2010-30990. Oil and Gas and Sulphur Operations in the Outer Continental Shelf-Increased Safety Measures for Energy Development on the Outer Continental Shelf; Correction  

  • Start Preamble Start Printed Page 76632

    AGENCY:

    Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE), Interior.

    ACTION:

    Interim final rule; correction.

    SUMMARY:

    BOEMRE published an interim final rule implementing certain safety measures recommended for improving the safety of oil and gas exploration and development on the Outer Continental Shelf. This document contains a correction to the final regulations published on October 14, 2010, which inadvertently deleted one sentence from the existing regulations. The correction being made is non-substantive and is necessary for clarification purposes only.

    DATES:

    Effective Date: This correction is effective December 9, 2010.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Amy C. White, (703) 787-1665.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Background

    BOEMRE published an interim final rule in the Federal Register on October 14, 2010 (75 FR 63346), titled “Increased Safety Measures for Energy Development on the Outer Continental Shelf.”

    On page 63372 of the Federal Register publication of the interim final rule, the first sentence in § 250.415(d) was inadvertently deleted.

    Start List of Subjects

    List of Subjects in 30 CFR Part 250

    • Administrative practice and procedure
    • Continental shelf
    • Incorporation by reference
    • Oil and gas exploration
    • Public lands—mineral resources
    • Reporting and recordkeeping requirements
    End List of Subjects Start Signature

    Dated: November 30, 2010.

    Ned Farquhar,

    Deputy Assistant Secretary—Land and Minerals Management.

    End Signature Start Amendment Part

    Accordingly, Bureau of Ocean Energy Management, Regulation and Enforcement is making the correcting amendment to 30 CFR Part 250 as follows:

    End Amendment Part Start Part

    PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF

    End Part Start Amendment Part

    1. The authority citation for part 250 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 31 U.S.C. 9701, 43 U.S.C. 1334.

    End Authority Start Amendment Part

    2. In § 250.415, revise paragraph (d) to read as follows:

    End Amendment Part
    What must my casing and cementing programs include?
    * * * * *

    (d) In areas containing permafrost, setting depths for conductor and surface casing based on the anticipated depth of the permafrost. Your program must provide protection from thaw subsidence and freezeback effect, proper anchorage, and well control;

    * * * * *
    End Supplemental Information

    [FR Doc. 2010-30990 Filed 12-8-10; 8:45 am]

    BILLING CODE 4310-MR-P

Document Information

Comments Received:
0 Comments
Published:
12/09/2010
Department:
Ocean Energy Management, Regulation, and Enforcement Bureau
Entry Type:
Rule
Action:
Interim final rule; correction.
Document Number:
2010-30990
Pages:
76632-76632 (1 pages)
Docket Numbers:
Docket ID BOEM-2010-0034
RINs:
1010-AD68: Increased Safety Measures for Oil and Gas Operations on the Outer Continental Shelf (OCS)
RIN Links:
https://www.federalregister.gov/regulations/1010-AD68/increased-safety-measures-for-oil-and-gas-operations-on-the-outer-continental-shelf-ocs-
Topics:
Administrative practice and procedure, Continental shelf, Incorporation by reference, Oil and gas exploration, Public lands-mineral resources, Reporting and recordkeeping requirements
PDF File:
2010-30990.pdf
CFR: (1)
30 CFR 250.415