96-3372. Williston Basin Interstate Pipeline Company; Notice of Application  

  • [Federal Register Volume 61, Number 32 (Thursday, February 15, 1996)]
    [Notices]
    [Page 5994]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-3372]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-170-000]
    
    
    Williston Basin Interstate Pipeline Company; Notice of 
    Application
    
    February 9, 1996.
        Take notice that on February 5, 1996, Williston Basin Interstate 
    Pipeline Company (Williston Basin), Suite 300, 200 North Third Street, 
    Bismarck, North Dakota 58501, filed in Docket No. CP96-170-000 an 
    application pursuant to Section 7(b) of the Natural Gas Act for 
    permission and approval to abandon a compressor in Stark County, North 
    Dakota, all as more fully set forth in the application on file with the 
    Commission and open to public inspection.
        Williston Basin proposes to abandon compressor No. 6 and related 
    facilities in Stark County, North Dakota, since it is no longer needed. 
    It is stated that there would be no impact on Williston Basin's current 
    operations.
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before March 1, 1996, file 
    with the Federal Energy Regulatory Commission, Washington, DC 20426, a 
    motion to intervene or a protest in accordance with the requirements of 
    the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
    385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10). 
    All protests filed with the Commission will be considered by it in 
    determining the appropriate action to be taken but will not serve to 
    make the protestants parties to the proceeding. Any person wishing to 
    become a party to a proceeding or to participate as a party in any 
    hearing therein must file a motion to intervene in accordance with the 
    Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that permission and approval for the proposed abandonment are 
    required by the public convenience and necessity. If a motion for leave 
    to intervene is timely filed, or if the Commission on its own motion 
    believes that a formal hearing is required, further notice of such 
    hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Williston Basin to appear or be represented 
    at the hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-3372 Filed 2-14-96; 8:45 am]
    BILLING CODE 6716-01-M
    
    

Document Information

Published:
02/15/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-3372
Pages:
5994-5994 (1 pages)
Docket Numbers:
Docket No. CP96-170-000
PDF File:
96-3372.pdf