98-3551. Enron Europe Operations Limited, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 29 (Thursday, February 12, 1998)]
    [Notices]
    [Pages 7146-7154]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-3551]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG98-37-000, et al.]
    
    
    Enron Europe Operations Limited, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    February 5, 1998.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Enron Europe Operations Limited
    
    [Docket No. EG98-37-000]
    
        Take notice that on January 29, 1998, Enron Europe Operations 
    Limited (Applicant), with its principal office at Four Millbank, 
    London, England SW1P 3ET, filed with the Commission an application for 
    determination of exempt wholesale generator status pursuant to Part 365 
    of the Commission's Regulations.
        Applicant states that it is a corporation organized under the laws 
    of England. Applicant will be engaged directly and exclusively in 
    operating an approximately 478 MW combined cycle gas-fired electric 
    generating facility located on the Marmara Sea, near Istanbul, Turkey, 
    and selling electric energy at wholesale. Electric energy produced by 
    the facility will be sold at wholesale to Turkiye Elektrik Uretim, 
    Iletisim A.S. In no event will any electricity be sold to consumers in 
    the United States.
        Comment date: February 25, 1998, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Pacific Gas and Electric Company, San Diego Gas & Electric Company, 
    and Southern California Edison Company
    
    [Docket Nos. EC96-19-012 and ER96-1663-013]
    
        Take notice that on February 2, 1998, the California Independent 
    System Operator Corporation (ISO), filed corrections to its Must-Run 
    Unit List, originally submitted for filing on December 12, 1997 in this 
    proceeding. The ISO requests waiver of the 60 day notice requirement to 
    allow the proposed filing to take effect as of the ISO operations date.
        Comment date: February 20, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Enron Guc Santrallari Isletme Limited Sirketi
    
    [Docket No. EG98-36-000]
    
        Take notice that on January 29, 1998, Enron Guc Santrallari Isletme 
    Limited Sirketi (Applicant), with its principal office at Four 
    Millbank, London, England SW1P 3ET, filed with the Commission an 
    application for determination of exempt wholesale generator status 
    pursuant to Part 365 of the Commission's Regulations.
        Applicant states that it is a limited liability company organized 
    under the laws of the Republic of Turkey. Applicant will be engaged 
    directly and exclusively in operating an approximately 478 MW combined 
    cycle gas-fired electric generating facility located on the Marmara 
    Sea, near Istanbul, Turkey, and selling electric energy at wholesale. 
    Electric energy produced by the facility will be sold at wholesale to 
    Turkiye Elektrik Uretim, Iletisim A.S. In no event will any electricity 
    be sold to consumers in the United States.
        Comment date: February 25, 1998, in accordance with Standard 
    Paragraph E at the end of this notice. The commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    4. American Atlas #1, LTD., L.L.P.
    
    [Docket No. EG98-38-000]
    
        On January 30, 1998, American Atlas #1, Ltd., L.L.P., 4845 Pearl 
    East Circle, Suite 300, Boulder, Colorado 80301, filed with the Federal 
    Energy Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    Regulations.
        The Applicant operates and sells electricity at wholesale produced 
    by the nominally 75 megawatt American Atlas No. 1 Cogeneration Facility 
    located in Rifle, Colorado (the Facility).
        Comment date: February 25, 1998, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    5. Sierra Pacific Power Company
    
    [Docket No. ER98-12-001]
    
        Take notice that on January 21, 1998, Sierra Pacific Power Company 
    tendered for filing its compliance filing in the above-referenced 
    docket.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. MidAmerican Energy Company
    
    [Docket No. ER98-1473-000]
    
        Take notice that on January 20, 1998, MidAmerican Energy Company 
    (MidAmerican), P.O. Box 657, 666 Grand Avenue, Des Moines, Iowa 50303 
    tendered for filing changes to its Open Access Transmission Tariff 
    (OATT). MidAmerican states that the purpose of the filing is to create 
    a form of service agreement for firm point-to-point transmission 
    service for less than one year, update the index of point-to-point 
    transmission service customers and update the table of contents.
        MidAmerican states that the current form of its OATT service 
    agreement for firm point-to-point transmission service includes 
    language incorporating the written specifications for the service. 
    MidAmerican further states that it believes it is necessary to include 
    this provision in agreements for long-term transactions to clarify that 
    the service will be provided in accordance with the specifications 
    agreed to by the parties but that this form of service agreement cannot 
    be used as an umbrella agreement for short-term transactions without 
    repeated filings with the Commission because the specifications vary 
    from transaction to transaction. Therefore MidAmerican states that it 
    is proposing an umbrella form of service agreement for short-term firm 
    transactions which incorporates the short-term transaction 
    specifications as posted on the OASIS.
        MidAmerican proposes an effective date of January 23, 1998, for the 
    tariff changes and requests a waiver of the 60-day notice requirement. 
    MidAmerican states that good cause exists to grant the waiver because 
    the changes to index and table of contents are ministerial and 
    informational in nature and the changes to the form of agreement do not 
    alter the substantive rights or obligations of MidAmerican, any 
    existing customer or any future customer.
        Copies of the filing were served upon representatives of customers 
    having
    
    [[Page 7147]]
    
    service agreements under the MidAmerican OATT, the Iowa Utilities 
    Board, the Illinois Commerce Commission and the South Dakota Public 
    Utilities Commission.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Southern Indiana Gas and Electric Company
    
    [Docket No. ER98-1474-000]
    
        Take notice that on January 20, 1998, Southern Indiana Gas and 
    Electric Company (SIGECO), tendered for filing summary information on 
    transactions that occurred during the period October 1, 1997 through 
    December, 1997, pursuant to its Market Based Rate Sales Tariff accepted 
    by the Commission in Docket No. ER96-2734-000.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. UtiliCorp United Inc.
    
    [Docket No. ER98-1475-000]
    
        Take notice that on January 20, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed service agreements with Columbia Power Marketing 
    Corporation for service under its Non-Firm Point-to-Point open access 
    service tariff for its operating divisions, Missouri Public Service, 
    WestPlains Energy-Kansas and WestPlains Energy-Colorado.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Southwestern Public Service Company
    
    [Docket No. ER98-1476-000]
    
        Take notice that on January 20, 1998, New Century Services, Inc., 
    on behalf of Southwestern Public Service Company (Southwestern), 
    submitted an executed umbrella service agreement under Southwestern's 
    market-based sales tariff with El Paso Electric Company (EPE). This 
    umbrella service agreement provides for Southwestern's sale and EPE's 
    purchase of capacity and energy at market-based rates pursuant to 
    Southwestern's market-based sales tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Cambridge Electric Light Company
    
    [Docket No. ER98-1477-000]
    
        Take notice that on January 20, 1998, Cambridge Electric Light 
    Company (Cambridge), tendered for filing a non-firm point-to-point 
    transmission service agreement between Cambridge and Williams Energy 
    Services Company (Williams Energy). Cambridge states that the service 
    agreement sets out the transmission arrangements under which Cambridge 
    will provide non-firm point-to-point transmission service to Williams 
    Energy under Cambridge's open access transmission tariff accepted for 
    filing in Docket No. ER97-1337-000, subject to refund and issuance of 
    further orders.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Pennsylvania Power Company
    
    [Docket No. ER98-1478-000]
    
        Take notice that on January 20, 1998, FirstEnergy Corp., tendered 
    for filing on behalf of itself and Pennsylvania Power Company, a 
    Service Agreement for Network Integration Service under the 
    Pennsylvania Retail Pilot with Penn Power Energy, Inc., pursuant to the 
    FirstEnergy System Open Access Tariff. This Service Agreement will 
    enable the party to obtain Network Integration Service under the 
    Pennsylvania Retail Pilot in accordance with the terms of the Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Kansas City Power & Light Co.
    
    [Docket No. ER98-1479-000]
    
        Take notice that on January 20, 1998, Kansas City Power & Light 
    Company (KCPL), tendered for filing a Service Agreement dated January 
    6, 1998, between KCPL and NESI Power Marketing, Inc. KCPL proposes an 
    effective date of January 9, 1998, and requests waiver of the 
    Commission's notice requirement. This Agreement provides for the rates 
    and charges for Non-Firm Transmission Service.
        In its filing, KCPL states that the rates included in the above-
    mentioned Service Agreement are KCPL's rates and charges in the 
    compliance filing to FERC Order No. 888-A in Docket No. OA97-636.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Cinergy Services, Inc.
    
    [Docket No. ER98-1480-000]
    
        Take notice that on January 20, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing on behalf of its operating companies, 
    The Cincinnati Gas & Electric Company (CG&E), and PSI Energy, Inc. 
    (PSI), a First Supplemental Agreement, dated November 1, 1997, between 
    Tennessee Power Company and Cinergy.
        The First Supplemental Agreement revises the current language for 
    rates, terms and conditions of service, provides for the unbundling 
    language for the point of sale, adds language for reliability 
    guidelines, interface capacity available and credit worthiness, and 
    adds Market Based Power Service. The following Exhibit has also been 
    revised:
    
    B  Power Sales by the Cinergy Operating Companies and Cinergy Services
    
        Cinergy requests an effective date of one day after this First 
    Supplemental Agreement of the Interchange Agreement.
        Copies of the filing were served on Tennessee Power Company, the 
    Tennessee Public Service Commission, the Kentucky Public Service 
    Commission, the Public Utilities Commission of Ohio and the Indiana 
    Utility Regulatory Commission.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Cinergy Services, Inc.
    
    [Docket No. ER98-1481-000]
    
        Take notice that on January 20, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's 
    Power Sales Standard Tariff (the Tariff), entered into between Cinergy 
    and the Board of Public Utilities of Kansas City (Kansas City).
        Cinergy and Kansas City are requesting an effective date of one day 
    after the filing of this Power Sales Service Agreement.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Niagara Mohawk Power Corporation
    
    [Docket No. ER98-1482-000]
    
        Take notice that on January 20, 1998, Niagara Mohawk Power 
    Corporation (NMPC), tendered for filing with the Federal Energy 
    Regulatory Commission an executed Transmission Service Agreement 
    between NMPC and the New York Power authority to serve 16.9 MW of New 
    York Power authority power to Occidental Chemicals. This Transmission 
    Service Agreement specifies that the New York Power Authority has 
    signed on to and has agreed to the terms and conditions of NMPC's Open 
    Access Transmission Tariff as filed in Docket No. OA96-194-000. This 
    Tariff, filed with FERC on July 9, 1996, will allow NMPC and the New 
    York Power Authority to enter into separately scheduled transactions 
    under which NMPC will provide transmission service for the New York 
    Power Authority as the parties may mutually agree.
    
    [[Page 7148]]
    
        NMPC requests an effective date of May 23, 1997. NMPC has requested 
    waiver of the notice requirements for good cause shown.
        NMPC has served copies of the filing upon the New York State Public 
    Service Commission and the New York Power Authority.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. Cinergy Services, Inc.
    
    [Docket No. ER98-1483-000]
    
        Take notice that on January 20, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's 
    Power Sales Standard Tariff (the Tariff), entered into between Cinergy 
    and Allegheny Power (AP).
        Cinergy and AP are requesting an effective date of one day after 
    the filing of this Power Sales Service Agreement.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Cinergy Services, Inc.
    
    [Docket No. ER98-1484-000]
    
        Take notice that on January 20, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing on behalf of its operating companies, 
    The Cincinnati Gas & Electric Company (CG&E), and PSI Energy, Inc. 
    (PSI), a First Supplemental Agreement, dated November 1, 1997, between 
    Citizens Power Sales and Cinergy.
        The First Supplemental Agreement revises the current language for 
    rates, terms and conditions of service, provides for the unbundling 
    language for the point of sale, adds language for reliability 
    guidelines, interface capacity available and credit worthiness, and 
    adds Market Based Power Service. The following Exhibit has also been 
    revised:
    
    B  Power Sales by the Cinergy Operating Companies and Cinergy Services
    
        Cinergy requests an effective date of one day after this First 
    Supplemental Agreement of the Interchange Agreement.
        Copies of the filing were served on Citizens Power Sales, the 
    Massachusetts Department of Public Utilities, the Kentucky Public 
    Service Commission, the Public Utilities Commission of Ohio and the 
    Indiana Utility Regulatory Commission.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Wolverine Power Supply Cooperative, Inc.
    
    [Docket No. ER98-1485-000]
    
        Take notice that on January 20, 1998, Wolverine Power Supply 
    Cooperative, Inc. (Wolverine), tendered for filing an Informational 
    Filing in compliance with Order No. 888. Wolverine proposes no change 
    in rates.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. Equinox Energy, LLC
    
    [Docket No. ER98-1486-000]
    
        Take notice that on January 20, 1998, Equinox Energy, LLC 
    (Equinox), petitioned the Commission for acceptance of Equinox Rate 
    Schedule FERC No. 1; the granting of certain blanket approvals, 
    including the authority to sell electricity at market-based rates; and 
    the waiver of certain Commission Regulations.
        Equinox intends to engage in wholesale electric power and energy 
    purchases and sales as a marketer. Equinox is not in the business of 
    generating or transmitting electric power. Equinox is a Minnesota 
    limited liability corporation with its principal place of business in 
    Minneapolis, Minnesota. Equinox is commencing involvement in natural 
    gas marketing and the marketing of electricity. Equinox is an 
    independently owned entity that is located in the offices of Equinox 
    Enterprises, Inc. Equinox Enterprises, Inc., is primarily engaged in 
    the brokering and trading of agricultural commodities.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. Commonwealth Electric Company and Cambridge Electric Light 
    Company
    
    [Docket No. ER98-1487-000]
    
        Take notice that on January 20, 1998, Commonwealth Electric Company 
    (Commonwealth), and Cambridge Electric Light Company (Cambridge), 
    collectively referred to as the Companies, tendered for filing with the 
    Federal Energy Regulatory Commission their quarterly reports under 
    Commonwealth's Market-Based Power Sales Tariff (FERC Electric Tariff 
    Original Volume No. 7) and Cambridge's Market-Based Power Sales Tariff 
    (FERC Electric Tariff Original Volume No. 9) for the period of October 
    1, 1997 to December 31, 1997.
        Comment Date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. Minnesota Power & Light Company
    
    [Docket No. ER98-1488-000]
    
        Take notice that on January 20, 1998, Minnesota Power & Light 
    Company, tendered for filing signed Service Agreements for Non-Firm 
    Point-to-Point and Short-term Point-to-Point Service with Griffin 
    Energy Marketing, LLC under its Non-Firm and Short-Term Point-to-Point 
    Transmission Service to satisfy its filing requirements under this 
    tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Potomac Electric Power Company
    
    [Docket No. ER98-1490-000]
    
        Take notice that on January 20, 1998, Potomac Electric Power 
    Company (Pepco), tendered for filing service agreements pursuant to 
    Pepco's FERC Electric Tariff, Original Volume No. 1, entered into 
    between Pepco and Strategic Energy Limited, QST Energy Trading 
    Incorporated, Energis Resources Incorporated, American Electric Power 
    Service Corporation, and New Energy Ventures, L.L.C. An effective date 
    of December 31, 1997, for these service agreements, with waiver of 
    notice, is requested.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Louisville Gas and Electric Company
    
    [Docket No. ER98-1491-000]
    
        Take notice that on January 20, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and City Water, 
    Light and Power, Springfield, Illinois under LG&E's Open Access 
    Transmission Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. Louisville Gas and Electric Company
    
    [Docket No. ER98-1492-000]
    
        Take notice that on January 20, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Aquila Power 
    Corporation under LG&E's Open Access Transmission Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 7149]]
    
    25. Louisville Gas and Electric Company
    
    [Docket No. ER98-1493-000]
    
        Take notice that on January 20, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Engage Energy 
    US, L.P., under LG&E's Open Access Transmission Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. Niagara Mohawk Power Corporation
    
    [Docket No. ER98-1494-000]
    
        Take notice that on January 20, 1998, Niagara Mohawk Power 
    Corporation (NMPC), tendered for filing with the Federal Energy 
    Regulatory Commission an executed Transmission Service Agreement 
    between NMPC and New Energy Ventures, L.L.C. This Transmission Service 
    Agreement specifies that New Energy Ventures, L.L.C., has signed on to 
    and has agreed to the terms and conditions of NMPC's Open Access 
    Transmission Tariff as filed in Docket No. OA96-194-000]. This Tariff, 
    filed with FERC on July 9, 1996, will allow NMPC and New Energy 
    Ventures, L.L.C., to enter into separately scheduled transactions under 
    which NMPC will provide transmission service for New Energy Ventures, 
    L.L.C., as the parties may mutually agree.
        NMPC requests an effective date of February 1, 1998. NMPC has 
    requested waiver of the notice requirements for good cause shown.
        NMPC has served copies of the filing upon the New York State Public 
    Service Commission and New Energy Ventures, L.L.C.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. Louisville Gas and Electric Company
    
    [Docket No. ER98-1495-000]
    
        Take notice that on January 20, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Wabash Valley 
    Power Association, Inc., under LG&E's Open Access Transmission Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. Louisville Gas and Electric Company
    
    [Docket No. ER98-1496-000]
    
        Take notice that on January 20, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Southern 
    Energy Trading and Marketing, Inc., under LG&E's Open Access 
    Transmission Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. Louisville Gas and Electric Company
    
    [Docket No. ER98-1497-000]
    
        Take notice that on January 20, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Wisconsin 
    Electric Power Company under LG&E's Open Access Transmission Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    30. Louisville Gas and Electric Company
    
    [Docket No. ER98-1498-000]
    
        Take notice that on January 20, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and American 
    Electric Power Corporation under LG&E's Open Access Transmission 
    Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    31. Minnesota Power & Light Company
    
    [Docket No. ER98-1504-000]
    
        Take notice that on January 21, 1998, Minnesota Power & Light 
    Company (Minnesota Power), tendered for filing a Non-firm Point-to-
    Point Transmission Service Agreement and a Firm Point-to-Point 
    Transmission Service Agreement together with Specifications for Long-
    Term Firm Point-to-Point Service (the Service Agreement), between 
    Minnesota Power, as the transmission provider, and Minnesota Power, as 
    the transmission customer, for service to the City of Hibbing. 
    Minnesota Power requests that the Service Agreement be made effective 
    sixty days from the date of filing.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    32. Minnesota Power & Light Company
    
    [Docket No. ER98-1505-000]
    
        Take notice that on January 21, 1998, Minnesota Power & Light 
    Company (MP), tendered for filing Supplement No. 5 to its Electric 
    Service Agreement with the Public Utilities Commission of Grand Rapids, 
    Minnesota (Grand Rapids). MP states that the amendment extends the term 
    of the Agreement to December 31, 2004.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    33. Virginia Electric and Power Company
    
    [Docket No. ER98-1506-000]
    
        Take notice that on January 21, 1998, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing the Service Agreements 
    between Virginia Electric and Power Company and Tenaska Power Services 
    Company and Virginia Electric and Power Company and New Energy 
    Ventures, L.L.C., under the FERC Electric Tariff (First Revised Volume 
    No. 4), which was accepted by order of the Commission dated November 6, 
    1997, in Docket No. ER97-3561-001. Under the tendered Service 
    Agreements, Virginia Power will provide services to Tenaska Power 
    Services Company and New Energy Ventures, L.L.C., under the rates, 
    terms and conditions of the applicable Service Schedules included in 
    the Tariff. Virginia Power requests an effective date of January 21, 
    1998, the date of filing the Service Agreements.
        Copies of the filing were served upon Tenaska Power Services 
    Company and New Energy Ventures, L.L.C., the Virginia State Corporation 
    Commission and the North Carolina Utilities Commission.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    34. Minnesota Power & Light Company
    
    [Docket No. ER98-1507-000]
    
        Take notice that on January 21, 1998, Minnesota Power & Light 
    Company tendered for filing signed Service Agreements for Non-Firm and 
    Umbrella Firm Point-to-Point Service with Tenaska Power Services 
    Company under its Non-Firm and Short-Term Point-to-Point Transmission 
    Service to satisfy its filing requirements under this tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 7150]]
    
    35. Northeast Utilities Service Company
    
    [Docket No. ER98-1508-000]
    
        Take notice that on January 21, 1998, Northeast Utilities Service 
    Company (NUSCO), tendered for filing, a Service Agreement with Long 
    Island Lighting Company, under the NU System Companies' Sale for 
    Resale, Tariff No. 7.
        NUSCO states that a copy of this filing has been mailed to the Long 
    Island Lighting Company.
        NUSCO requests that the Service Agreement become effective January 
    1, 1998.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    36. FirstEnergy System
    
    [Docket No. ER98-1509-000]
    
        Take notice that on January 21, 1998, FirstEnergy System filed a 
    Service Agreement to provide Non-Firm Point-to-Point Transmission 
    Service for Engage Energy US, L.P., the Transmission Customer. Services 
    are being provided under the FirstEnergy System Open Access 
    Transmission Tariff submitted for filing by the Federal Energy 
    Regulatory Commission in Docket No. ER97-412-000. The proposed 
    effective date under this Service Agreement is January 1, 1998.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    37. Wisconsin Public Service Corporation
    
    [Docket No. ER98-1510-000]
    
        Take notice that on January 21, 1998, Wisconsin Public Service 
    Corporation (WPSC), tendered for filing executed agreements for service 
    to the Village of Stratford Water & Electric Utility (Stratford), under 
    WPSC's Market-Based Rate Tariff and Open Access Transmission Tariff, as 
    well as a Network Operating Agreement and a Network Service Billing 
    Agreement. WPSC requests that the Commission make the agreements 
    effective on December 23, 1997.
        WPSC states that copies of this filing have been served on 
    Stratford, on the Michigan Public Service Commission and on the Public 
    Service Commission of Wisconsin.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    38. New England Power Company
    
    [Docket No. ER98-1511-000]
    
        Take notice that on January 21, 1998, New England Power Company 
    (NEP), filed a Service Agreement with Cinergy Capital & Trading Inc., 
    for non-firm, point-to-point transmission service under NEP's open 
    access transmission tariff, FERC Electric Tariff, Original Volume No. 
    9.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    39. FirstEnergy Corp., and Pennsylvania Power Company
    
    [Docket No. ER98-1512-000]
    
        Take notice that on January 21, 1998, FirstEnergy Corp., tendered 
    for filing on behalf of itself and Pennsylvania Power Company, a 
    Service Agreement for Network Integration Service under the 
    Pennsylvania Retail Pilot with Allegheny Energy Solutions, Incorporated 
    pursuant to the FirstEnergy System Open Access Tariff. This Service 
    Agreement will enable the party to obtain Network Integration Service 
    under the Pennsylvania Retail Pilot in accordance with the terms of the 
    Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    40. New England Power Company
    
    [Docket No. ER98-1513-000]
    
        Take notice that on January 21, 1998, New England Power Company 
    filed an amendment to one of its power contracts with Unitil Power 
    Corp., the original of which contract is on file with and accepted by 
    the Commission on Docket ER93-362-000.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    41. Louisville Gas and Electric Company
    
    [Docket No. ER98-1514-000]
    
        Take notice that on January 21, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing a Notice of Cancellation of a Non-
    Firm Transmission Agreement between LG&E and Delhi Energy Services 
    under LG&E's Open Access Transmission Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    42. Louisville Gas and Electric Company
    
    [Docket No. ER98-1515-000]
    
        Take notice that on January 21, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing a refund report for certain 
    transactions made under LG&E's Open Access Transmission Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    43. Louisville Gas and Electric Company
    
    [Docket No. ER98-1516-000]
    
        Take notice that on January 21, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing a Notice of Cancellation of a 
    Purchase Sales Agreement between LG&E and Delhi Energy Services under 
    LG&E's Market-Based Rate Schedule GSS.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    44. SCANA Energy Marketing, Inc.
    
    [Docket No. ER98-1517-000]
    
        Take notice that on January 21, 1998, SCANA Energy Marketing, Inc. 
    (SCANA), tendered for filing a letter from the Executive Committee of 
    the Western Systems Power Pool (WSPP), indicating that SCANA 
    application for membership in WSPP has been approved. SCANA requests 
    that the Commission amend the WSPP Agreement to include it as a member.
        SCANA requests an effective date of January 22, 1998, for the 
    proposed amendment. Accordingly, SCANA requests waiver of the 
    Commission's prior notice requirements for good cause shown.
        Copies of the filing were served upon the WSPP Executive Committee.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    45. PJM Interconnection, L.L.C.
    
    [Docket No. ER98-1518-000]
    
        Take notice that on January 21, 1998 the PJM Interconnection, 
    L.L.C. (PJM), filed on behalf of the Members of the LLC, membership 
    application of EnerZ Corporation. PJM requests an effective date on the 
    day after this notice of filing is received by FERC.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    46. Niagara Mohawk Power Corporation
    
    [Docket No. ER98-1519-000]
    
        Take notice that on January 20, 1998, Niagara Mohawk Power 
    Corporation (NMPC), tendered for filing with the Federal Energy 
    Regulatory Commission an executed Transmission Service Agreement 
    between NMPC and New Energy Ventures, L.L.C. This Transmission Service 
    Agreement specifies that New Energy Ventures, L.L.C., has signed on to 
    and has agreed to the terms and conditions of NMPC's Open Access 
    Transmission Tariff as filed in Docket No. OA96-194-000. This Tariff, 
    filed with FERC on July 9, 1996,
    
    [[Page 7151]]
    
    will allow NMPC and New Energy Ventures, L.L.C., to enter into 
    separately scheduled transactions under which NMPC will provide 
    transmission service for New Energy Ventures, L.L.C., as the parties 
    may mutually agree.
        NMPC requests an effective date of March 1, 1998. NMPC has 
    requested waiver of the notice requirements for good cause shown.
        NMPC has served copies of the filing upon the New York State Public 
    Service Commission and New Energy Ventures, L.L.C.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    47. NUI Energy, Inc.
    
    [Docket No. ER98-1520-000]
    
        Take notice that on January 20, 1998, NUI Energy, Inc. (NUI 
    Energy), tendered for filing, pursuant to Rule 205, 18 CFR 385.205, an 
    application for authorization to make wholesale sales of electric power 
    in interstate commerce at market-based rates; a request that the 
    Commission accept and approve NUI Energy's Electric Rate Schedule FERC 
    No. 1, to be effective on the earlier of the date of the Commission's 
    order in this proceeding or March 21, 1998, and for such waivers and 
    authorizations as have been customarily been granted to other power 
    marketers, with the clarifications noted in its application.
        NUI Energy is a corporation organized under the State of Delaware 
    and has its principal place of business in Bedminister, New Jersey. NUI 
    Energy is a wholly owned subsidiary of NUI Capital Corporation which in 
    turn is a wholly owned subsidiary of NUI Corporation, a publicly traded 
    corporation which owns natural gas distribution facilities in six 
    states. Neither NUI Energy, nor its affiliates, own, operate, or 
    control any electric generation, transmission, or distribution 
    facilities. Furthermore, neither NUI Energy, nor its affiliates, hold a 
    franchise for the transmission, distribution, or sale of electric 
    power, or own or control any other barriers to entry to the electric 
    power market.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    48. Consumers Energy Company
    
    [Docket No. ER98-1521-000]
    
        Take notice that on January 22, 1998, Consumers Energy Company 
    (Consumers), tendered for filing executed service agreements for Non-
    Firm Point-to-Point Transmission Service pursuant to the Joint Open 
    Access Transmission Service Tariff filed on December 31, 1996, by 
    Consumers and The Detroit Edison Company (Detroit Edison), with the 
    following transmission customer, Consumers Energy Company--Electric 
    Sourcing & Trading.
        Copies of the filed agreement were served upon the Michigan Public 
    Service Commission, Detroit Edison and the transmission customer.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    49. Cambridge Electric Light Company
    
    [Docket No. ER98-1522-000]
    
        Take notice that on January 21, 1998, Cambridge Electric Light 
    Company (Cambridge), tendered for filing with the Federal Energy 
    Regulatory Commission a Supplemental Filing containing clarifications 
    to the Net Requirements Power Supply Agreement (Agreement), Appendix B 
    formula rate in compliance with the Commission's Order issued on June 
    18, 1993 in Docket No. ER93-433-000.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    50. Narragansett Electric Company
    
    [Docket No. ER98-1523-000]
    
        Take notice that on January 22, 1998, Narragansett Electric Company 
    tendered for filing rate changes to its FERC Electric Tariff, Original 
    Volume No. 1, for borderline sales.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    51. Virginia Electric and Power Company
    
    [Docket No. ER98-1525-000]
    
        Take notice that on January 22, 1998, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing Service Agreements for 
    Firm Point-to-Point Transmission Service with North American Energy 
    Conservation, Inc. (NAEC), and Tennessee Valley Authority under the 
    Open Access Transmission Tariff to Eligible Purchasers dated July 14, 
    1997. Under the tendered Service Agreement, Virginia Power will provide 
    firm point-to-point service to the Transmission Customers under the 
    rates, terms and conditions of the Open Access Transmission Tariff.
        Copies of the filing were served upon North American Energy 
    Conservation, Inc. (NAEC), and Tennessee Valley Authority, the Virginia 
    State Corporation Commission and the North Carolina Utilities 
    Commission.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    52. Indeck Pepperell Power Associates Inc.
    
    [Docket No. ER98-1526-000]
    
        Take notice that on January 21, 1998, Indeck Pepperell Power 
    Associates, Inc., tendered for filing a summary of activity for the 
    quarter ending December 31, 1997.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    53. Carolina Power & Light Company
    
    [Docket No. ER98-1528-000]
    
        Take notice that on January 22, 1998, Carolina Power & Light 
    Company (CP&L), tendered for filing Service Agreements for Network 
    Integration Transmission Service executed between CP&L and the 
    following Eligible Transmission Customers Town of Stantonsburg, NC, 
    Town of Black Creek, NC, and the Town of Lucama, NC. Service to each 
    Eligible Customer will be in accordance with the terms and conditions 
    of Carolina Power & Light Company's Open Access Transmission Tariff.
        Copies of the filing were served upon the North Carolina Utilities 
    Commission and the South Carolina Public Service Commission.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    54. PacifiCorp
    
    [Docket No. ER98-1529-000]
    
        Take notice that on January 22, 1998, PacifiCorp, tendered for 
    filing in accordance with 18 CFR Part 35 of the Commission's 
    Regulations, Non-Firm and Short-Term Firm Point-To-Point Transmission 
    Service Agreements with Colorado Springs Utilities under PacifiCorp's 
    FERC Electric Tariff, First Revised Volume No. 11.
        Copies of this filing were supplied to the Washington Utilities and 
    Transportation Commission and the Public Utility Commission of Oregon.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    55. PacifiCorp
    
    [Docket No. ER98-1530-000]
    
        Take notice that PacifiCorp on January 22, 1998, tendered for 
    filing in accordance with 18 CFR Part 35 of the Commission's Rules and 
    Regulations, a Notice of Filing of a Mutual Netting/Closeout Agreement 
    (Netting Agreement) between PacifiCorp and
    
    [[Page 7152]]
    
    Vitol Gas and Electric LLC (Vitol). PacifiCorp has requested that the 
    Commission rule that the Netting Agreement is not subject to the 
    Commission's jurisdiction.
        Copies of this filing were supplied to Delhi Energy Services, Inc., 
    the Washington Utilities and Transportation Commission and the Public 
    Utility Commission of Oregon.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    56. Washington Water Power
    
    [Docket No. ER98-1531-000]
    
        Take notice that on January 22, 1998, Washington Water Power, 
    tendered for filing with the Federal Energy Regulatory Commission 
    pursuant to 18 CFR 35.13, executed a Service Agreement under WWP's FERC 
    Electric Tariff First Revised Volume No. 9, with Mock Energy Services, 
    L.P. (formerly known as Mock Resources, Inc.), which replaces an 
    unexecuted service agreement previously filed with the Commission under 
    Docket No. ER97-1252-000, Service Agreement No. 84, effective December 
    15, 1996.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    57. San Diego Gas & Electric Company
    
    [Docket No. ER98-1533-000]
    
        Take notice that on January 22, 1998, San Diego Gas & Electric 
    Company (SDG&E), tendered for filing and acceptance, a Service 
    Agreement (Service Agreement), with Enron Power Marketing, Inc., for 
    Point-To-Point Transmission Service under SDG&E's Open Access 
    Transmission Tariff (Tariff), filed in compliance with FERC Order No. 
    888-A.
        SDG&E filed the executed Service Agreement with the Commission in 
    compliance with applicable Commission Regulations. SDG&E also provided 
    Sheet No. 114 (Attachment E) to the Tariff, which is a list of current 
    subscribers. SDG&E requests waiver of the Commissions notice 
    requirement to permit an effective date of January 2, 1998.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    58. Entergy Services, Inc.
    
    [Docket No. ER98-1534-000]
    
        Take notice that on January 22, 1998, Entergy Services, Inc. 
    (Entergy Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf 
    States, Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and 
    Entergy New Orleans, Inc. (collectively, the Entergy Operating 
    Companies), tendered for filing a Short-Term Firm Point-To-Point 
    Transmission Service Agreement between Entergy Services, as agent for 
    the Entergy Operating Companies, and Columbia Power Marketing 
    Corporation.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    59. Entergy Services, Inc.
    
    [Docket No. ER98-1535-000]
    
        Take notice that on January 22, 1998, Entergy Services, Inc. 
    (Entergy Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf 
    States, Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and 
    Entergy New Orleans, Inc. (collectively, the Entergy Operating 
    Companies), tendered for filing a Non-Firm Point-To-Point Transmission 
    Service Agreement between Entergy Services, as agent for the Entergy 
    Operating Companies, and Columbia Power Marketing Corporation.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    60. Florida Power & Light Company
    
    [Docket No. ER98-1536-000]
    
        Take notice that on January 23, 1998, Florida Power & Light Company 
    (FPL), proposed to terminate the following agreements, (1) The Contract 
    for Interchange Service between FPL and Ft. Pierce Utilities Authority, 
    (2) the Non-Firm Service Agreement between FPL and Ft. Pierce Utilities 
    Authority, and (3) the Short Term Transmission Service Agreement 
    between FPL and the Ft. Pierce Utilities Authority. The Ft. Pierce 
    Utilities Authority will take service under Amendment Number four to 
    the Network Service Agreement between FPL and FMPA to be effective 
    January 12, 1998. FPL proposes to make the termination effective 
    January 12, 1998.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    61. Northern Indiana Public Service Company
    
    [Docket No. ER98-1537-00]
    
        Take notice that on January 23, 1998, Northern Indiana Public 
    Service Company tendered for filing an executed Sales Service Agreement 
    and an executed Standard Transmission Service Agreement for Non-Firm 
    Point-to-Point Transmission Service between Northern Indiana Public 
    Service Company and DTE Energy Trading, Inc.
        Under the Transmission Service Agreement, Northern Indiana Public 
    Service Company will provide Point-to-Point Transmission Service to DTE 
    Energy Trading, Inc., pursuant to the Transmission Service Tariff filed 
    by Northern Indiana Public Service Company in Docket No. OA96-47-000 
    and allowed to become effective by the Commission. Under the Sales 
    Service Agreement, Northern Indiana Public Service company will provide 
    general purpose energy and negotiated capacity to DTE Energy Trading 
    pursuant to the Wholesale Sales Tariff field by Northern Indiana Public 
    Service company in Docket No. ER95-1222-000 as amended by the 
    Commission's Order in Docket No. ER97-458-000 and allowed to become 
    effective by the Commission. Northern Indiana Public Service Company 
    has requested that the Service Agreements be allowed to become 
    effective as of January 31, 1998.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    62. Illinois Power Company
    
    [Docket No. ER98-1538-000]
    
        Take notice that on January 23, 1998, Illinois Power Company 
    (Illinois Power), 500 South 27th Street, Decatur, Illinois 62526, 
    tendered for filing firm and non-firm transmission agreements under 
    which DTE Energy Trading will take transmission service pursuant to its 
    open access transmission tariff. The agreements are based on the Form 
    of Service Agreement in Illinois Power's tariff.
        Illinois Power has requested an effective date of January 15, 1998.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    63. Houston Lighting & Power Company
    
    [Docket No. ER98-1539-000]
    
        Take notice that on January 23, 1998, Houston Lighting & Power 
    Company (HL&P), tendered for filing an executed transmission service 
    agreement (TSA), with (1) Coral Power, L.L.C. (Coral); (2) Electric 
    Clearinghouse, Inc. (ECI); (3) Aquila Power Corporation (Aquila), and 
    (4) Vitol Gas & Electric L.L.C. (Vitol), for Non-Firm Transmission 
    Service under HL&P's FERC Electric Tariff, Third Revised Volume No. 1, 
    for Transmission Service To, From and Over Certain HVDC 
    Interconnections. HL&P has
    
    [[Page 7153]]
    
    requested an effective date of January 23, 1998.
        Copies of the filing were served on Coral, ECI, Aquila and Vitol 
    and the Public Utility Commission of Texas.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    64. Louisville Gas and Electric Company
    
    [Docket No. ER98-1540-000]
    
        Take notice that on January 23, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Tennessee 
    Valley Authority (TVA), under LG&E's Open Access Transmission Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    65. Louisville Gas and Electric and Gas Company
    
    [Docket No. ER98-1541-000]
    
        Take notice that on January 23, 1998, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Service Agreement 
    between LG&E and Allegheny Power under LG&E's Rate Schedule GSS.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    66. Public Service Electric and Gas Company
    
    [Docket No. ER98-1542-000]
    
        Take notice that Public Service Electric and Gas Company (PSE&G), 
    of Newark, New Jersey on January 23, 1998, tendered for filing an 
    agreement for the sale of capacity and energy to Strategic Energy LTD. 
    (SEL), pursuant to the PSE&G Wholesale Power Market Based Sales Tariff, 
    presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of December 29, 1997.
        Copies of the filing have been served upon SEL and the New Jersey 
    Board of Public Utilities.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    67. Public Service Electric and Gas Company
    
    [Docket No. ER98-1543-000]
    
        Take notice that Public Service Electric and Gas Company (PSE&G), 
    of Newark, New Jersey on January 23, 1998, tendered for filing an 
    agreement for the sale of capacity and energy to the Borough of South 
    River, New Jersey (South River), pursuant to the PSE&G Wholesale Power 
    Market Based Sales Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of December 29, 1997.
        Copies of the filing have been served upon South River and the New 
    Jersey Board of Public Utilities.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    68. Public Service Electric and Gas Company
    
    [Docket No. ER98-1544-000]
    
        Take notice that on January 23, 1998, Public Service Electric and 
    Gas Company (PSE&G), of Newark, New Jersey tendered for filing an 
    agreement for the sale of capacity and energy to the Borough of 
    Milltown, New Jersey (Milltown), pursuant to the PSE&G Wholesale Power 
    Market Based Sales Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of December 29, 1997.
        Copies of the filing have been served upon Milltown and the New 
    Jersey Board of Public Utilities.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    69. Public Service Electric and Gas Company
    
    [Docket No. ER98-1545-000]
    
        Take notice that on January 23, 1998, Public Service Electric and 
    Gas Company (PSE&G), of Newark, New Jersey tendered for filing an 
    agreement for the sale of capacity and energy to Columbia Power 
    Marketing Corporation (Columbia), pursuant to the PSE&G Wholesale Power 
    Market Based Sales Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of December 29, 1997.
        Copies of the filing have been served upon Columbia and the New 
    Jersey Board of Public Utilities.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    70. Public Service Electric and Gas Company
    
    [Docket No. ER98-1546-000]
    
        Take notice that on January 23, 1998, Public Service Electric and 
    Gas Company (PSE&G), of Newark, New Jersey, tendered for filing an 
    agreement for the sale of capacity and energy to South Jersey Energy 
    Company (SJEC), pursuant to the PSE&G Wholesale Power Market Based 
    Sales Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of December 29, 1997.
        Copies of the filing have been served upon SJEC and the New Jersey 
    Board of Public Utilities.
        Comment date; February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    71. Central Illinois Light Company
    
    [Docket No. ER98-1548-000]
    
        Take notice that Central Illinois Light Company (CILCO), 300 
    Liberty Street, Peoria, Illinois 61602, on January 23, 1998, tendered 
    for filing with the Commission a substitute Index of Point-To-Point 
    Transmission Service Customers under its Open Access Transmission 
    Tariff and service agreements for two new customers, Commonwealth 
    Edison Company and Tenaska Power Services Company.
        CILCO requested an effective date of January 1, 1998.
        Copies of the filing were served on the affected customers and the 
    Illinois Commerce Commission.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    72. Dayton Power & Light Company
    
    [Docket No. ER98-1549-000]
    
        Take notice that on January 23, 1998, Dayton Power & Light Company 
    (Dayton), submitted short-term firm transmission service agreements 
    establishing Aquila Power Corporation as customers under the terms of 
    Dayton's Open Access Transmission Tariff.
        Dayton requests an effective date of one day subsequent to this 
    filing for the service agreements. Accordingly, Dayton requests waiver 
    of the Commission's notice requirements.
        Copies of this filing were served upon Aquila Power Corporation and 
    the Public Utilities Commission of Ohio.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    73. Dayton Power & Light Company
    
    [Docket No. ER98-1550-000]
    
        Take notice that on January 23, 1998, Dayton Power & Light Company 
    (Dayton), submitted service agreements establishing Aquila Power 
    Corporation
    
    [[Page 7154]]
    
    as a customer under the terms of Dayton's Open Access Transmission 
    Tariff.
        Comment date: February 19, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    74. Southern California Edison Company
    
    [Docket No. OA97-445-002]
    
        Take notice that on February 2, 1998, Southern California Edison 
    Company (SoCal Ed), submitted revised standards of conduct under Order 
    Nos. 889 et seq.1 SoCal Ed states that it is revising its 
    standards to incorporate the changes required by the Commission's 
    December 18, 1997, Order on Standards of Conduct.2
    ---------------------------------------------------------------------------
    
        \1\ Open Access Same-Time Information System (Formerly Real-Time 
    Information Network) and Standards of Conduct, 61 FR 21737 (May 10, 
    1996), FERC Stats, & Regs., Regulations Preambles January 1991-June 
    1996 para. 31,035 (April 24, 1996); Order No. 889-A, order on 
    rehearing, 62 FR 12484 (March 14, 1997), III FERC, Stats. & Regs. 
    para. 31,049 (March 4, 1997); Order No. 889-B, rehearing denied, 62 
    FR 64715 (December 9, 1997), 81 FERC para. 61,253 (November 25, 
    1997).
        \2\ Allegheny Power Service Corporation, et al., 81 FERC para. 
    61,339 (1997).
    ---------------------------------------------------------------------------
    
        SoCal Ed states that copies of this filing have been mailed to all 
    parties on the official service list compiled by the Secretary in this 
    proceeding.
        Comment date: February 20, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of these filings are on file with 
    the Commission and are available for public inspection.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-3551 Filed 2-11-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
02/12/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-3551
Dates:
February 25, 1998, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
7146-7154 (9 pages)
Docket Numbers:
Docket No. EG98-37-000, et al.
PDF File: