99-3453. Southwestern Power Administration, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 64, Number 29 (Friday, February 12, 1999)]
    [Notices]
    [Pages 7181-7188]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-3453]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EF99-4011-000, et al.]
    
    
    Southwestern Power Administration, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    February 4, 1999.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Southwestern Power Administration
    
    [Docket No. EF99-4011-000]
    
        Take notice that on January 29, 1999, the Deputy Secretary, U.S. 
    Department of Energy, submitted to the Federal Energy Regulatory 
    Commission (FERC) for confirmation and approval on a final basis, 
    pursuant to the authority vested in the FERC by Delegation Order No. 
    0204-108, as amended November 10, 1993, 58 FR 59717, the following 
    Southwestern Power Administration (Southwestern) Integrated System rate 
    schedules:
    
    Rate Schedule P-98B, Wholesale Rates for Hydro Peaking Power
    Rate Schedule NFTS-98B, Wholesale Non-Federal Transmission Service
    
        The Integrated System rate schedules were confirmed and approved on 
    an interim basis by the Deputy Secretary in Rate Order No. SWPA-39 for 
    the period January 1, 1999, through September 30, 2001, and have been 
    submitted to the FERC for confirmation and approval on a final basis 
    for the same period. The FY 1998 Power Repayment Study has confirmed 
    that rates prescribed by currently-approved Rate Schedules P-98A, 
    Wholesale Rates for Hydro Peaking Power, and NFTS-98, Wholesale Rates 
    for Non-Federal Transmission Service, are sufficient to meet repayment 
    criteria and do not require any adjustment. However, certain aspects of 
    the terms and conditions set forth in the rate schedules need to be 
    revised to clarify and accommodate market conditions experienced during 
    this past year.
        The names of the rate schedules have been changed from P-98A and 
    NFTS-98 to P-98B and NFTS-98B to reflect the fact that revisions have 
    been made. Minor corrections and modifications were made throughout the 
    rate schedules for clarification purposes. The basis for determining 
    the rate for Real Power Losses has been revised in both rate schedules. 
    This change is required since the Energy Information Administration no 
    longer compiles the information which was the basis for determining the 
    rate for losses. In addition, the Capacity Overrun Penalty provisions 
    have been revised to provide a greater incentive to not overrun 
    Southwestern's Integrated System capacity. The penalty set forth in the 
    current rate schedules was insufficient to serve as a deterrent in 
    light of this past summer's price escalation. These changes will have 
    no impact on the amortization or status of repayment forecasted in the 
    power repayment studies and will not require rate changes. Revenues 
    based on current rates remain sufficient to meet repayment criteria.
        Comment date: February 25, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 7182]]
    
    2. PSEG PPN Energy Company Ltd.
    
    [Docket No. EG99-41-000]
    
        Take notice that on January 29, 1999, PSEG PPN Energy Company Ltd. 
    (PSEG PPN), with its principal office at 608 St. James Court, St. Denis 
    Street, Port Louis, Mauritius filed with the Federal Energy Regulatory 
    Commission an amended application for determination of exempt wholesale 
    generator status pursuant to Part 365 of the Commission's regulations.
        PSEG PPN is a company organized under the laws of Mauritius. PSEG 
    PPN will be engaged, directly or indirectly through an affiliate as 
    defined in Section 2(a)(11)(B) of the Public Utility Holding Company 
    Act of 1935, exclusively in owning, or both owning and operating a gas 
    and/or naphtha-fired combined cycle generating facility consisting of 
    one electric generating unit with a nameplate rating of approximately 
    347 megawatts and incidental facilities located in Tamil Nadu, India; 
    selling electric energy at wholesale and engaging in project 
    development activities with respect thereto. PSEG PPN amended its 
    original application to indicate that it has no current plans of 
    engaging in fuel delivery or brokering activities.
        Comment date: February 25, 1999, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the amended application.
    
    3. Western Power Trading Forum Complainant, v. California 
    Independent System Operator Corporation Respondent
    
    [Docket No. EL99-30-000]
    
        Take notice that on January 20, 1999, the Western Power Trading 
    Forum (Complainant) filed a complaint and request for expedited relief 
    under Sections 206 and 306, et seq., of the Federal Power Act, 16 
    U.S.C. Secs. 824e and 825e (1994), and Section 206 of the Commission's 
    Rules of practice and procedure, 18 CFR 385.206, alleging that the Grid 
    Management Charge of the California Independent System Operator 
    Corporation (ISO) is unjust, unreasonable, unduly discriminatory, 
    anticompetitive, excessive, and in violation of a prior ISO settlement 
    approved in Docket Nos. ER98-211-000, et al. 
        Comment date: March 5, 1999, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    4. Ocean Vista Power Generation, L.L.C.
    
    [Docket No. ER99-1536-000]
    
        Take notice that, on January 29, 1999, Ocean Vista Power 
    Generation, L.L.C. submitted a report of transactions that occurred 
    under its Market-Based Power Sales Tariffs during the quarter ending 
    December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Mountain Vista Power Generation, L.L.C.
    
    [Docket No. ER99-1537-000]
    
        Take notice that, on January 29, 1999, Mountain Vista Power 
    Generation, L.L.C. submitted a report of transactions that occurred 
    under its Market-Based Power Sales Tariffs during the quarter ending 
    December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Energy Services, Inc.
    
    [Docket No. ER99-1538-000]
    
        Take notice that on January 29, 1999, Energy Services, Inc. 
    tendered for filing its report of transactions for the quarter ending 
    December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Duke Energy Marketing Corp.
    
    [Docket No. ER99-1539-000]
    
        Take notice that on January 29, 1999, Duke Energy Marketing Corp. 
    (DEMC) tendered for filing its report of transactions for the quarter 
    ending December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Southwestern Public Service Company
    
    [Docket No. ER99-1540-000]
    
        Take notice that on January 29, 1999, New Century Services, Inc., 
    on behalf of Southwestern Public Service Company (Southwestern), 
    submitted a Quarterly Report under Southwestern's market-based sales 
    tariff. The report is for the period of October 1, 1999 through 
    December 31, 1999.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Consumers Energy Company
    
    [Docket No. ER99-1541-000]
    
        Take notice that on January 29, 1999, Consumers Energy Company 
    filed a report that it made no market based sales under its wholesale 
    power sales tariff for the quarter ending December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. The Detroit Edison Company
    
    [Docket No. ER99-1542-000]
    
        Take notice that on January 29, 1999, The Detroit Edison Company 
    filed a summary of market based sales under its market-based rate 
    wholesale power sales tariff for the calendar quarter ending December 
    31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Virginia Electric and Power Company
    
    [Docket No. ER99-1543-000 ]
    
        Take notice that on January 29, 1999, Virginia Electric and Power 
    Company (Virginia Power) tendered for filing a summary of short-term 
    transactions made during the fourth quarter of calendar year 1998 under 
    Virginia Power's market rate sales tariff, FERC Electric Power Sales 
    Tariff, First Revised Volume No. 4.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Bridgeport Energy, L.L.C.
    
    [Docket No. ER99-1544-000]
    
        Take notice that on January 29, 1999, Bridgeport Energy, L.L.C. 
    (Bridgeport Energy) tendered for filing a quarterly report of short-
    term transactions made during the most recent quarter of calendar year 
    1998 under Bridgeport Energy's market-based rate tariff, approved by 
    the Commission in Bridgeport Energy, L.L.C., 83 FERC para. 61,307 
    (1998).
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. State Line Energy, L.L.C.
    
    [Docket No. ER99-1545-000]
    
        Take notice that on January 29, 1999, State Line Energy, L.L.C. 
    (State Line) submitted its quarterly report regarding transactions to 
    which it was a party during the period October 1, 1998 through December 
    31, 1998, pursuant to its Market Rate Schedule accepted by the 
    Commission in Docket No. ER96-2869-000.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. WKE Station Two Inc.
    
    [Docket No. ER99-1546-000]
    
        Take notice that on January 29, 1999, WKE Station Two Inc. tendered 
    for
    
    [[Page 7183]]
    
    filing its summary of activity for the quarter ending December 31, 
    1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Boralex Stratton Energy, Inc.
    
    [Docket No. ER99-1547-000]
    
        Take notice that on January 29, 1999, Boralex Stratton Energy, Inc. 
    tendered for filing its Transaction Report for quarter ending December 
    31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. Duquesne Light Company
    
    [Docket No. ER99-1548-000]
    
        Take notice that on January 29, 1999, Duquesne Light Company 
    (Duquesne) tendered for filing a report of short-term transactions that 
    occurred during the period ending December 31, 1998 under Duquesne's 
    FERC Electric Tariff, Original Volume No. 3.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Western Kentucky Energy Corp.
    
    [Docket No. ER99-1549-000]
    
        Take notice that on January 29, 1999, Western Kentucky Energy Corp. 
    tendered for filing its summary of activity for the quarter ending 
    December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. AG Energy, L.P.; Seneca Power Partners, L.P.; Sterling Power 
    Partners, L.P.; Power City Partners, L.P.
    
    [Docket Nos. ER99-1551-000; ER99-1552-000; ER99-1553-000 and ER99-1554-
    000]
    
        Take notice that on January 27, 1999, AG-Energy, L.P., Seneca Power 
    Partners, L.P., Sterling Power Partners, L.P. and Power City Partners, 
    L.P. tendered for filing a report of no transactions under their 
    market-based rate tariffs during the fourth quarter of 1998, pursuant 
    to the Commission's letter order in Docket No. ER98-2782-000, issued 
    June 17, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. New England Power Pool
    
    [Docket No. ER99-1556-000]
    
        Take notice that on January 29, 1999, the New England Power Pool 
    (NEPOOL) Executive Committee tendered for filing the Forty-First 
    Agreement Amending New England Power Pool Agreement, amending 
    provisions relating to the pricing of 10-Minute Spinning Reserve 
    service and the determination of Installed Capability Responsibilities. 
    The NEPOOL Executive Committee states that the changes are to comply 
    with the Commission's December 17th Order in Docket No. OA97-237-000 et 
    al., and to make the Installed Capability provisions of the Restated 
    NEPOOL Agreement consistent with market rules recently filed in 
    compliance with that order.
        The NEPOOL Executive Committee also states that copies of these 
    materials were sent to the participants in the New England Power Pool, 
    and to the New England state governors and regulatory commissions.
        The NEPOOL Executive Committee requests that the Forty-First 
    Agreement be made effective as of April 1, 1999.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. Oklahoma Gas and Electric Company
    
    [Docket No. ER99-1557-000]
    
        Take notice that on January 29, 1999, Oklahoma Gas and Electric 
    Company (OG&E), tendered for filing a change to its FERC Electric 
    Tariff, Second Revised Volume No. 2. OG&E states that the change is to 
    deny Long-Term Firm Transmission Service under OG&E's transmission 
    tariff when such service is available through the Southwest Power Pool, 
    Inc., regional transmission service tariff.
        OG&E requests an effective date for the tariff change of April 1, 
    1999.
        Copies of this filing have been served on each of the affected 
    parties, the Oklahoma Corporation Commission and the Arkansas Public 
    Service Commission.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. Southern Energy Kendall, L.L.C.
    
    [Docket No. ER99-1558-000]
    
        Take notice that on January 29, 1999, Southern Energy Kendall, 
    L.L.C. (Southern Kendall), tendered for filing the following agreement 
    as a service agreement under its Market Rate Tariff accepted by the 
    Commission in the Docket No. ER98-4116-000, Master Electric Power 
    Purchase and Sale Agreement by and between Southern Energy New England, 
    L.L.C., and Southern Energy Kendall, L.L.C.
        Southern Kendall respectfully requests waiver of the 60-day prior 
    notice requirement to allow the service agreement to become effective 
    as of December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Central and South West Services, Inc.
    
    [Docket No. ER99-1562-000]
    
        Take notice that on January 29, 1999, Central and South West 
    Services, Inc., as agent for Central Power and Light Company, West 
    Texas Utilities Company, Public Service Company of Oklahoma, and 
    Southwestern Electric Power Company (collectively, the CSW Operating 
    Companies) submitted a quarterly report under the CSW Operating 
    Companies' market-based sales tariff. The report is for the period 
    October 1, 1998 through December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. CSW Power Marketing, Inc.
    
    [Docket No. ER99-1563-000]
    
        Take notice that on January 29, 1999, CSW Power Marketing, Inc. 
    (CSW Power) submitted a quarterly report under CSW Power's market-based 
    sales tariff. The report is for the period October 1, 1998 through 
    December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. PP&L, Inc.
    
    [Docket No. ER99-1564-000]
    
        Take notice that on January 29, 1999, PP&L, Inc. filed a summary of 
    activity conducted under its market-based rates tariff, FERC Electric 
    Tariff, Revised Volume No. 5, during the quarter ending December 31, 
    1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    25. Duke Power, a Division of Duke Energy Corporation
    
    [Docket No. ER99-1565-000]
    
        Take notice that on January 29, 1999, Duke Power (Duke), a division 
    of Duke Energy Corporation, tendered for filing quarterly transaction 
    summaries for service under Duke's Rate Schedule MR, FERC Electric 
    Tariff First Revised Volume No. 3, for the quarter ending December 31, 
    1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. Louisville Gas and Electric
    
    [Docket No. ER99-1570-000]
    
        Take notice that on January 29, 1999, Louisville Gas and Electric 
    Company (LG&E) tendered for filing its report of wholesale transactions 
    made pursuant to its market-based Generation Sales Service (GSS) Tariff 
    that occurred
    
    [[Page 7184]]
    
    during the quarter ending December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. Southern Company Services, Inc.
    
    [Docket No. ER99-1588-000]
    
        Take notice that on January 29, 1999, Southern Company Services, 
    Inc., acting on behalf of Alabama Power Company, Georgia Power Company, 
    Gulf Power Company, Mississippi Power Company and Savannah Electric and 
    Power Company (collectively referred to as Southern Companies), 
    submitted a quarterly report of short-term transactions that occurred 
    under the Market-Based Rate Power Sales Tariff (FERC Electric Tariff, 
    Original Volume No. 4) during the period October 1, 1998 through 
    December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. Oeste Power Generation L.L.C.
    
    [Docket No. ER99-1589-000]
    
        Take notice that, on January 29, 1999, Oeste Power Generation, 
    L.L.C. submitted a report of transactions that occurred under its 
    Market-Based Power Sales Tariffs during the quarter ending December 31, 
    1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. Ormond Beach Generation, L.L.C.
    
    [Docket No. ER99-1590-000]
    
        Take notice that, on January 29, 1999, Ormond Beach Generation, 
    L.L.C. submitted a report of transactions that occurred under its 
    Market-Based Power Sales Tariffs during the quarter ending December 31, 
    1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    30. Public Service Electric and Gas Company
    
    [Docket No. ER99-1591-000]
    
        Take notice that on January 29, 1999, Public Service Electric and 
    Gas Company (PSE&G) filed a summary of transactions made during the 
    fourth quarter of calendar year 1998 under PSE&G's Market Based Rate 
    Tariff, Original Volume No. 6, accepted by the Commission in Docket No. 
    ER97-837-000.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    31. New England Power Company; AllEnergy Marketing Company, L.L.C.
    
    [Docket No. ER99-1592-000]
    
        Take notice that on January 29, 1999, New England Power Company and 
    AllEnergy Marketing Company, L.L.C. tendered for filing a Quarterly 
    Report of Transactions for the period ending December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    32. Dayton Power and Light Company
    
    [Docket No. ER99-1593-000]
    
        Take notice that on January 29, 1999, Dayton Power and Light 
    Company (Dayton) tendered for filing a summary of its Fourth Quarter 
    market based sales.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    33. Northeast Utilities Service Company
    
    [Docket No. ER99-1594-000]
    
        Take notice that on January 29, 1999, Northeast Utilities Service 
    Company tendered for filing its quarterly market-based rate summary for 
    the quarter ending December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    34. Oklahoma Gas and Electric Co.
    
    [Docket No. ER99-1595-000]
    
        Take notice that on January 29, 1999, Oklahoma Gas and Electric Co. 
    tendered for filing its transaction report for quarter ending December 
    31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    35. Alta Power Generation, L.L.C.
    
    [Docket No. ER99-1596-000]
    
        Take notice that, on January 29, 1999, Alta Power Generation, 
    L.L.C. submitted a report of transactions that occurred under its 
    Market-Based Power Sales Tariffs during the quarter ending December 31, 
    1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    36. Sierra Pacific Power Company
    
    [Docket No. ER99-1597-000]
    
        Take notice that on January 29, 1999, Sierra Pacific Power Company 
    (Sierra), tendered for filing Service Agreements (Service Agreements) 
    with Enron Power Marketing, Inc., for Short-Term Firm Point-to-Point 
    Transmission Service under Sierra's Open Access Transmission Tariff 
    (Tariff), Sierra filed the executed Service Agreement with the 
    Commission in compliance with Sections 13.4 of the Tariff and 
    applicable Commission regulations. Sierra also submitted a revised 
    Sheet Nos. 148 and 148A (Attachment E) to the Tariff, which is an 
    updated list of all current subscribers.
        Sierra requests waiver of the Commission's notice requirements to 
    permit and effective date of February 1, 1999, for Attachment E, and to 
    allow the Service Agreement to become effective according to its terms.
        Copies of this filing were served upon the Public Utilities 
    Commission of Nevada, the Public Utilities Commission of California and 
    all interested parties.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    37. Virginia Electric and Power Company
    
    [Docket No. ER99-1599-000]
    
        Take notice that on January 29, 1999, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing five (5) Service 
    Agreements for Long Term Firm Point-to-Point Transmission Service with 
    Virginia Power's Wholesale Power Group (Transmission Customer) under 
    the Open Access Transmission Tariff to Eligible Purchasers dated July 
    14, 1997. The tendered Service Agreements are:
    
    (1) OASIS, #64224, dated January 1, 1999 to December 31, 1999, 
    effective date January 1, 1999;
    (2) OASIS, #64225, dated January 1, 1999 to December 31, 1999, 
    effective date January 1, 1999;
    (3) OASIS, #69744, dated June 1, 1999 to September 30, 2000, effective 
    date June 1, 1999;
    (4) OASIS, #69745, dated June 1, 1999 to September 30, 2000, effective 
    date June 1, 1999; and,
    (5) OASIS, #69746, dated June 1, 1999 to September 30, 2000, effective 
    date June 1, 1999.
    
        Under the tendered Service Agreements, Virginia Power will provide 
    Long Term Firm Point-to-Point Transmission Service to the Transmission 
    Customer under the rates, terms and conditions of the Open Access 
    Transmission Tariff.
        The Company requests an effective date of January 1, 1999 for 
    Service Agreements One (1) and Two (2) listed above, and June 1, 1999 
    for Service Agreements Three (3), Four (4) and Five (5) listed above.
        Copies of the filing were served upon the Transmission Customer, 
    the Virginia State Corporation Commission and the North Carolina 
    Utilities Commission.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 7185]]
    
    38. Illinois Power Company
    
    [Docket No. ER99-1600-000]
    
        Take notice that on January 29, 1999, Illinois Power Company 
    (Illinois Power), 500 South 27th Street, Decatur, Illinois 62526, 
    tendered for filing Long-Term Firm Transmission Service Agreements 
    under which Illinois Power Bulk Power Marketing will take transmission 
    service pursuant to its open access transmission tariff. The agreements 
    are based on the Form of Service Agreement in Illinois Power's tariff.
        Illinois Power has requested an effective date of January 1, 1999.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    39. Southern Energy Canal, L.L.C.
    
    [Docket No. ER99-1601-000]
    
        Take notice that on January 29, 1999, Southern Energy Canal, L.L.C. 
    (Southern Canal), tendered for filing the following agreement as a 
    service agreement under its Market Rate Tariff accepted by the 
    Commission in the Docket No. ER98-4115-000:
    
    1. Master Electric Power Purchase and Sale Agreement by and between 
    Southern Energy New England, L.L.C. and Southern Energy Canal, L.L.C.
    
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    40. Boston Edison Company
    
    [Docket No. ER99-1602-000]
    
        Take notice that January 29, 1999, Boston Edison Company (Edison) 
    of Boston, Massachusetts, tendered for filing a substitute Page 10 to 
    its Third Amendment to the Pilgrim Power Sale Agreement between Edison 
    and Montaup Electric Company (FERC Rate Schedule No. 69). According to 
    Edison the substitute Page 10 is to correct an error and thereby 
    clarify that certain costs were therein referenced for purposes of 
    illustration rather than limitation. The Third Amendment was originally 
    filed in Docket No. ER99-1023-000, which has been consolidated with 
    Docket Nos. EC99-18-000 and EL99-22-000.
        Edison has asked that the corrected Page 10 be made effective on 
    the same date as the Third Amendment.
        Edison states that it has served the change on all parties to the 
    official service list in Docket Nos. EC99-18-000, ER99-1023-000, and 
    EL99-22-000, Montaup Electric Company, and the Massachusetts Department 
    of Telecommunications and Energy.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    41. Northeast Utilities Service Company
    
    [Docket No. ER99-1603-000]
    
        Take notice that on January 29, 1999, Northeast Utilities Service 
    Company (NUSCO), on behalf of The Connecticut Light and Power Company, 
    and Public Service Company of New Hampshire, tendered for filing 
    pursuant to Section 205 of the Federal Power Act and Section 35.13 of 
    the Commission's Regulations, a rate schedule change for sales of 
    electric energy to Littleton Electric Light Department (Littleton).
        NUSCO states that a copy of this filing has been mailed to 
    Littleton.
        NUSCO requests that the rate schedule change become effective on 
    April 1, 1999.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    42. PJM Interconnection, L.L.C.
    
    [Docket No. ER99-1604-000]
    
        Take notice that on January 29, 1999, PJM Interconnection, L.L.C. 
    (PJM), tendered for filing one executed service agreement with PECO 
    Energy Company for Network Integration Transmission Service.
        Copies of this filing were served upon PECO Energy Company.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    43. Commonwealth Edison Company
    
    [Docket No. ER99-1605-000]
    
        Take notice that on January 29, 1999, Commonwealth Edison Company 
    (ComEd), tendered for filing a revised Firm Service Agreement with 
    Alliant Bulk Power (Alliant), under the terms of ComEd's Open Access 
    Transmission Tariff (OATT).
        ComEd requests an effective date of January 1, 1999, for the 
    revised service agreement, and accordingly, seeks waiver of the 
    Commission's notice requirements.
        Copies of this filing were served on Alliant.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    44. PP&L, Inc.
    
    [Docket No. ER99-1606-000]
    
        Take notice that on January 29, 1999, PP&L, Inc., tendered for 
    filing a Power Supply Agreement, dated January 25, 1999, with Allegheny 
    Electric Cooperative, Inc., of Lehigh County, Pennsylvania (AEC) under 
    PP&L's FERC Electric Tariff Revised Volume No. 5 and an amendment and 
    addendum to a Power Supply Agreement dated May 4, 1994 between PP&L and 
    AEC.
        PP&L requests an effective date of February 1, 1999, for the Power 
    Supply Agreement dated January 25, 1999. PP&L requests an effective 
    date of April 1, 1998, for the amendment and addendum to the Power 
    Supply Agreement dated May 4, 1994.
        PP&L states that copies of this filing have been supplied to AEC 
    and to the Pennsylvania Public Utility Commission.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    45. PP&L, Inc.
    
    [Docket No. ER99-1607-000]
    
        Take Notice that on January 29, 1999, PP&L, Inc., tendered for 
    filing a Power Supply Agreement, dated January 25, 1999, with Allegheny 
    Electric Cooperative, Inc., of Lehigh County, Pennsylvania (AEC) under 
    PP&L's FERC Electric Tariff Revised Volume No. 5, and an amendment and 
    addendum to a Power Supply Agreement dated February 13, 1995 between 
    PP&L and AEC.
        PP&L requests an effective date of February 1, 1999, for the Power 
    Supply Agreement dated January 25, 1999. PP&L requests an effective 
    date of April 1, 1998, for the amendment and addendum to the Power 
    Supply Agreement dated February 13, 1995.
        PP&L states that copies of this filing have been supplied to AEC 
    and to the Pennsylvania Public Utility Commission.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    46. PJM Interconnection, L.L.C.
    
    [Docket No. ER99-1608-000]
    
        Take notice that on January 29, 1999, PJM Interconnection, L.L.C. 
    (PJM), tendered for filing five signature pages of parties to the 
    Reliability Assurance Agreement among Load Serving Entities in the PJM 
    Control Area (RAA), and an amended Schedule 17, listing the parties to 
    the RAA.
        PJM states that it served a copy of its filing on all parties to 
    the RAA, including each of the parties for which a signature page is 
    being tendered with this filing, and each of the state electric 
    regulatory commissions within the PJM Control Area.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 7186]]
    
    47. New England Power Pool
    
    [Docket No. ER99-1609-000]
    
        Take notice that on January 29, 1999, the New England Power Pool 
    (NEPOOL) Executive Committee tendered for filing new Market Rules and 
    Procedures not previously submitted to the Commission. The NEPOOL 
    Executive Committee has requested that the new Market Rules apply for 
    all NEPOOL market transactions occurring after the Second Effective 
    Date, which the Committee indicates is now projected to occur April 1, 
    1999.
        The NEPOOL Executive Committee states that copies of these 
    materials were sent to the New England state governors and regulatory 
    commissions and the Participants in the New England Power Pool.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    48. New Century Services, Inc.
    
    [Docket No. ER99-1610-000]
    
        Take notice that on January 29, 1999, New Century Services, Inc., a 
    service company affiliate of Public Service Company of Colorado (PSCo), 
    Southwestern Public Service Company (SPS), and e prime, inc. (e prime), 
    has filed on their behalf the following: PSCo's Market-Based Wholesale 
    Power Sales Tariff; SPS's Market-Based Wholesale Power Sales Tariff 
    (SPS Tariff); a revised and restated version of the previously approved 
    e prime FERC Electric Rate Schedule No. 1; and a Statement of Policy 
    and Code of Conduct with Respect to the Relationship between the NCE 
    Operating Companies (PSCo and SPS, together with Cheyenne Light, Fuel 
    and Power Company) and their Wholesale Marketing Affiliates, including 
    e prime. NCS states that the SPS Tariff is not intended to supersede 
    SPS's existing market-based sales tariff.
        NCS requests that the Commission make these filings effective on 
    January 30, 1999.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    49. The Cincinnati Gas & Electric Company; PSI Energy, Inc.
    
    [Docket No. ER99-1611-000]
    
        Take notice that on January 29, 1999, The Cincinnati Gas & Electric 
    Company and PSI Energy, Inc. (Cinergy Operating Companies) tendered for 
    filing their quarterly transaction report for the calendar quarter 
    ending December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    50. Great Bay Power Corporation
    
    [Docket No. ER99-1612-000]
    
        Take notice that on January 29, 1999, Great Bay Power Corporation 
    (Great Bay), tendered for filing a service agreement between PP&L 
    EnergyPlus Co., and Great Bay for service under Great Bay's revised 
    Tariff for Short Term Sales. This Tariff was accepted for filing by the 
    Commission on July 24, 1998, in Docket No. ER98-3470-000.
        The service agreement is proposed to be effective January 27, 1999.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    51. Great Bay Power Corporation
    
    [Docket No. ER99-1613-000]
    
        Take notice that on January 29, 1999, Great Bay Power Corporation 
    (Great Bay), tendered for filing a service agreement between Duke 
    Energy Trading and Marketing, L.L.C., and Great Bay for service under 
    Great Bay's revised Tariff for Short Term Sales. This Tariff was 
    accepted for filing by the Commission on July 24, 1998, in Docket No. 
    ER98-3470-000.
        The service agreement is proposed to be effective January 22, 1999.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    52. New England Power Pool
    
    [Docket No. ER99-1614-000]
    
        Take notice that on January 29, 1999, the New England Power Pool 
    Executive Committee filed for acceptance a signature page to the New 
    England Power Pool (NEPOOL) Agreement dated September 1, 1971, as 
    amended, signed by Horizon Energy Corporation d/b/a Exelon Energy 
    (Exelon Energy). The NEPOOL Agreement has been designated NEPOOL FPC 
    No. 2.
        The Executive Committee states that the Commission's acceptance of 
    Exelon Energy's signature page would permit NEPOOL to expand its 
    membership to include Exelon Energy. NEPOOL further states that the 
    filed signature page does not change the NEPOOL Agreement in any 
    manner, other than to make Exelon Energy a member in NEPOOL.
        NEPOOL requests an effective date of January 1, 1999, for 
    commencement of participation in NEPOOL by Exelon Energy.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    53. New England Power Pool
    
    [Docket No. ER99-1615-000]
    
        Take notice that on January 29, 1999, the New England Power Pool 
    (NEPOOL or Pool) Executive Committee tendered for filing a request for 
    termination of memberships in NEPOOL, with an effective date of 
    February 1, 1999, of CWS Energy Service, Inc. (CWS ESI). Such 
    termination is pursuant to the terms of the NEPOOL Agreement dated 
    September 1, 1971, as amended, and previously signed by CWS ESI. The 
    New England Power Pool Agreement, as amended (the NEPOOL Agreement), 
    has been designated NEPOOL FPC No. 2.
        The Executive Committee states that termination of CWS ESI with an 
    effective date of February 1, 1999, would relieve this entity, at CWS 
    ESI's request, of the obligations and responsibilities of Pool 
    membership and would not change the NEPOOL Agreement in any manner, 
    other than to remove CWS ESI from membership in the Pool.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    54. Idaho Power Company
    
    [Docket No. ER99-1616-000]
    
        Take notice that on January 29, 1999, Idaho Power Company (IPC), 
    tendered for filing a Service Agreement under Idaho Power Company 
    Tariff Volume No. 6, Market Rate Power Sales, between Idaho Power 
    Company and Tillamook People's Utility District.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    55. Automated Power Exchange, Inc.
    
    [Docket No. ER99-1617-000]
    
        Take notice that on January 29, 1999, Automated Power Exchange, 
    Inc. (APX) filed its quarterly informational report. APX requested 
    confidential treatment of the filing. The report is for the period 
    October 1, 1998 through December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    56. Atlantic City Electric Company
    
    [Docket No. ER99-1618-000]
    
        Take notice that on January 29, 1999, Atlantic City Electric 
    Company (Atlantic), tendered a filing modifications the Atlantic zonal 
    transmission rate for network and point-to-point service under the PJM 
    open access tariff. Atlantic's existing zonal rates do not include the 
    costs of its 69 kV facilities. Atlantic's filing includes the costs of 
    its 69 kV facilities in its
    
    [[Page 7187]]
    
    zonal rates because these facilities function as part of Atlantic's 
    integrated transmission system.
        Atlantic requests that the Commission allow the modifications to 
    take effect on April 1, 1999.
        Atlantic states that copies of this filing have been served upon 
    the customer and affected state commissions.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    57. PJM Interconnection, L.L.C.
    
    [Docket No. ER99-1619-000]
    
        Take notice that on January 29, 1999, PJM Interconnection, L.L.C. 
    (PJM), tendered for filing 64 executed service agreements network 
    integration transmission service under state required retail access 
    programs and for point-to-point transmission service under the PJM Open 
    Access Transmission Tariff.
        Copies of this filing were served upon the parties to the service 
    agreements.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    58. Public Service Electric and Gas Company
    
    [Docket No. ER99-1620-000]
    
        Take notice that on January 29, 1999, Public Service Electric and 
    Gas Company (PSE&G) of Newark, New Jersey tendered for filing an 
    agreement for the sale of capacity and energy to Entergy Power 
    Marketing Corp. (Entergy), pursuant to the PSE&G Wholesale Power Market 
    Based Sales Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of December 29, 1998.
        Copies of the filing have been served upon Entergy and the New 
    Jersey Board of Public Utilities.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    59. California Independent System Operator Corporation
    
    [Docket No. ER99-1621-000]
    
        Take notice that on January 29, 1999, the California Independent 
    System Operator Corporation (ISO), tendered for filing a Meter Service 
    Agreement for scheduling Coordinators between the ISO and Pacificorp 
    Power Marketing, Inc., for acceptance by the Commission.
        The ISO states that this filing has been served on Pacificorp Power 
    Marketing, Inc., and the California Public Utilities Commission.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    60. Williams Generation Company--Hazelton
    
    [Docket No. ER99-1622-000]
    
        Take notice that on January 29, 1999, Williams Generation Company--
    Hazelton tendered for filing its Power Marketer Reports for the fourth 
    quarter of 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    61. Montaup Electric Company
    
    [Docket No. ER99-1625-000]
    
        Take notice that on January 29, 1999, Montaup Electric Company 
    tendered for filing its Quarterly Report of transactions for the 
    calendar quarter ending December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    62. Kentucky Utilities Company
    
    [Docket No. ER99-1626-000]
    
        Take notice that on January 29, 1999, Kentucky Utilities Company 
    (KU) tendered for filing a report of transactions for the quarter 
    ending December 31, 1998.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    63. California Independent System Operator Corporation
    
    [Docket No. ER99-1655-000]
    
        Take notice that on January 29, 1999, the California Independent 
    System Operator Corporation (ISO), tendered for filing a Scheduling 
    Coordinator Agreement between the ISO and Pacificorp Power Marketing, 
    Inc., for acceptance by the Commission.
        The ISO states that this filing has been served on Pacificorp Power 
    Marketing, Inc., and the California Public Utilities Commission.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    64. Western Resources, Inc.
    
    [Docket No. ES99-23-000]
    
        Take notice that on January 22, 1999, Western Resources Inc. 
    (Western Resources), tendered for filing an application under Section 
    204(a) of the Federal Power Act for authorization to issue and sell, 
    from time to time up to 1,950,000 additional common stock of Western 
    Resources, $5.00 par value (Additional Shares) under its Employee Stock 
    Purchase Plan. Western Resources further requests an exemption from the 
    Commission's competitive bidding and negotiated placement requirements.
        Comment date: February 25, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    65. Colorado Springs Utilities; East Kentucky Power Cooperative, 
    Inc.; New York Power Authority; Omaha Public Power District
    
    [Docket Nos. NJ97-9-004; NJ97-14-002; NJ97-10-002; and NJ97-2-004]
    
        Take notice that between December 23-28, 1998, the above-named 
    utilities filed revised standards of conduct in response to the 
    Commission's November 25, 1998 Order on Standards of Conduct. 85 FERC 
    para. 61,286 (1998).
        Comment date: February 19, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    66. Virginia Electric and Power Company
    
    [Docket No. OA96-52-005]
    
        Take notice that on January 19, 1999, Virginia Electric and Power 
    Company tendered for filing its refund compliance report in accordance 
    with Section 35.19a of the Commission's regulations. This compliance 
    report is being filed pursuant to the Commission's letter order issued 
    June 11, 1997 in the above-captioned docket.
        Comment date: March 8, 1999, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    67. SBR Associates and Ogden Haverhill Associates
    
    [Docket No. QF82-190-001]
    
        Take notice that on January 29, 1999, SBR Associates and Ogden 
    Haverhill Associates filed an application requesting the 
    recertification of the qualifying status of a cogeneration and small 
    power production facility and, in the alternative, a request for 
    waiver. Included as part of the Application is a FERC Form 556.
        A copy of this filing has been served on the Massachusetts 
    Department of Telecommunications and Energy and on the Massachusetts 
    Electric Company.
        Comment date: February 18, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions
    
    [[Page 7188]]
    
    or protests should be filed on or before the comment date. Protests 
    will be considered by the Commission in determining the appropriate 
    action to be taken, but will not serve to make protestants parties to 
    the proceeding. Any person wishing to become a party must file a motion 
    to intervene. Copies of these filings are on file with the Commission 
    and are available for public inspection.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-3453 Filed 2-11-99; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
02/12/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-3453
Dates:
February 25, 1999, in accordance with Standard Paragraph E at the end of this notice. 2. PSEG PPN Energy Company Ltd.
Pages:
7181-7188 (8 pages)
Docket Numbers:
Docket No. EF99-4011-000, et al.
PDF File:
99-3453.pdf