[Federal Register Volume 60, Number 33 (Friday, February 17, 1995)]
[Notices]
[Pages 9328-9329]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-3980]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG95-30-000, et al.]
Austin Cogeneration Partners, L.P., et al.; Electric Rate and
Corporate Regulation Filings
February 10, 1995.
Take notice that the following filings have been made with the
Commission:
1. Austin Cogeneration Partners, L.P.
[Docket No. EG95-30-000]
On February 6, 1995, Austin Cogeneration Partners, L.P.
(``Applicant'') filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to 18 CFR Part 365.
Applicant is a Delaware limited partnership formed to acquire an
ownership interest in a 255 MW natural gas-fired cogeneration facility
to be located in the City of Austin, Texas, and/or operate such
facility and engage in project development activities with respect
thereto.
Comment date: March 6, 1995, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. Louis Dreyfus Electric Power, Inc.
[Docket No. ER92-850-010]
Take notice that on January 26, 1995, Louis Dreyfus Electric Power,
Inc. (Louis Dreyfus) filed information required by the Commission's
December 2, 1992 letter order in Docket No. ER92-850-000. Copies of
Louis Dreyfus' informational filing are on file with the Commission and
are available for public inspection.
3. North American Energy Conservation, Inc.
[Docket No. ER94-152-004]
Take notice that on January 30, 1995, North American Energy
Conservation, Inc. (North American) filed information required by the
Commission's February 10, 1994 letter order in Docket No. ER94-152-000.
Copies of North American's informational filing are on file with the
Commission and are available for public inspection.
4. Howell Power Systems, Inc.
[Docket No. ER94-178-004]
Take notice that on January 30, 1995, Howell Power Systems, Inc.
(Howell Power) filed information required by the Commission's January
14, 1994 letter order in Docket No. ER94-178-000. Copies of Howell
Power's informational filing are on file with the Commission and are
available for public inspection.
5. LG&E Power Marketing, Inc.
[Docket No. ER94-1188-004]
Take notice that on January 30, 1995, LG&E Power Marketing, Inc.
(LG&E) filed information required by the Commission's August 19, 1994
order in Docket No. ER94-1188-000. Copies of LG&E's informational
filing are on file with the Commission and are available for public
inspection.
6. Valero Power Services Co.
[Docket No. ER94-1394-002]
Take notice that on January 30, 1995, Valero Power Services (Valero
Power) filed information required by the Commission's August 24, 1994
letter order in Docket No. ER94-1394-000. Copies of Valero Power's
informational filing are on file with the Commission and are available
for public inspection.
7. Coastal Electric Services Co.
[Docket No. ER94-1450-001]
Take notice that on January 30, 1995, Coastal Electric Services
Company (Coastal Services) filed information required by the
Commission's September 29, 1994 letter order in Docket No. ER94-1450-
000. Copies of Coastal Services' informational filing are on file with
the Commission and are available for public inspection.
8. Calpine Power Marketing
[Docket No. ER94-1545-000]
Take notice that on February 8, 1995, Calpine Power Marketing, Inc.
(CPMI), filed an amendment to its petition to the Commission for
acceptance of CPMI Revised Rate Schedule FERC No. 1; the granting of
certain blanket approvals, including the authority to sell electricity
at market-based rates; and the waiver of certain Commission
regulations. CPMI is a direct subsidiary of Calpine Corporation which,
through other subsidiaries, owns and operates non-utility generating
facilities and related business ventures in the United States. Calpine
Corporation is indirectly and partially owned by CS Holding of
[[Page 9329]] Zurich, Switzerland, which, through other subsidiaries,
owns utility generating facilities in Europe, financial service
providers and other entities.
Comment date: February 24, 1995, in accordance with Standard
Paragraph E at the end of this notice.
9. Gulfstream Energy, LLC
[Docket No. ER94-1597-001]
Take notice that on January 30, 1995, Gulfstream Energy, LLC
(Gulfstream) filed information required by the Commission's November
21, 1994 letter order in Docket No. ER94-1597-000. Copies of
Gulfstream's informational filing are on file with the Commission and
are available for public inspection.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-3980 Filed 2-16-95; 8:45 am]
BILLING CODE 6717-01-P