    Notice of Application Ready for Environmental Analysis
    
    February 6, 1998.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Minor License.
        b. Project No.: 11060-000.
        c. Date Filed: December 13, 1993.
        d. Applicant: J.M. Miller Enterprises.
        e. Name of Project: Sahko Hydroelectric Project.
        f. Location: On the Kastelu Drain, Twin Falls County, Idaho.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: D.W. ``Bill'' Block, P.E., J-U-B Engineers, 
    Inc., 800 Falls Ave., Twin Falls, Idaho 83301, (208) 622-7215.
        i. FERC Contact: Nan S. Allen, 202-219-2938, or E-mail at 
    nan.alllen@ferc.fed.us.
        j. Deadline for comments, recommendations, terms and conditions, 
    and prescriptions: See attached paragraph.
        k. Status of Environmental Analysis: The application is now ready 
    for environmental analysis--see attached paragraph D10.
        l. Brief Description of Project: The proposed project would consist 
    of: (1) an 11-foot-long, 13.5-foot-high, earth-fill embankment, 
    impounding a 3-acre-foot forebay; (2) an 8.0-foot-wide, 10.0-foot-long, 
    10.5-foot-deep concrete intake structure with protective trash racks; 
    (3) an 80-foot-long, 9.5-foot-high, earth-fill embankment, impounding a 
    4-acre-foot sediment collection pond; (4) a 24-inch-diameter 1,950-
    foot-long, steel penstock; (5) a 25-foot-wide, 50 foot-long, masonry-
    block powerhouse, with an installed capacity of 500 kilowatts; (6) a 6-
    foot-wide, 30-foot-long, 3-foot deep, rock-lined tailrace; (7) a 34.5-
    kilovolt, 2,000-foot-long transmission line; and (8) related 
    appurtenances.
        m. This notice also consists of the following standard paragraphs: 
    A4 and D10.
        n. A copy of the application is available for inspection and 
    reproduction at the Commission's Public Reference Room, located at: 888 
    First St., N.E., Room 2A, Washington, D.C. 20426, or by calling (202) 
    208-1371.
        A4. Development Application--Public notice of the filing of the 
    initial development application, which has already been given, 
    established the due date for filing competing applications or notices 
    of intent. Under the Commission's regulations, any competing 
    development application must be filed in response to and in compliance 
    with public notice of the initial development application. No competing 
    applications or notices of intent may be filed in response to this 
    notice.
        D10. Filing and Service of Responsive Documents--The application is 
    ready for environmental analysis at this time, and the Commission is 
    requesting comments, reply comments, recommendations, terms and 
    conditions, and prescriptions.
        The Commission directs, pursuant to Section 4.34(b) of the 
    Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 
    1991) that all comments, recommendations, terms and conditions and 
    prescriptions concerning the application be filed with the
    
    [[Page 7155]]
    
    Commission within 60 days from the issuance date of this notice. All 
    reply comments must be filed with the Commission within 105 days from 
    the date of this notice.
        Anyone may obtain an extension of time for these deadlines from the 
    Commission only upon a showing of good cause or extraordinary 
    circumstances in accordance with 18 CFR 385.2008.
        All filings must (1) bear in all capital letters the title 
    ``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
    CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
    name of the applicant and the project number of the application to 
    which the filing responds; (3) furnish the name, address, and telephone 
    number of the person submitting the filing; and (4) otherwise comply 
    with the requirements of 18 CFR 385.2001 through 385.2005. All 
    comments, recommendations, terms and conditions or prescriptions must 
    set forth their evidentiary basis and otherwise comply with the 
    requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
    application directly from the applicants. Any of these documents must 
    be filed by providing the original and the number of copies required by 
    the Commission's regulations to: The Secretary, Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426. 
    An additional copy must be sent to Director, Division of Project 
    Review, Office of Hydropower Licensing, Federal Energy Regulatory 
    Commission at the above address. Each filing must be accompanied by 
    proof of service on all persons listed on the service list prepared by 
    the Commission in this proceeding, in accordance with 18 CFR 4.34(b), 
    and 385.2010.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-3522 Filed 2-11-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/12/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-3522
Pages:
7154-7155 (2 pages)
PDF File:
98-3522.pdf