99-3767. Drawbridge Operation Regulations; Cambridge Creek, Cambridge, MD  

  • [Federal Register Volume 64, Number 31 (Wednesday, February 17, 1999)]
    [Rules and Regulations]
    [Page 7788]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-3767]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD05-99-005]
    
    
    Drawbridge Operation Regulations; Cambridge Creek, Cambridge, MD
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice of temporary deviation from regulations.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Commander, Fifth Coast Guard District has issued a 
    temporary deviation from the regulations governing the operation of the 
    drawbridge across Cambridge Creek, mile 0.1, in Cambridge, Maryland. 
    Beginning March 15, 1999, through March 19, 1999, this deviation allows 
    the bridge to remain closed to navigation 24-hours a day. This closure 
    is necessary to facilitate the replacement of the fender system piling.
    
    EFFECTIVE DATE: This deviation is effective 24-hours a day from March 
    15, 1999 through March 19, 1999.
    
    FOR FURTHER INFORMATION CONTACT: Ann B. Deaton, Bridge Administrator, 
    Fifth Coast Guard District, at (757) 398-6222.
    
    SUPPLEMENTARY INFORMATION: The Cambridge Creek drawbridge is owned and 
    operated by the Maryland State Highway Administration (MDSHA). The 
    current regulations in Title 33 Code of Federal Regulations, 
    Sec. 117.549 require the draw to open on signal from 6 a.m. to 8 p.m.; 
    except that, from 12 noon to 1 p.m. Monday through Friday, the draw 
    need not be opened. From 8 p.m. to 6 a.m., seven-days a week, the draw 
    need not be opened.
        On December 16, 1998, the Coast Guard received a request from MDSHA 
    to close the navigation channel at the Cambridge Creek bridge to 
    facilitate the replacement of the fender system piling. This work will 
    also result in the complete closure of the drawbridge. MDSHA held a 
    town meeting at which businesses and marinas affected by this 
    replacement work requested a complete closure of the roadway to speed 
    construction. A complete closure allows the replacement work to be 
    completed before the weather warms up and their fishing and tourist 
    season begins.
        The Coast Guard has advised the local Coast Guard units, including 
    Activities Baltimore, of the bridge's closure on the requested dates, 
    and they did not object. The Coast Guard will inform the commercial/
    recreational users of the waterway of the bridge closures in the weekly 
    Notice to Mariners so that these vessels can arrange their transits to 
    avoid being negatively impacted by the temporary deviation.
        Beginning March 15, 1999, through March 19, 1999, this deviation 
    allows the bridge to remain closed to navigation 24-hours a day.
    
        Dated: February 3, 1999.
    Roger T. Rufe, Jr.,
    Vice Admiral, U.S. Coast Guard Commander, Fifth Coast Guard District.
    [FR Doc. 99-3767 Filed 2-16-99; 8:45 am]
    BILLING CODE 4910-15-M
    
    
    

Document Information

Effective Date:
3/15/1999
Published:
02/17/1999
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
99-3767
Dates:
This deviation is effective 24-hours a day from March 15, 1999 through March 19, 1999.
Pages:
7788-7788 (1 pages)
Docket Numbers:
CGD05-99-005
PDF File:
99-3767.pdf
CFR: (1)
33 CFR 117.549