96-3532. El Paso Natural Gas Co.; Notice of Application  

  • [Federal Register Volume 61, Number 33 (Friday, February 16, 1996)]
    [Notices]
    [Page 6235]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-3532]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    El Paso Natural Gas Co.; Notice of Application
    
    [Docket No. CP96-173-000]
    February 12, 1996.
        Take notice that on February 6, 1996, El Paso Natural Gas Company 
    (El Paso), P.O. Box 1492, El Paso, Texas 79978, filed in Docket No. 
    CP96-173-000 an application pursaunt to Section 7(b) of the Natural Gas 
    Act for permission and approval to abandon a transportation service for 
    Natural Gas Pipeline Company of America, which was authorized in Docket 
    No. CP78-239, et al., all as more fully set forth in the application on 
    file with the Commission and open to public inspection.
        El Paso proposes to abandon the transportation service because it 
    is no longer needed and has terminated on own its terms on May 1, 1989.
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before March 4, 1996, file 
    with the Federal Energy Regulatory Commission, Washington, D.C. 20426, 
    a motion to intervene or a protest in accordance with the requirements 
    of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
    385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10). 
    All protests filed with the Commission will be considered by it in 
    determining the appropriate action to be taken but will not serve to 
    make the protestants parties to the proceeding. Any person wishing to 
    become a party to a proceeding or to participate as a party in any 
    hearing therein must file a motion to intervene in accordance with the 
    Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that permission and approval for the proposed abandonment are 
    required by the public convenience and necessity. If a motion for leave 
    to intervene is timely filed, or if the Commission on its own motion 
    believes that a formal hearing is required, further notice of such 
    hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for El Paso to appear or be represented at the 
    hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-3532 Filed 2-15-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
02/16/1996
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
96-3532
Pages:
6235-6235 (1 pages)
PDF File:
96-3532.pdf