98-3767. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 63, Number 30 (Friday, February 13, 1998)]
    [Notices]
    [Page 7413]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-3767]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5488-8]
    
    
    Environmental Impact Statements; Notice of Availability
    
    RESPONSIBLE AGENCY: Office of Federal Activities, General Information 
    (202) 564-7167 OR (202) 564-7153.
        Weekly receipt of Environmental Impact Statements Filed February 
    02, 1998 Through February 06, 1998 Pursuant to 40 CFR 1506.9.
    
    EIS No. 980028, DRAFT EIS, COE, CA, Yuba River Basin Investigation 
    Study, Flood Protection, Also Portions of the Feather River Basin below 
    Oroville Dam, City of Maryville Yuba County, CA, Due: March 30, 1998, 
    Contact: Jane Rinck (916) 557-6715.
    EIS No. 980029, DRAFT EIS, COE, GA, Latham River/Jekyll Creek 
    Environmental Restoration Project (Section 1135), To Establish the 
    Without Project Condition, Atlantic Intracoastal Waterway (AIWW), Glynn 
    County, GA, Due: March 30, 1998, Contact: William Bailey (912) 652-
    5781.
    EIS No. 980030, DRAFT EIS, TVA, MS, Red Hills Power Project, Proposal 
    to Purchase 440 megawatts (MW) of Electrial Energy, COE Section 404 
    Permit, Town of Ackerman, Choctaw County, MS, Due: March 30, 1998, 
    Contact: Charles P. Nicholson (423) 632-3582.
    EIS No. 980031, DRAFT EIS, BLM, NV, Trenton Canyon Mining Project, 
    Construction, Operation and Expansion, Plan of Operation, Valma and 
    North Peak Deposits, Humboldt and Lander Counties, NV, Due: April 14, 
    1998, Contact: Rodney Herrick (702) 623-1500.
    EIS No. 980032, DRAFT EIS, COE, CA, Oakland Harbor Inner and Outer Deep 
    Navigation (-50 Foot) Improvement Project, Implementation, Feasibility 
    Study, Port of Oakland, Alameda and San Francisco Counties, CA, Due: 
    March 30, 1998, Contact: Gail Staba (510) 272-1479.
    EIS No. 980033, FINAL EIS, FHW, RI, Rhode Island Northeast Corridor 
    Freight Rail Improvement Project, Major Investment Study, 
    Implementation, Boston Switch in Central Falls to the Quonset Point/
    Davisville Industrial Park in North Kingtown, Funding, COE Section 10 
    and 404 Permits, Providence County, RI, Due: March 16, 1998, Contact: 
    Ralph J. Rizzo (401) 528-4548.
    EIS No. 980034, DRAFT SUPPLEMENT, NPS, CA, Santa Rosa Island Resources 
    Management Plan, Improvements of Water Quality and Conservation of Rare 
    Species and their Habitats, Channel Islands National Park, Santa 
    Barbara County, CA, Due: March 30, 1998, Contact: Alan Schmierer (415) 
    427-1441.
    EIS No. 980035, FINAL SUPPLEMENT, SCS, WV, North Fork Hughes River 
    Watershed Plan, Installation of a Multi-purpose Roller Compacted 
    Concrete Dam, Implementation and Funding, Flood Protection and COE 
    Section 404 Permits, Ritchie County, WV, Due: March 16, 1998, Contact: 
    Paul S. Dunn (304) 291-4153.
    EIS No. 980036, DRAFT SUPPLEMENT, USA, TT, Theater Missile Defense 
    (TMD) Extended Test Range (ETR) Project, Eglin Gulf Test Range to 
    Conduct (TMD Testing or Training Activities, Santa Rosa Island and Cape 
    San Blas, FL, Due: April 03, 1998, Contact: Linda Ninh (850) 882-6499.
    
        Dated: February 10, 1998.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 98-3767 Filed 2-12-98; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
02/13/1998
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
98-3767
Pages:
7413-7413 (1 pages)
Docket Numbers:
ER-FRL-5488-8
PDF File:
98-3767.pdf