2011-3459. Sunshine Act Meeting Notice  

  • Start Preamble

    The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 U.S.C. 552b:

    AGENCY HOLDING MEETING:

    Federal Energy Regulatory Commission.

    DATE AND TIME:

    February 17, 2011, 10 a.m.

    PLACE:

    Room 2C, 888 First Street, NE., Washington, DC 20426.

    STATUS:

    OPEN.

    MATTERS TO BE CONSIDERED:

    Agenda.

    Note:

    Items listed on the agenda may be deleted without further notice.

    CONTACT PERSON FOR MORE INFORMATION:

    Kimberly D. Bose, Secretary, Telephone (202) 502-8400.

    For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.

    This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.

    967TH—MeetingStart Printed Page 8728

    Regular Meeting

    February 17, 2011, 10 a.m.

    Item No.Docket No.Company
    Administrative
    A-1AD02-1-000Agency Business Matters.
    A-2AD02-7-000Customer Matters, Reliability, Security and Market Operations.
    Electric
    E-1ER03-563-066Devon Power LLC.
    E-2EL10-71-000Puget Sound Energy, Inc.
    E-3RM11-9-000Locational Exchanges of Wholesale Electric Power.
    E-4RM11-7-000 AD10-11-000Frequency Regulation Compensation in the Organized Wholesale Power Markets.
    E-5RM10-17-000Demand Response Compensation in Organized Wholesale Energy Markets.
    E-6RM10-13-001Credit Reforms in Organized Wholesale Electric Markets.
    E-7RM08-13-001Transmission Relay Loadability Reliability Standard.
    E-8RM08-19-004Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System.
    E-9ER11-2411-000Southern California Edison Company.
    ER11-2572-000California Independent System Operator Corporation.
    E-10ER11-2455-000Southern California Edison Company.
    ER11-2451-000California Independent System Operator Corporation.
    E-11ER05-1056-005Chehalis Power Generating, L.P.
    E-12ER10-2869-000Midwest Independent Transmission System Operator, Inc.
    E-13ER11-2427-000ISO New England, Inc.
    E-14EL10-62-000Alta Wind I, LLC, Alta Wind II, LLC, Alta Wind III, LLC, Alta Wind IV, LLC, Alta Wind V, LLC, Alta Wind VI, LLC, Alta Wind VII, LLC, Alta Wind VIII, LLC, Alta Windpower Development, LLC, TGP Development Company, LLC.
    Gas
    G-1RP08-306-000Portland Natural Gas Transmission System.
    G-2IS08-390-002SFPP, L.P.
    Hydro
    H-1RM11-6-000Annual Charges for Use of Government Lands.
    H-2P-2210-209Appalachian Power Company.
    H-3P-2210-206Appalachian Power Company.
    H-4P-12532-003Pine Creek Mine, LLC.
    P-13317-001Bishop Paiute Tribe.
    P-13689-001KC LLC.
    Certificates
    C-1CP10-485-000Tennessee Gas Pipeline Company.
    Start Signature

    Dated: February 10, 2011.

    Kimberly D. Bose,

    Secretary.

    End Signature

    A free Webcast of this event is available through http://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to http://www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.

    Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.

    End Preamble

    [FR Doc. 2011-3459 Filed 2-11-11; 11:15 am]

    BILLING CODE 6717-01-P

Document Information

Published:
02/15/2011
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2011-3459
Pages:
8727-8728 (2 pages)
PDF File:
2011-3459.pdf