section 7.1(a) of Rate 
    Schedule WSS-Open Access. With regard to the correct WSS base gas 
    volume, please refer to Appendix B attached to the filing which 
    provides the amount of injected base gas in the Washington Storage 
    Field as recorded in Transco's audited accounting records.
        Transco states that it is serving copies of the instant filing to 
    its affected customers and interested State Commissions.
        Any person desiring to protest this filing should file a protest 
    with the Federal Energy Regulatory Commission, 888 First Street, NE., 
    Washington, DC 20426, in accordance with Section 385.211 of the 
    Commission's Rules and Regulations. All such protests must be filed as 
    provided in Section 154.210 of the Commission's Regulations. Protests 
    will be considered by the Commission in determining the appropriate 
    action to be taken, but will not serve to make protestants parties to 
    the proceedings. Copies of this filing are on file with the Commission 
    and are available for public inspection in the Public Reference Room.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-32719 Filed 12-8-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/09/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-32719
Pages:
67869-67870 (2 pages)
Docket Numbers:
Docket No. RP98-394-002
PDF File:
98-32719.pdf