01-2728. Proposed Information Collection and Request for Comments  

  • Start Preamble January 26, 2001.

    AGENCY:

    Federal Energy Regulatory Commission.

    ACTION:

    Notice of proposed information collection and request for comments.

    SUMMARY:

    In compliance with the requirements of section 3506(c)(2)(a) of the Paperwork Reduction Act of 1995 (Pub. L. No. 104-13), the Federal Energy Regulatory Commission (Commission) is soliciting public comment on the specific aspects of the information collection described below.

    DATES:

    Consideration will be given to comments submitted on or before April 2, 2001.

    ADDRESSES:

    Copies of the proposed collection of information can be obtained from and written comments may be submitted to the Federal Energy Regulatory Commission, Attn: Michael Miller, Office of the Chief Information Officer, CI-1, 888 First Street NE., Washington, DC 20426.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Michael Miller may be reached by telephone at (202) 208-1415, by fax at (202) 208-2425, and by e-mail at mike.miller@ferc.fed.us.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The information collected under the requirementes of FERC-515 “Hydropower Licensing, Declaration of Intention” (OMB No. 1902-0079) is used by the Commission to implement the statutory provisions of part I, sections 23(b) of the Federal Power Act (FPA) 16 U.S.C. 817. Section 23(b) authorizes the Commission to make a determination as to whether it has jurisdiction over a proposed hydroelectric project. Section 23(b) also requires that any person intending to construct project works on a navigable commerce clause water must file a declaration of their intention to do so with the Commission. If the Commission finds the proposed project will have an impact on “interstate or foreign commerce”, then the person intending to construct the project must obtain a Commission license or exemption before starting construction. Such sites are generally on streams defined by as U.S. navigation waters, and over which the Commission has jurisdiction under its authority to regulate foreign and interstate commerce. The information is collected in the form of a written application, declaring the applicant's intent and use by Commission staff to research the jurisdictional aspects of the project. This research includes examining maps and land ownership records to establish whether or not there is Federal jurisdiction over the lands and waters affected by the project. A finding of non-jurisdictional by the Commission eliminates a substantial paperwork burden for the applicant who might otherwise have to file for a license or exemption application. The Commission implements these filing requirements in the Code of Federal Regulations (CFR) under 18 CFR part 24.

    Action: The Commission is requesting a three-year extension of the current expiration date, with no changes to the existing collection of data.

    Burden Statement: Public reporting burden for this collection is estimated as: Start Printed Page 8577

    Number of respondents annuallyNumber of responses per respondentAverage burden hours per responseTotal annual burden hours
    (1)(2)(3)(1) x (2) x (3)
    10180800

    Estimated cost burden to respondents: 800 hours/2,080 hours per year × $115,357 per year = $44,368. The cost per respondent is equal to $4,436.

    The reporting burden includes the total time, effort, or financial resources expended to generate, maintain, retain, disclose, or provide the information including: (1) Reviewing instructions; (2) developing, acquiring, installing, and utilizing technology and systems for the purposes of collecting, validating, verifying, processing, maintaining, disclosing and providing information; (3) adjusting the existing ways to comply with any previous applicable instructions and requirements; (4) training personnel to respond to a collection of information; (5) search data sources; (6) completing and reviewing the collection of information; and (7) transmitting, or otherwise disclosing the information.

    The estimate of cost for respondents is based upon salaries for professional and clerical support, as well as direct and indirect overhead costs. Direct costs include all costs directly attributable to providing this information, such as administrative costs and the cost for information technology. Indirect or overhead costs are costs incurred by an organization in support of its mission. These costs apply to activities which benefit the whole organization rather than any one particular function or activity.

    Comments are invited on: (1) Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information to be collected; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology e.g. permitting electronic submission of responses.

    Start Signature

    David P. Boergers,

    Secretary.

    End Signature End Supplemental Information

    [FR Doc. 01-2728 Filed 1-31-01; 8:45 am]

    BILLING CODE 6717-01-M

Document Information

Published:
02/01/2001
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
Notice of proposed information collection and request for comments.
Document Number:
01-2728
Dates:
Consideration will be given to comments submitted on or before April 2, 2001.
Pages:
8576-8577 (2 pages)
Docket Numbers:
Docket No. IC01-515-000, FERC-515
EOCitation:
of 2001-01-26
PDF File:
01-2728.pdf