96-3103. Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 30 (Tuesday, February 13, 1996)]
    [Notices]
    [Page 5543]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-3103]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-167-000]
    
    
    Northwest Pipeline Corporation; Notice of Request Under Blanket 
    Authorization
    
    February 7, 1996.
        Take notice that on February 1, 1996, Northwest Pipeline 
    Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84158, 
    filed in Docket No. CP96-167-000 a request pursuant to Sections 
    157.205, 157.211 and 157.216 of the Commission's Regulations under the 
    Natural Gas Act (18 CFR 157.205, 157.211 and 157.216) for authorization 
    to abandon certain facilities at the Glenns Ferry Meter Station in 
    Elmore County, Idaho and to construct and operate upgraded replacement 
    facilities at this station to more efficiently accommodate existing 
    firm maximum daily delivery obligations at this delivery point to 
    Intermountain Gas Company under Northwest's blanket certificate issued 
    in Docket No. CP82-433-000 pursuant to Section 7 of the Natural Gas 
    Act, all as more fully set forth in the request that is on file with 
    the Commission and open to public inspection.
        Northwest states that since the existing regulators can not 
    efficiently accommodate the existing peak hourly flow rates, it 
    proposes to upgrade the Glenns Ferry Meter Station by replacing the two 
    existing 1-inch regulators and appurtenances with two new 1-inch 
    regulators and appurtenances.
        In addition, Northwest states that, as a result of this 
    replacement, the maximum design capacity of the meter station will 
    increase from 1,117 Dth per day (as limited by the existing regulators) 
    to approximately 1,867 Dth per day at 150 psig (as limited by the 
    existing meters).
        Northwest also states that no abandonment of service will occur and 
    no impact on Northwest's system peak day or annual deliveries is 
    projected to result from the proposed facility replacements at the 
    Glenns Ferry Meter Station.
        Northwest further states that the total cost of the proposed 
    facility replacement at the Glenns Ferry Meter Station is estimated to 
    be approximately $16,600; comprised of $15,600 for installation of the 
    new facilities and $1,000 for removal of the old facilities.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rue 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-3103 Filed 2-12-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
02/13/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-3103
Pages:
5543-5543 (1 pages)
Docket Numbers:
Docket No. CP96-167-000
PDF File:
96-3103.pdf