-
Start Preamble
January 26, 2001.
AGENCY:
Federal Energy Regulatory Commission.
ACTION:
Notice of proposed information collection and request for comments.
SUMMARY:
In compliance with the requirements of Section 3506(c)(2)(a) of the Paperwork Reduction Act of 1995 (Pub. L. No. 104-13), the Federal Energy Regulatory Commission (Commission) is soliciting public comment on the specific aspects of the information collection described below.
DATES:
Consideration will be given to comments submitted on or before April 2, 2001.
ADDRESSES:
Copies of the proposed collection of information can be obtained from and written comments may be submitted to the Federal Energy Regulatory Commission, Attn: Michael Miller, Office of the Chief Information Officer, CI-1, 888 First Street NE., Washington, DC 20426.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Michael Miller may be reached by telephone at (202) 208-1415, by fax at (202) 208-2425, and by e-mail at mike.miller@ferc.fed.us.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The information collected under the requirements of FERC-511 “Application for Transfer of License” (OMB No. 1902-0069) is used by the Commission to implement the statutory provisions of Part I, Sections 4(e) and 8 of the Federal Power Act (FPA) 16 U.S.C. 792-828c. Section 4(e) authorizes the Commission to issue licenses for the construction, operation and maintenance of reservoirs, power houses and transmission lines or other facilities necessary for development and improvement of navigation and for the development, transmission, and utilization of power from bodies of water Congress has jurisdiction over. Section 8 of the FPA provides that the voluntary transfer of any license can only be made with the written approval of the Commission. Any successor to the licensee may assign the rights of the original licensee but is subject to all of the conditions of the license. The information filed with the Commission is a mandatory requirement contained in the format of a written application for transfer of license, executed jointly by the parties of the proposed transfer. The transfer of a license may be occasioned by the sale or merger of a licensed hydroelectric project. It is used by the Commission's staff to determine the qualifications of the proposed transferee to hold the license, and to prepare the transfer of the license order. The Commission implements these filing requirements in the Code of Federal Regulations (CFR) under 18 CFR Part 9.
Action: The Commission is requesting a three-year extension of the current expiration date, with no changes to the existing collection of data.
Burden Statement: Public reporting burden for this collection is estimated as:Start Printed Page 8576
Number of respondents annually Number of responses per respondent Average burden hours per response Total annual burden hours (1) (2) (3) (1) x (2) x (3) 23 1 40 920 Estimated cost burden to respondents: 920 hours/2,080 hours per year × $115,357 per year = $51,023. The cost per respondent is equal to $2,218.
The reporting burden includes the total time, effort, or financial resources expended to generate, maintain, retain, disclose, or provide the information including: (1) Reviewing instructions; (2) developing, acquiring, installing, and utilizing technology and systems for the purposes of collecting, validating, verifying, processing, maintaining, disclosing and providing information; (3) adjusting the existing ways to comply with any previously applicable instructions and requirements; (4) training personnel to respond to a collection of information; (5) searching data sources; (6) completing and reviewing the collection of information; and (7) transmitting, or otherwise disclosing the information.
The estimate of cost for respondents is based upon salaries for professional and clerical support, as well as direct and indirect overhead costs. Direct costs include all costs directly attributable to providing this information, such as administrative costs and the cost for information technology. Indirect or overhead costs are costs incurred by an organization in support of its mission. These costs apply to activities which benefit the whole organization rather than any one particular function or activity.
Comments are invited on: (1) Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information to be collected; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology e.g. permitting electronic submission of responses.
Start SignatureDavid P. Boergers,
Secretary.
[FR Doc. 01-2726 Filed 1-31-01; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 02/01/2001
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Action:
- Notice of proposed information collection and request for comments.
- Document Number:
- 01-2726
- Dates:
- Consideration will be given to comments submitted on or before April 2, 2001.
- Pages:
- 8575-8576 (2 pages)
- Docket Numbers:
- Docket No. IC01-511-000, FERC-511
- EOCitation:
- of 2001-01-26
- PDF File:
- 01-2726.pdf