    DEPARTMENT OF ENERGY
    [Project No. 2389-012]
    
    
    Edwards Manufacturing Company, Inc., City of Augusta, ME; Notice 
    of Amendment of Application
    
    February 6, 1996.
        On October 30, 1995, Edwards Manufacturing Company, Inc., and the 
    City of Augusta, Maine (applicants) filed an amendment to their 
    application for a new license for the Augusta Hydroelectric Project No. 
    2389.
        In the application for new license, filed January 31, 1991, it was 
    proposed to expand the project capacity from 3.5 to 11 megawatts (MW). 
    The amendment reduces the proposed expansion to about 4.3 MW. Under the 
    application as amended, the licensees propose only to replace the 
    existing flashboards with an inflatable crest control system, install 
    permanent upstream and downstream fish passage facilities, and upgrade 
    turbine efficiency. The Applicants would forego constructing a new 
    powerhouse and modifying the existing power canal and gatehouse, as 
    originally proposed. There would be no increase in existing hydraulic 
    capacity. The increase in generating capacity (between 0.5 and 1.0 
    megawatts) would be directly attributable to increases in turbine 
    efficiency.
        Applicants state that the remaining project improvements and 
    upgrades are substantially the same as improvements and upgrades 
    proposed in the original application. Although the fish passage 
    facilities proposed in the amendment are not those proposed in the 
    application, they are the same facilities that applicants proposed in a 
    1990 application to amend the existing project license, and were 
    designated in consultation with state and federal agencies and with 
    other interested parties. The Commission approved the installation of 
    these facilities, but the amendment was then withdrawn.\1\
    
        \1\ Edwards Manufacturing Company, Inc. and City of Augusta, 
    Maine, 69 FERC para. 61,335 (1994). The Commission approved the 
    facilities as an interim enhancement of fisheries only. On 
    rehearing, the Commission granted the licensees' request to allow 
    the withdrawal of the amendment application and vacated its order 
    amending the license. 71 FERC para. 61.227 (1995).
    ---------------------------------------------------------------------------
    
        We are providing an opportunity for additional interventions and 
    for entities to reconsider their terms, conditions, prescriptions, and 
    comments submitted previously with respect to the Augusta Project 
    application. A draft environmental impact statement (DEIS) evaluating 
    the licensing or relicensing of 11 projects, including the Augusta 
    Project, in the Kennebec River Basin was mailed to parties on January 
    4, 1996. Notice of the DEIS was published in the Federal Register on 
    January 26, 1996, setting a due date for comments of March 25, 1996. By 
    letter of January 29, 1996, the Director, Division of Project Review, 
    Office of Hydropower Licensing, extended the due date for comments to 
    April 8, 1996. Comments on the Augusta Project amendment will also be 
    due on April 8, 1996, with reply comments due 15 days later, on April 
    23, 1996.\2\
    
        \2\ A further request for extension of time by the National 
    Marine Fisheries Service was denied by letter of February 2, 1996, 
    signed by Fred E. Springer, Director, Office of Hydropower 
    Licensing.
    ---------------------------------------------------------------------------
    
        Copies of the application and amendment are available for 
    inspection and reproduction at the Commission's Public Reference and 
    Files Maintenance Branch located at 888 First Street, N.E., Room 2A, 
    Washington, D.C. 20426 or by calling (202) 208-1371. A copy is also 
    available for inspection and reproduction at 42A North Elm Street, 
    Second Floor, Yarmouth, Maine, or by calling (207) 846-3991. The 
    applicant contact for this project is Mark Isaacson.
        Contact Mr. John Blair (202) 219-2845 for questions relating to 
    this proceeding.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-2938 Filed 2-9-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
02/12/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-2938
Pages:
5393-5393 (1 pages)
Docket Numbers:
Project No. 2389-012
PDF File:
96-2938.pdf