97-3810. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 62, Number 31 (Friday, February 14, 1997)]
    [Notices]
    [Pages 6969-6970]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-3810]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-5477-4]
    
    
    Environmental Impact Statements; Notice of Availability
    
        Responsible Agency: Office of Federal Activities, General 
    Information (202) 564-7167 OR (202) 564-7153. Weekly receipt of 
    Environmental Impact Statements Filed February 03, 1997 Through 
    February 07, 1997 Pursuant to 40 CFR 1506.9.
    
    EIS No. 970045, Draft Supplement, FRC, ME, Granite State Gas 
    Transmission, Construction and Operation of a Liquefied Natural Gas 
    Facility, Updated Information on Potential Alternative Sites, Permits 
    and Approvals, In the Town of Wells, York County, ME, Due: March 31, 
    1997, Contact: Chris Zerby (202) 208-0111.
    EIS No. 970046, Final Supplement, AFS, VA, WV, George Washington 
    National Forest, Revised Land and Resource Management Plan, Consenting 
    to Oil and Gas Leasing in Laurel Fork Special Management Area, Highland 
    County, VA, Due: March 17, 1997, Contact: Dave Plunkett (540) 564-8300.
    EIS No. 970047, Final EIS, NPS, NY, Manhattan
    
        Sites General Management Plans, Implementation, Castle Clinton 
    National Monument, Federal Hall National Memorial, General Grant 
    National Memorial, Saint Paul's Church National Historic Site and 
    Theodore Roosevelt Birthplace National Historic Site, New York and 
    Westchester Counties, NY, Due: March 17, 1997, Contact: Joseph Avery 
    (212) 825-6990.
    EIS No. 970048, Final EIS, BLM, UT, Lisbon Valley Copper Project, Plan 
    of Operations Approval for an Open Pit Copper Mine and Heach Operation 
    in Lower Lisbon Valley, San Juan and Grand Counties, UT, Due: March 17, 
    1997, Contact: Lynn Jackson (801) 259-6111.
    EIS No. 970049, Final EIS, NOA, HI, Hawaiian Islands Humpback Whales 
    and Their Habitat National Marine Sanctuary Management Plan, 
    Implementation, Honolulu, Kauai and Maui Counties, HI, Due: March 17, 
    1997, Contact: W. Stanley Wilson (301) 713-3074.
    EIS No. 970050, Final EIS, USN, CA, Naval Station Long Beach Disposal 
    and Reuse, Implementation, COE Section 10 and 404 Permits Issuance and 
    Possible NPDES Permit Issuance, Los Angeles County, CA, Due: March 17, 
    1997, Contact: John Hill (619) 556-0250 ext.221.
    EIS No. 970051, DRAFT EIS, NCP, DC, New Washington Convention Center, 
    Construction and Operation, Possible Sites are Mount Vernon Square and 
    Northeast No.1, Washington Convention Center Authority, Washington, DC, 
    Due: March 31, 1997, Contact: Reginald Griffith (202) 724-0174.
    EIS No. 970052, Final EIS, FTA, CA, South Sacramento Corridor, Transit 
    Improvements, Funding, Sacramento, Yolo, EL Dorado and Placer Counties, 
    CA, Due: March 17, 1997, Contact: Bob Hom (415) 744-3133.
    EIS No. 970053, Draft EIS, BLM, WY, Cave Gulch-Bullfrog-Waltman Natural 
    Gas Development Project, Implementation, Platte River Resource Area, 
    Natrona County, WY, Due: April 01, 1997, Contact: Kate Padilla (307) 
    261-7603.
    EIS No. 970054, Draft EIS, UAF, TX, Reese Air Force Base (AFB) Disposal 
    and Reuse, Implementation, NPDES Permit and COE Section 404 Permit, 
    Lubbock and Terry Counties, TX, Due: March 31, 1997, Contact: Robert 
    Lopez (210) 536-6545.
    EIS No. 970055, Draft Supplement, FAA, WA, Seattle-Tacoma International 
    Airport Improvement, South Aviation Support Area, Airport Layout Plan, 
    Airport Master Plan; Updated Information on Master Plan Development 
    Actions, Funding, Section 10 and 404 Permits and NPDES Permit, Port of 
    Seattle, King County, WA, Due: March 31, 1997, Contact: Dennis Ossenkop 
    (206) 227-2611.
    EIS No. 970056, Draft Supplement, USN, PR, VA, Relocatable Over the 
    Horizon Radar (ROTHR) System Construction and Operation, New and 
    Updated Information on Fort Allen as Potential Site, Commonwealth of 
    Puerto Rico and Chesapeake, VA, Due: March 31, 1997, Contact: Linda 
    Blount (757) 322-4892.
    
    Amended Notices
    
    EIS No. 960099, Draft EIS, AFS, OR, Red Mountain Project, 
    Implementation, Three Timber Sales: Twin, Muddy Creek and Gee, Wallowa-
    Whitman National Forest, Baker Ranger District, Baker County, or, Due: 
    Contact: Barry Hansen (503) 523-6391. Published FR 01-19-96--Officially 
    Withdrawn by the Preparing Agency.
    
    [[Page 6970]]
    
    EIS No. 960587, Draft EIS, AFS, OR, Robinson-Scott Landscape Management 
    Project, Timber Harvest and other Vegetation Management, Willamette 
    National Forest, McKenzie Ranger District, Lane and Linn Counties, or, 
    Due: February 24, 1997, Contact: John Allen (541) 822-3381. Published 
    FR 12-27-96--Review Period extended.
    EIS No. 970044, Final EIS, AFS, CA, Dinkey Allotment Livestock Grazing 
    Strategies, Implementation, Sierra National Forest, Fresno County, CA, 
    Due: March 10, 1997, Contact: Terry Elliott (209) 297-0706 ext.4881. 
    Published FR--02-07-97--Telephone Number Correction.
        Dated: February 11, 1997.
    B. Katherine Biggs,
    Associate Director, NEPA Compliance Division, Office of Federal 
    Activities.
    [FR Doc. 97-3810 Filed 2-13-97; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
02/14/1997
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
97-3810
Pages:
6969-6970 (2 pages)
Docket Numbers:
ER-FRL-5477-4
PDF File:
97-3810.pdf