94-3139. Pipeline Right-of-Way Application; Nevada  

  • [Federal Register Volume 59, Number 28 (Thursday, February 10, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-3139]
    
    
    [[Page Unknown]]
    
    [Federal Register: February 10, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF THE INTERIOR
    [NV-940-5101-10-F303; N-57461]
    
     
    
    Pipeline Right-of-Way Application; Nevada
    
    AGENCY: Bureau of Land Management, Interior.
    
    ACTION: Notice.
    
    -----------------------------------------------------------------------
    
    SUMMARY: This notice is to inform the public that a right-of-way 
    application has been filed for a gas pipeline that will cross 
    approximately 45 miles of public land.
    
    FOR FURTHER INFORMATION CONTACT:
    Mary Clark, BLM Nevada State Office, 850 Harvard Way, P.O. Box 12000, 
    Reno, Nevada 89520, (702) 785-6530.
    
    SUPPLEMENTARY INFORMATION: Paiute Pipeline Company has applied for a 
    right-of-way grant under Section 38 of the Mineral Leasing Act of 1920 
    (30 U.S.C. 185), to construct approximately 45 miles of pipeline across 
    the following described public lands:
    
    Mount Diablo Meridian, Nevada
    
    T. 16 N., R 20E.,
        Sec. 29, S\1/2\SW\1/4\, SW\1/4\SE\1/4\;
        Sec. 30, SW\1/2\NE\1/4\, S\1/2\ lot 1 NW\1/4\, S\1/2\ lot 2 
    NW\1/4\, N\1/4\SE\1/4\.
    T. 20 N., R. 22 E.,
        Sec. 22, N\1/2\S\1/2\;
        Sec. 24, S\1/2\NW\1/4\, N\1/2\NE\1/4\.
    T. 20 N., R. 23 E.,
        Sec. 20, N\1/2\N\1/2\.
    T. 31 N., R. 33E.,
        Sec. 4, lot 1 NE\1/4\, W\1/2\ lot 2 NE\1/4\ E\1/2\SW\1/4\, NW\1/
    4\SE\1/4\;
        Sec. 8, SE\1/4\SE\1/4\;
        Sec. 20, W\1/2\E\1/2\, NE\1/4\NE\1/4\;
        Sec. 32, NE\1/4\NW2\1/4\, W\1/2\W\1/2\.
    T. 37 N., R. 37 E.,
        Sec. 12, NW\1/4\NE\1/4\, E\1/2\NW\1/4\, N\1/2\SW\1/4\, SW\1/
    4\SW\1/4\;
        Sec. 14, lot 2, N\1/2\NE\1/4\, SW\1/4\NE\1/4\, NE\1/4\SW\1/4\, 
    S\1/2\SW\1/4\.
    T. 37 N., R. 39 E.,
        Sec. 6, lots 3, 4, 5.
    T. 38 N., R. 38 E.,
        Sec. 3, lots 2, 3, SW\1/4\NE\1/4\, SE\1/4\NW\1/4\, N\1/2\SW\1/
    4\, SW\1/4\SW\1/4\;
        Sec. 16, NW\1/4\NE\1/4\, E\1/2\NW\1/4\, N\1/2\SW\1/4\, SW\1/
    4\SW\1/4\;
        Sec. 20, E\1/2\NE\1/4\, N\1/2\SE\1/4\, SW\1/4\SE\1/4\;
        Sec. 30, SE\1/4\SE\1/4\.
    T. 43 N., R. 42 E.,
        Sec. 5, lots 2, 3, SE\1/4\NW\1/4\.
    T. 44 N., R. 42 E.,
        Sec. 12, SE\1/4\SE\1/4\;
        Sec. 13, N\1/2\NE\1/4\, E\1/2\NW\1/4\, SW\1/4\NW\1/4\, NW\1/
    4\SW\1/4\;
        Sec. 14, SE\1/4\SW\1/4\, NE\1/4\SE\1/4\, S\1/2\SE\1/4\;
        Sec. 22, NE\1/4\SW\1/4\, S\1/2\SW\1/4\;
        Sec. 23, lots 3, 4, 5;
        Sec. 27, NW\1/4\NW\1/4\;
        Sec. 28, N\1/2\NE\1/4\, SW\1/4\NE\1/4\, E\1/2\SW\1/4\, SW\1/
    4\SW\1/4\, NW\1/4\SE\1/4\;
        Sec. 32, E\1/2\NE\1/4\, SW\1/4\NE\1/4\, W\1/2\SE\1/4\;
        Sec. 33, NW\1/4\NW\1/4\.
    T. 44 N., R. 43 E.,
        Sec. 4, lots 3, 4;
        Sec. 5, lot 1, S\1/2\NE\1/4\, N\1/2\SW\1/4\, SW\1/4\SW\1/4\, 
    NW\1/4\SE\1/4\;
        Sec. 6. SE\1/4\SE\1/4\;
        Sec. 7, lots 2, 3, N\1/2\NE\1/4\, SW\1/4\NE\1/4\, SE\1/4\NW\1/
    4\.
    T. 45 N., R. 43 E.,
        Sec. 24, SE\1/4\NE\1/4\, S\1/2\SW\1/4\, N\1/2\SE\1/4\, SW\1/
    4\SE\1/4\;
        Sec. 24, NW\1/4\NW\1/4\;
        Sec. 26, NE\1/4\NE\1/4\, S\1/2\NE\1/4\, SE\1/4\NW\1/4\, N\1/
    2\SW\1/4\, SW\1/4\SW\1/4\;
        Sec. 27, SE\1/4\SE\1/4\;
        Sec. 33, W\1/2\E\1/2\, S\1/2\SW\1/4\, NE\1/4\SE\1/4\;
        Sec. 34, N\1/2\NE\1/4\, NE\1/4\NW\1/4\, S\1/2\NW\1/4\, NW\1/
    4\SW\1/4\.
    T. 45 N., R. 44 E.,
        Sec. 23, SW\1/4\;
        Sec. 27, N\1/2\, SW\1/4\.
    
        Containing approximately 145 acres.
    
        The proposed 50-foot wide right-of-way will involve 27.5 miles of 
    24'' pipeline, 14.25 miles of 16'' pipeline, and 2.5 miles of 12'' 
    pipeline and will be located within an existing Southeast Gas pipeline 
    right-of-way.
        The application also requests a 55-foot wide tempory work area 
    abutting the proposed right-of-way and a 100-foot wide tempory work 
    space abutting any wilderness study areas.
        An EIS covering this right-of-way project will be prepared by the 
    Federal Energy Regulatory Commission.
        The right-of-way application and related documents are available 
    for review at the Bureau of Land Management, Nevada State Office, 850 
    Harvard Way, Reno, Nevada.
    Robert G. Steele,
    Deputy State Director, Operations.
    [FR Doc. 94-3139 Filed 2-9-94; 8:45 am]
    BILLING CODE 4310-HC-M
    
    
    

Document Information

Published:
02/10/1994
Department:
Interior Department
Entry Type:
Uncategorized Document
Action:
Notice.
Document Number:
94-3139
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: February 10, 1994, NV-940-5101-10-F303, N-57461