[Federal Register Volume 64, Number 29 (Friday, February 12, 1999)]
[Notices]
[Pages 7181-7188]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-3453]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EF99-4011-000, et al.]
Southwestern Power Administration, et al.; Electric Rate and
Corporate Regulation Filings
February 4, 1999.
Take notice that the following filings have been made with the
Commission:
1. Southwestern Power Administration
[Docket No. EF99-4011-000]
Take notice that on January 29, 1999, the Deputy Secretary, U.S.
Department of Energy, submitted to the Federal Energy Regulatory
Commission (FERC) for confirmation and approval on a final basis,
pursuant to the authority vested in the FERC by Delegation Order No.
0204-108, as amended November 10, 1993, 58 FR 59717, the following
Southwestern Power Administration (Southwestern) Integrated System rate
schedules:
Rate Schedule P-98B, Wholesale Rates for Hydro Peaking Power
Rate Schedule NFTS-98B, Wholesale Non-Federal Transmission Service
The Integrated System rate schedules were confirmed and approved on
an interim basis by the Deputy Secretary in Rate Order No. SWPA-39 for
the period January 1, 1999, through September 30, 2001, and have been
submitted to the FERC for confirmation and approval on a final basis
for the same period. The FY 1998 Power Repayment Study has confirmed
that rates prescribed by currently-approved Rate Schedules P-98A,
Wholesale Rates for Hydro Peaking Power, and NFTS-98, Wholesale Rates
for Non-Federal Transmission Service, are sufficient to meet repayment
criteria and do not require any adjustment. However, certain aspects of
the terms and conditions set forth in the rate schedules need to be
revised to clarify and accommodate market conditions experienced during
this past year.
The names of the rate schedules have been changed from P-98A and
NFTS-98 to P-98B and NFTS-98B to reflect the fact that revisions have
been made. Minor corrections and modifications were made throughout the
rate schedules for clarification purposes. The basis for determining
the rate for Real Power Losses has been revised in both rate schedules.
This change is required since the Energy Information Administration no
longer compiles the information which was the basis for determining the
rate for losses. In addition, the Capacity Overrun Penalty provisions
have been revised to provide a greater incentive to not overrun
Southwestern's Integrated System capacity. The penalty set forth in the
current rate schedules was insufficient to serve as a deterrent in
light of this past summer's price escalation. These changes will have
no impact on the amortization or status of repayment forecasted in the
power repayment studies and will not require rate changes. Revenues
based on current rates remain sufficient to meet repayment criteria.
Comment date: February 25, 1999, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 7182]]
2. PSEG PPN Energy Company Ltd.
[Docket No. EG99-41-000]
Take notice that on January 29, 1999, PSEG PPN Energy Company Ltd.
(PSEG PPN), with its principal office at 608 St. James Court, St. Denis
Street, Port Louis, Mauritius filed with the Federal Energy Regulatory
Commission an amended application for determination of exempt wholesale
generator status pursuant to Part 365 of the Commission's regulations.
PSEG PPN is a company organized under the laws of Mauritius. PSEG
PPN will be engaged, directly or indirectly through an affiliate as
defined in Section 2(a)(11)(B) of the Public Utility Holding Company
Act of 1935, exclusively in owning, or both owning and operating a gas
and/or naphtha-fired combined cycle generating facility consisting of
one electric generating unit with a nameplate rating of approximately
347 megawatts and incidental facilities located in Tamil Nadu, India;
selling electric energy at wholesale and engaging in project
development activities with respect thereto. PSEG PPN amended its
original application to indicate that it has no current plans of
engaging in fuel delivery or brokering activities.
Comment date: February 25, 1999, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the amended application.
3. Western Power Trading Forum Complainant, v. California
Independent System Operator Corporation Respondent
[Docket No. EL99-30-000]
Take notice that on January 20, 1999, the Western Power Trading
Forum (Complainant) filed a complaint and request for expedited relief
under Sections 206 and 306, et seq., of the Federal Power Act, 16
U.S.C. Secs. 824e and 825e (1994), and Section 206 of the Commission's
Rules of practice and procedure, 18 CFR 385.206, alleging that the Grid
Management Charge of the California Independent System Operator
Corporation (ISO) is unjust, unreasonable, unduly discriminatory,
anticompetitive, excessive, and in violation of a prior ISO settlement
approved in Docket Nos. ER98-211-000, et al.
Comment date: March 5, 1999, in accordance with Standard Paragraph
E at the end of this notice.
4. Ocean Vista Power Generation, L.L.C.
[Docket No. ER99-1536-000]
Take notice that, on January 29, 1999, Ocean Vista Power
Generation, L.L.C. submitted a report of transactions that occurred
under its Market-Based Power Sales Tariffs during the quarter ending
December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
5. Mountain Vista Power Generation, L.L.C.
[Docket No. ER99-1537-000]
Take notice that, on January 29, 1999, Mountain Vista Power
Generation, L.L.C. submitted a report of transactions that occurred
under its Market-Based Power Sales Tariffs during the quarter ending
December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
6. Energy Services, Inc.
[Docket No. ER99-1538-000]
Take notice that on January 29, 1999, Energy Services, Inc.
tendered for filing its report of transactions for the quarter ending
December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
7. Duke Energy Marketing Corp.
[Docket No. ER99-1539-000]
Take notice that on January 29, 1999, Duke Energy Marketing Corp.
(DEMC) tendered for filing its report of transactions for the quarter
ending December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
8. Southwestern Public Service Company
[Docket No. ER99-1540-000]
Take notice that on January 29, 1999, New Century Services, Inc.,
on behalf of Southwestern Public Service Company (Southwestern),
submitted a Quarterly Report under Southwestern's market-based sales
tariff. The report is for the period of October 1, 1999 through
December 31, 1999.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
9. Consumers Energy Company
[Docket No. ER99-1541-000]
Take notice that on January 29, 1999, Consumers Energy Company
filed a report that it made no market based sales under its wholesale
power sales tariff for the quarter ending December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
10. The Detroit Edison Company
[Docket No. ER99-1542-000]
Take notice that on January 29, 1999, The Detroit Edison Company
filed a summary of market based sales under its market-based rate
wholesale power sales tariff for the calendar quarter ending December
31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
11. Virginia Electric and Power Company
[Docket No. ER99-1543-000 ]
Take notice that on January 29, 1999, Virginia Electric and Power
Company (Virginia Power) tendered for filing a summary of short-term
transactions made during the fourth quarter of calendar year 1998 under
Virginia Power's market rate sales tariff, FERC Electric Power Sales
Tariff, First Revised Volume No. 4.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
12. Bridgeport Energy, L.L.C.
[Docket No. ER99-1544-000]
Take notice that on January 29, 1999, Bridgeport Energy, L.L.C.
(Bridgeport Energy) tendered for filing a quarterly report of short-
term transactions made during the most recent quarter of calendar year
1998 under Bridgeport Energy's market-based rate tariff, approved by
the Commission in Bridgeport Energy, L.L.C., 83 FERC para. 61,307
(1998).
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
13. State Line Energy, L.L.C.
[Docket No. ER99-1545-000]
Take notice that on January 29, 1999, State Line Energy, L.L.C.
(State Line) submitted its quarterly report regarding transactions to
which it was a party during the period October 1, 1998 through December
31, 1998, pursuant to its Market Rate Schedule accepted by the
Commission in Docket No. ER96-2869-000.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
14. WKE Station Two Inc.
[Docket No. ER99-1546-000]
Take notice that on January 29, 1999, WKE Station Two Inc. tendered
for
[[Page 7183]]
filing its summary of activity for the quarter ending December 31,
1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
15. Boralex Stratton Energy, Inc.
[Docket No. ER99-1547-000]
Take notice that on January 29, 1999, Boralex Stratton Energy, Inc.
tendered for filing its Transaction Report for quarter ending December
31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
16. Duquesne Light Company
[Docket No. ER99-1548-000]
Take notice that on January 29, 1999, Duquesne Light Company
(Duquesne) tendered for filing a report of short-term transactions that
occurred during the period ending December 31, 1998 under Duquesne's
FERC Electric Tariff, Original Volume No. 3.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
17. Western Kentucky Energy Corp.
[Docket No. ER99-1549-000]
Take notice that on January 29, 1999, Western Kentucky Energy Corp.
tendered for filing its summary of activity for the quarter ending
December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
18. AG Energy, L.P.; Seneca Power Partners, L.P.; Sterling Power
Partners, L.P.; Power City Partners, L.P.
[Docket Nos. ER99-1551-000; ER99-1552-000; ER99-1553-000 and ER99-1554-
000]
Take notice that on January 27, 1999, AG-Energy, L.P., Seneca Power
Partners, L.P., Sterling Power Partners, L.P. and Power City Partners,
L.P. tendered for filing a report of no transactions under their
market-based rate tariffs during the fourth quarter of 1998, pursuant
to the Commission's letter order in Docket No. ER98-2782-000, issued
June 17, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
19. New England Power Pool
[Docket No. ER99-1556-000]
Take notice that on January 29, 1999, the New England Power Pool
(NEPOOL) Executive Committee tendered for filing the Forty-First
Agreement Amending New England Power Pool Agreement, amending
provisions relating to the pricing of 10-Minute Spinning Reserve
service and the determination of Installed Capability Responsibilities.
The NEPOOL Executive Committee states that the changes are to comply
with the Commission's December 17th Order in Docket No. OA97-237-000 et
al., and to make the Installed Capability provisions of the Restated
NEPOOL Agreement consistent with market rules recently filed in
compliance with that order.
The NEPOOL Executive Committee also states that copies of these
materials were sent to the participants in the New England Power Pool,
and to the New England state governors and regulatory commissions.
The NEPOOL Executive Committee requests that the Forty-First
Agreement be made effective as of April 1, 1999.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
20. Oklahoma Gas and Electric Company
[Docket No. ER99-1557-000]
Take notice that on January 29, 1999, Oklahoma Gas and Electric
Company (OG&E), tendered for filing a change to its FERC Electric
Tariff, Second Revised Volume No. 2. OG&E states that the change is to
deny Long-Term Firm Transmission Service under OG&E's transmission
tariff when such service is available through the Southwest Power Pool,
Inc., regional transmission service tariff.
OG&E requests an effective date for the tariff change of April 1,
1999.
Copies of this filing have been served on each of the affected
parties, the Oklahoma Corporation Commission and the Arkansas Public
Service Commission.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
21. Southern Energy Kendall, L.L.C.
[Docket No. ER99-1558-000]
Take notice that on January 29, 1999, Southern Energy Kendall,
L.L.C. (Southern Kendall), tendered for filing the following agreement
as a service agreement under its Market Rate Tariff accepted by the
Commission in the Docket No. ER98-4116-000, Master Electric Power
Purchase and Sale Agreement by and between Southern Energy New England,
L.L.C., and Southern Energy Kendall, L.L.C.
Southern Kendall respectfully requests waiver of the 60-day prior
notice requirement to allow the service agreement to become effective
as of December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
22. Central and South West Services, Inc.
[Docket No. ER99-1562-000]
Take notice that on January 29, 1999, Central and South West
Services, Inc., as agent for Central Power and Light Company, West
Texas Utilities Company, Public Service Company of Oklahoma, and
Southwestern Electric Power Company (collectively, the CSW Operating
Companies) submitted a quarterly report under the CSW Operating
Companies' market-based sales tariff. The report is for the period
October 1, 1998 through December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
23. CSW Power Marketing, Inc.
[Docket No. ER99-1563-000]
Take notice that on January 29, 1999, CSW Power Marketing, Inc.
(CSW Power) submitted a quarterly report under CSW Power's market-based
sales tariff. The report is for the period October 1, 1998 through
December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
24. PP&L, Inc.
[Docket No. ER99-1564-000]
Take notice that on January 29, 1999, PP&L, Inc. filed a summary of
activity conducted under its market-based rates tariff, FERC Electric
Tariff, Revised Volume No. 5, during the quarter ending December 31,
1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
25. Duke Power, a Division of Duke Energy Corporation
[Docket No. ER99-1565-000]
Take notice that on January 29, 1999, Duke Power (Duke), a division
of Duke Energy Corporation, tendered for filing quarterly transaction
summaries for service under Duke's Rate Schedule MR, FERC Electric
Tariff First Revised Volume No. 3, for the quarter ending December 31,
1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
26. Louisville Gas and Electric
[Docket No. ER99-1570-000]
Take notice that on January 29, 1999, Louisville Gas and Electric
Company (LG&E) tendered for filing its report of wholesale transactions
made pursuant to its market-based Generation Sales Service (GSS) Tariff
that occurred
[[Page 7184]]
during the quarter ending December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
27. Southern Company Services, Inc.
[Docket No. ER99-1588-000]
Take notice that on January 29, 1999, Southern Company Services,
Inc., acting on behalf of Alabama Power Company, Georgia Power Company,
Gulf Power Company, Mississippi Power Company and Savannah Electric and
Power Company (collectively referred to as Southern Companies),
submitted a quarterly report of short-term transactions that occurred
under the Market-Based Rate Power Sales Tariff (FERC Electric Tariff,
Original Volume No. 4) during the period October 1, 1998 through
December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
28. Oeste Power Generation L.L.C.
[Docket No. ER99-1589-000]
Take notice that, on January 29, 1999, Oeste Power Generation,
L.L.C. submitted a report of transactions that occurred under its
Market-Based Power Sales Tariffs during the quarter ending December 31,
1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
29. Ormond Beach Generation, L.L.C.
[Docket No. ER99-1590-000]
Take notice that, on January 29, 1999, Ormond Beach Generation,
L.L.C. submitted a report of transactions that occurred under its
Market-Based Power Sales Tariffs during the quarter ending December 31,
1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
30. Public Service Electric and Gas Company
[Docket No. ER99-1591-000]
Take notice that on January 29, 1999, Public Service Electric and
Gas Company (PSE&G) filed a summary of transactions made during the
fourth quarter of calendar year 1998 under PSE&G's Market Based Rate
Tariff, Original Volume No. 6, accepted by the Commission in Docket No.
ER97-837-000.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
31. New England Power Company; AllEnergy Marketing Company, L.L.C.
[Docket No. ER99-1592-000]
Take notice that on January 29, 1999, New England Power Company and
AllEnergy Marketing Company, L.L.C. tendered for filing a Quarterly
Report of Transactions for the period ending December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
32. Dayton Power and Light Company
[Docket No. ER99-1593-000]
Take notice that on January 29, 1999, Dayton Power and Light
Company (Dayton) tendered for filing a summary of its Fourth Quarter
market based sales.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
33. Northeast Utilities Service Company
[Docket No. ER99-1594-000]
Take notice that on January 29, 1999, Northeast Utilities Service
Company tendered for filing its quarterly market-based rate summary for
the quarter ending December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
34. Oklahoma Gas and Electric Co.
[Docket No. ER99-1595-000]
Take notice that on January 29, 1999, Oklahoma Gas and Electric Co.
tendered for filing its transaction report for quarter ending December
31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
35. Alta Power Generation, L.L.C.
[Docket No. ER99-1596-000]
Take notice that, on January 29, 1999, Alta Power Generation,
L.L.C. submitted a report of transactions that occurred under its
Market-Based Power Sales Tariffs during the quarter ending December 31,
1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
36. Sierra Pacific Power Company
[Docket No. ER99-1597-000]
Take notice that on January 29, 1999, Sierra Pacific Power Company
(Sierra), tendered for filing Service Agreements (Service Agreements)
with Enron Power Marketing, Inc., for Short-Term Firm Point-to-Point
Transmission Service under Sierra's Open Access Transmission Tariff
(Tariff), Sierra filed the executed Service Agreement with the
Commission in compliance with Sections 13.4 of the Tariff and
applicable Commission regulations. Sierra also submitted a revised
Sheet Nos. 148 and 148A (Attachment E) to the Tariff, which is an
updated list of all current subscribers.
Sierra requests waiver of the Commission's notice requirements to
permit and effective date of February 1, 1999, for Attachment E, and to
allow the Service Agreement to become effective according to its terms.
Copies of this filing were served upon the Public Utilities
Commission of Nevada, the Public Utilities Commission of California and
all interested parties.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
37. Virginia Electric and Power Company
[Docket No. ER99-1599-000]
Take notice that on January 29, 1999, Virginia Electric and Power
Company (Virginia Power), tendered for filing five (5) Service
Agreements for Long Term Firm Point-to-Point Transmission Service with
Virginia Power's Wholesale Power Group (Transmission Customer) under
the Open Access Transmission Tariff to Eligible Purchasers dated July
14, 1997. The tendered Service Agreements are:
(1) OASIS, #64224, dated January 1, 1999 to December 31, 1999,
effective date January 1, 1999;
(2) OASIS, #64225, dated January 1, 1999 to December 31, 1999,
effective date January 1, 1999;
(3) OASIS, #69744, dated June 1, 1999 to September 30, 2000, effective
date June 1, 1999;
(4) OASIS, #69745, dated June 1, 1999 to September 30, 2000, effective
date June 1, 1999; and,
(5) OASIS, #69746, dated June 1, 1999 to September 30, 2000, effective
date June 1, 1999.
Under the tendered Service Agreements, Virginia Power will provide
Long Term Firm Point-to-Point Transmission Service to the Transmission
Customer under the rates, terms and conditions of the Open Access
Transmission Tariff.
The Company requests an effective date of January 1, 1999 for
Service Agreements One (1) and Two (2) listed above, and June 1, 1999
for Service Agreements Three (3), Four (4) and Five (5) listed above.
Copies of the filing were served upon the Transmission Customer,
the Virginia State Corporation Commission and the North Carolina
Utilities Commission.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 7185]]
38. Illinois Power Company
[Docket No. ER99-1600-000]
Take notice that on January 29, 1999, Illinois Power Company
(Illinois Power), 500 South 27th Street, Decatur, Illinois 62526,
tendered for filing Long-Term Firm Transmission Service Agreements
under which Illinois Power Bulk Power Marketing will take transmission
service pursuant to its open access transmission tariff. The agreements
are based on the Form of Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of January 1, 1999.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
39. Southern Energy Canal, L.L.C.
[Docket No. ER99-1601-000]
Take notice that on January 29, 1999, Southern Energy Canal, L.L.C.
(Southern Canal), tendered for filing the following agreement as a
service agreement under its Market Rate Tariff accepted by the
Commission in the Docket No. ER98-4115-000:
1. Master Electric Power Purchase and Sale Agreement by and between
Southern Energy New England, L.L.C. and Southern Energy Canal, L.L.C.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
40. Boston Edison Company
[Docket No. ER99-1602-000]
Take notice that January 29, 1999, Boston Edison Company (Edison)
of Boston, Massachusetts, tendered for filing a substitute Page 10 to
its Third Amendment to the Pilgrim Power Sale Agreement between Edison
and Montaup Electric Company (FERC Rate Schedule No. 69). According to
Edison the substitute Page 10 is to correct an error and thereby
clarify that certain costs were therein referenced for purposes of
illustration rather than limitation. The Third Amendment was originally
filed in Docket No. ER99-1023-000, which has been consolidated with
Docket Nos. EC99-18-000 and EL99-22-000.
Edison has asked that the corrected Page 10 be made effective on
the same date as the Third Amendment.
Edison states that it has served the change on all parties to the
official service list in Docket Nos. EC99-18-000, ER99-1023-000, and
EL99-22-000, Montaup Electric Company, and the Massachusetts Department
of Telecommunications and Energy.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
41. Northeast Utilities Service Company
[Docket No. ER99-1603-000]
Take notice that on January 29, 1999, Northeast Utilities Service
Company (NUSCO), on behalf of The Connecticut Light and Power Company,
and Public Service Company of New Hampshire, tendered for filing
pursuant to Section 205 of the Federal Power Act and Section 35.13 of
the Commission's Regulations, a rate schedule change for sales of
electric energy to Littleton Electric Light Department (Littleton).
NUSCO states that a copy of this filing has been mailed to
Littleton.
NUSCO requests that the rate schedule change become effective on
April 1, 1999.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
42. PJM Interconnection, L.L.C.
[Docket No. ER99-1604-000]
Take notice that on January 29, 1999, PJM Interconnection, L.L.C.
(PJM), tendered for filing one executed service agreement with PECO
Energy Company for Network Integration Transmission Service.
Copies of this filing were served upon PECO Energy Company.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
43. Commonwealth Edison Company
[Docket No. ER99-1605-000]
Take notice that on January 29, 1999, Commonwealth Edison Company
(ComEd), tendered for filing a revised Firm Service Agreement with
Alliant Bulk Power (Alliant), under the terms of ComEd's Open Access
Transmission Tariff (OATT).
ComEd requests an effective date of January 1, 1999, for the
revised service agreement, and accordingly, seeks waiver of the
Commission's notice requirements.
Copies of this filing were served on Alliant.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
44. PP&L, Inc.
[Docket No. ER99-1606-000]
Take notice that on January 29, 1999, PP&L, Inc., tendered for
filing a Power Supply Agreement, dated January 25, 1999, with Allegheny
Electric Cooperative, Inc., of Lehigh County, Pennsylvania (AEC) under
PP&L's FERC Electric Tariff Revised Volume No. 5 and an amendment and
addendum to a Power Supply Agreement dated May 4, 1994 between PP&L and
AEC.
PP&L requests an effective date of February 1, 1999, for the Power
Supply Agreement dated January 25, 1999. PP&L requests an effective
date of April 1, 1998, for the amendment and addendum to the Power
Supply Agreement dated May 4, 1994.
PP&L states that copies of this filing have been supplied to AEC
and to the Pennsylvania Public Utility Commission.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
45. PP&L, Inc.
[Docket No. ER99-1607-000]
Take Notice that on January 29, 1999, PP&L, Inc., tendered for
filing a Power Supply Agreement, dated January 25, 1999, with Allegheny
Electric Cooperative, Inc., of Lehigh County, Pennsylvania (AEC) under
PP&L's FERC Electric Tariff Revised Volume No. 5, and an amendment and
addendum to a Power Supply Agreement dated February 13, 1995 between
PP&L and AEC.
PP&L requests an effective date of February 1, 1999, for the Power
Supply Agreement dated January 25, 1999. PP&L requests an effective
date of April 1, 1998, for the amendment and addendum to the Power
Supply Agreement dated February 13, 1995.
PP&L states that copies of this filing have been supplied to AEC
and to the Pennsylvania Public Utility Commission.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
46. PJM Interconnection, L.L.C.
[Docket No. ER99-1608-000]
Take notice that on January 29, 1999, PJM Interconnection, L.L.C.
(PJM), tendered for filing five signature pages of parties to the
Reliability Assurance Agreement among Load Serving Entities in the PJM
Control Area (RAA), and an amended Schedule 17, listing the parties to
the RAA.
PJM states that it served a copy of its filing on all parties to
the RAA, including each of the parties for which a signature page is
being tendered with this filing, and each of the state electric
regulatory commissions within the PJM Control Area.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 7186]]
47. New England Power Pool
[Docket No. ER99-1609-000]
Take notice that on January 29, 1999, the New England Power Pool
(NEPOOL) Executive Committee tendered for filing new Market Rules and
Procedures not previously submitted to the Commission. The NEPOOL
Executive Committee has requested that the new Market Rules apply for
all NEPOOL market transactions occurring after the Second Effective
Date, which the Committee indicates is now projected to occur April 1,
1999.
The NEPOOL Executive Committee states that copies of these
materials were sent to the New England state governors and regulatory
commissions and the Participants in the New England Power Pool.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
48. New Century Services, Inc.
[Docket No. ER99-1610-000]
Take notice that on January 29, 1999, New Century Services, Inc., a
service company affiliate of Public Service Company of Colorado (PSCo),
Southwestern Public Service Company (SPS), and e prime, inc. (e prime),
has filed on their behalf the following: PSCo's Market-Based Wholesale
Power Sales Tariff; SPS's Market-Based Wholesale Power Sales Tariff
(SPS Tariff); a revised and restated version of the previously approved
e prime FERC Electric Rate Schedule No. 1; and a Statement of Policy
and Code of Conduct with Respect to the Relationship between the NCE
Operating Companies (PSCo and SPS, together with Cheyenne Light, Fuel
and Power Company) and their Wholesale Marketing Affiliates, including
e prime. NCS states that the SPS Tariff is not intended to supersede
SPS's existing market-based sales tariff.
NCS requests that the Commission make these filings effective on
January 30, 1999.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
49. The Cincinnati Gas & Electric Company; PSI Energy, Inc.
[Docket No. ER99-1611-000]
Take notice that on January 29, 1999, The Cincinnati Gas & Electric
Company and PSI Energy, Inc. (Cinergy Operating Companies) tendered for
filing their quarterly transaction report for the calendar quarter
ending December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
50. Great Bay Power Corporation
[Docket No. ER99-1612-000]
Take notice that on January 29, 1999, Great Bay Power Corporation
(Great Bay), tendered for filing a service agreement between PP&L
EnergyPlus Co., and Great Bay for service under Great Bay's revised
Tariff for Short Term Sales. This Tariff was accepted for filing by the
Commission on July 24, 1998, in Docket No. ER98-3470-000.
The service agreement is proposed to be effective January 27, 1999.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
51. Great Bay Power Corporation
[Docket No. ER99-1613-000]
Take notice that on January 29, 1999, Great Bay Power Corporation
(Great Bay), tendered for filing a service agreement between Duke
Energy Trading and Marketing, L.L.C., and Great Bay for service under
Great Bay's revised Tariff for Short Term Sales. This Tariff was
accepted for filing by the Commission on July 24, 1998, in Docket No.
ER98-3470-000.
The service agreement is proposed to be effective January 22, 1999.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
52. New England Power Pool
[Docket No. ER99-1614-000]
Take notice that on January 29, 1999, the New England Power Pool
Executive Committee filed for acceptance a signature page to the New
England Power Pool (NEPOOL) Agreement dated September 1, 1971, as
amended, signed by Horizon Energy Corporation d/b/a Exelon Energy
(Exelon Energy). The NEPOOL Agreement has been designated NEPOOL FPC
No. 2.
The Executive Committee states that the Commission's acceptance of
Exelon Energy's signature page would permit NEPOOL to expand its
membership to include Exelon Energy. NEPOOL further states that the
filed signature page does not change the NEPOOL Agreement in any
manner, other than to make Exelon Energy a member in NEPOOL.
NEPOOL requests an effective date of January 1, 1999, for
commencement of participation in NEPOOL by Exelon Energy.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
53. New England Power Pool
[Docket No. ER99-1615-000]
Take notice that on January 29, 1999, the New England Power Pool
(NEPOOL or Pool) Executive Committee tendered for filing a request for
termination of memberships in NEPOOL, with an effective date of
February 1, 1999, of CWS Energy Service, Inc. (CWS ESI). Such
termination is pursuant to the terms of the NEPOOL Agreement dated
September 1, 1971, as amended, and previously signed by CWS ESI. The
New England Power Pool Agreement, as amended (the NEPOOL Agreement),
has been designated NEPOOL FPC No. 2.
The Executive Committee states that termination of CWS ESI with an
effective date of February 1, 1999, would relieve this entity, at CWS
ESI's request, of the obligations and responsibilities of Pool
membership and would not change the NEPOOL Agreement in any manner,
other than to remove CWS ESI from membership in the Pool.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
54. Idaho Power Company
[Docket No. ER99-1616-000]
Take notice that on January 29, 1999, Idaho Power Company (IPC),
tendered for filing a Service Agreement under Idaho Power Company
Tariff Volume No. 6, Market Rate Power Sales, between Idaho Power
Company and Tillamook People's Utility District.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
55. Automated Power Exchange, Inc.
[Docket No. ER99-1617-000]
Take notice that on January 29, 1999, Automated Power Exchange,
Inc. (APX) filed its quarterly informational report. APX requested
confidential treatment of the filing. The report is for the period
October 1, 1998 through December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
56. Atlantic City Electric Company
[Docket No. ER99-1618-000]
Take notice that on January 29, 1999, Atlantic City Electric
Company (Atlantic), tendered a filing modifications the Atlantic zonal
transmission rate for network and point-to-point service under the PJM
open access tariff. Atlantic's existing zonal rates do not include the
costs of its 69 kV facilities. Atlantic's filing includes the costs of
its 69 kV facilities in its
[[Page 7187]]
zonal rates because these facilities function as part of Atlantic's
integrated transmission system.
Atlantic requests that the Commission allow the modifications to
take effect on April 1, 1999.
Atlantic states that copies of this filing have been served upon
the customer and affected state commissions.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
57. PJM Interconnection, L.L.C.
[Docket No. ER99-1619-000]
Take notice that on January 29, 1999, PJM Interconnection, L.L.C.
(PJM), tendered for filing 64 executed service agreements network
integration transmission service under state required retail access
programs and for point-to-point transmission service under the PJM Open
Access Transmission Tariff.
Copies of this filing were served upon the parties to the service
agreements.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
58. Public Service Electric and Gas Company
[Docket No. ER99-1620-000]
Take notice that on January 29, 1999, Public Service Electric and
Gas Company (PSE&G) of Newark, New Jersey tendered for filing an
agreement for the sale of capacity and energy to Entergy Power
Marketing Corp. (Entergy), pursuant to the PSE&G Wholesale Power Market
Based Sales Tariff, presently on file with the Commission.
PSE&G further requests waiver of the Commission's Regulations such
that the agreement can be made effective as of December 29, 1998.
Copies of the filing have been served upon Entergy and the New
Jersey Board of Public Utilities.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
59. California Independent System Operator Corporation
[Docket No. ER99-1621-000]
Take notice that on January 29, 1999, the California Independent
System Operator Corporation (ISO), tendered for filing a Meter Service
Agreement for scheduling Coordinators between the ISO and Pacificorp
Power Marketing, Inc., for acceptance by the Commission.
The ISO states that this filing has been served on Pacificorp Power
Marketing, Inc., and the California Public Utilities Commission.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
60. Williams Generation Company--Hazelton
[Docket No. ER99-1622-000]
Take notice that on January 29, 1999, Williams Generation Company--
Hazelton tendered for filing its Power Marketer Reports for the fourth
quarter of 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
61. Montaup Electric Company
[Docket No. ER99-1625-000]
Take notice that on January 29, 1999, Montaup Electric Company
tendered for filing its Quarterly Report of transactions for the
calendar quarter ending December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
62. Kentucky Utilities Company
[Docket No. ER99-1626-000]
Take notice that on January 29, 1999, Kentucky Utilities Company
(KU) tendered for filing a report of transactions for the quarter
ending December 31, 1998.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
63. California Independent System Operator Corporation
[Docket No. ER99-1655-000]
Take notice that on January 29, 1999, the California Independent
System Operator Corporation (ISO), tendered for filing a Scheduling
Coordinator Agreement between the ISO and Pacificorp Power Marketing,
Inc., for acceptance by the Commission.
The ISO states that this filing has been served on Pacificorp Power
Marketing, Inc., and the California Public Utilities Commission.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
64. Western Resources, Inc.
[Docket No. ES99-23-000]
Take notice that on January 22, 1999, Western Resources Inc.
(Western Resources), tendered for filing an application under Section
204(a) of the Federal Power Act for authorization to issue and sell,
from time to time up to 1,950,000 additional common stock of Western
Resources, $5.00 par value (Additional Shares) under its Employee Stock
Purchase Plan. Western Resources further requests an exemption from the
Commission's competitive bidding and negotiated placement requirements.
Comment date: February 25, 1999, in accordance with Standard
Paragraph E at the end of this notice.
65. Colorado Springs Utilities; East Kentucky Power Cooperative,
Inc.; New York Power Authority; Omaha Public Power District
[Docket Nos. NJ97-9-004; NJ97-14-002; NJ97-10-002; and NJ97-2-004]
Take notice that between December 23-28, 1998, the above-named
utilities filed revised standards of conduct in response to the
Commission's November 25, 1998 Order on Standards of Conduct. 85 FERC
para. 61,286 (1998).
Comment date: February 19, 1999, in accordance with Standard
Paragraph E at the end of this notice.
66. Virginia Electric and Power Company
[Docket No. OA96-52-005]
Take notice that on January 19, 1999, Virginia Electric and Power
Company tendered for filing its refund compliance report in accordance
with Section 35.19a of the Commission's regulations. This compliance
report is being filed pursuant to the Commission's letter order issued
June 11, 1997 in the above-captioned docket.
Comment date: March 8, 1999, in accordance with Standard Paragraph
E at the end of this notice.
67. SBR Associates and Ogden Haverhill Associates
[Docket No. QF82-190-001]
Take notice that on January 29, 1999, SBR Associates and Ogden
Haverhill Associates filed an application requesting the
recertification of the qualifying status of a cogeneration and small
power production facility and, in the alternative, a request for
waiver. Included as part of the Application is a FERC Form 556.
A copy of this filing has been served on the Massachusetts
Department of Telecommunications and Energy and on the Massachusetts
Electric Company.
Comment date: February 18, 1999, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions
[[Page 7188]]
or protests should be filed on or before the comment date. Protests
will be considered by the Commission in determining the appropriate
action to be taken, but will not serve to make protestants parties to
the proceeding. Any person wishing to become a party must file a motion
to intervene. Copies of these filings are on file with the Commission
and are available for public inspection.
David P. Boergers,
Secretary.
[FR Doc. 99-3453 Filed 2-11-99; 8:45 am]
BILLING CODE 6717-01-P