SUMMARY:
Nexen Marketing U.S.A. Inc. (Nexen) has applied for authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act.
DATES:
Comments, protests, or requests to intervene must be submitted on or before March 3, 2008.
ADDRESSES:
Comments, protests, or requests to intervene should be addressed as follows: Office of Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, 20585-0350 (FAX 202-586-8008).
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ellen Russell (Program Office) 202-586-9624 or Michael Skinker (Program Attorney) 202-586-2793.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) of the FPA (16 U.S.C. 824a(e)).
On December 17, 2007, the Department of Energy (DOE) received an application from Nexen for authority to transmit electric energy from the United States to Canada as a power marketer. Nexen, a Delaware corporation with its principal place of business in Calgary, Alberta, Canada, has requested an electricity export authorization with a 5-year term. Nexen does not own or control any electric generation, transmission, or distribution assets within the United States, nor does it have a franchised service area in the United States. The electric energy which Nexen proposes to export to Canada would be surplus energy purchased from electric utilities, Federal power marketing agencies, and other entities within the United States.
Nexen will arrange for the delivery of exports to Canada over the international transmission facilities owned by Basin Electric Power Cooperative, Bonneville Power Administration, Eastern Maine Electric Cooperative, International Transmission Co., Joint Owners of the Highgate Project, Long Sault, Inc., Maine Electric Power Company, Maine Public Service Company, Minnesota Power, Inc., Minnkota Power Cooperative, Inc., New York Power Authority, Niagara Mohawk Power Corp., Northern States Power Company, Vermont Electric Power Company, and Vermont Electric Transmission Co.
The construction, operation, maintenance, and connection of each of the international transmission facilities to be utilized by Nexen has previously been authorized by a Presidential permit issued pursuant to Executive Order 10485, as amended.
Procedural Matters: Any person desiring to become a party to these proceedings or to be heard by filing comments or protests to this application should file a petition to intervene, comment, or protest at the address provided above in accordance with §§ 385.211 or 385.214 of the Federal Energy Regulatory Commission's Rules of Practice and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each petition and protest should be filed with DOE on or before the date listed above.
Comments on the Nexen application to export electric energy to Canada should be clearly marked with Docket No. EA-332. Additional copies are to be filed directly with Douglas F. John, John & Hengerer, 1730 Rhode Island Ave., NW., Suite 600, Washington, DC 20036-3116 and Diane Cameron, Director, Regulatory, Nexen Marketing U.S.A. INC., 801 7th Avenue, SW., Calgary, AB T2P 3P7 Canada.
A final decision will be made on this application after the environmental impacts have been evaluated pursuant to the National Environmental Policy Act of 1969, and a determination is made by DOE that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system.
Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at http://www.oe.energy.gov/permitting/electricity_imports_exports.htm, or by e-mailing Odessa Hopkins at Odessa.hopkins@hq.doe.gov.
Start SignatureIssued in Washington, DC, on January 29, 2008.
Anthony J. Como,
Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability.
[FR Doc. E8-1917 Filed 1-31-08; 8:45 am]
BILLING CODE 6450-01-P
Document Information
- Published:
- 02/01/2008
- Department:
- Energy Department
- Entry Type:
- Notice
- Action:
- Notice of application.
- Document Number:
- E8-1917
- Dates:
- Comments, protests, or requests to intervene must be submitted on or before March 3, 2008.
- Pages:
- 6171-6171 (1 pages)
- Docket Numbers:
- OE Docket No. EA-332
- PDF File:
- e8-1917.pdf