E9-2697. Railroad Cost Recovery Procedures-Productivity Adjustment  

  • Start Preamble

    AGENCY:

    Surface Transportation Board.

    ACTION:

    Adoption of a Railroad Cost Recovery Procedures Productivity Adjustment.

    SUMMARY:

    In a decision served on February 5, 2009, we proposed to adopt 1.012 (1.2% per year) as the measure of average change in railroad productivity for the 2003-2007 (5-year) averaging period. This value was a decline of 0.1 of a percentage point from the current measure of 1.3% that was developed for the 2002-2006 period. That decision stated that comments may be filed addressing any perceived data and computational errors in our calculation. It also stated that, if there were no further action taken by the Board, the proposed productivity adjustment would become effective on March 1, 2009.

    DATES:

    The productivity adjustment is effective March 1, 2009. Comments are due by February 23, 2009.

    ADDRESSES:

    Send comments (an original and 10 copies) referring to STB Ex Parte No. 290 (Sub-No. 4) to: Surface Transportation Board, 395 E Street, SW., Washington, DC 20423-0001.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Michael Smith, (202) 245-0322. [Federal Information Relay Service (FIRS) for the hearing impaired: 1-800-877-8339.]

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Additional information is contained in the Board's decision, which is available on our Web site www.stb.dot.gov. To purchase a copy of the full decision, write to, or call the Board's Office of Public Assistance, Governmental Affairs, and Compliance; 395 E Street, SW., Washington, DC 20423-0001; phone (202) 245-0235. [Assistance for the hearing impaired is available through FIRS: 1-800-877-8339.]

    This action will not significantly affect either the quality of the human environment or energy conservation.

    Pursuant to 5 U.S.C. 605(b), we conclude that our action will not have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act.

    Start Signature

    Decided: February 3, 2009.

    By the Board, Chairman Nottingham, Vice Chairman Mulvey, and Commissioner Buttrey.

    Jeffrey Herzig,

    Clearance Clerk.

    End Signature End Supplemental Information

    [FR Doc. E9-2697 Filed 2-9-09; 8:45 am]

    BILLING CODE 4915-01-P

Document Information

Effective Date:
3/1/2009
Published:
02/10/2009
Department:
Surface Transportation Board
Entry Type:
Notice
Action:
Adoption of a Railroad Cost Recovery Procedures Productivity Adjustment.
Document Number:
E9-2697
Dates:
The productivity adjustment is effective March 1, 2009. Comments are due by February 23, 2009.
Pages:
6694-6694 (1 pages)
Docket Numbers:
STB Ex Parte No. 290 (Sub-No. 4)
PDF File:
e9-2697.pdf