E9-3144. Technical Specifications Task Force; Denial of Petition for Rulemaking  

  • Start Preamble Start Printed Page 7382

    AGENCY:

    Nuclear Regulatory Commission.

    ACTION:

    Petition for rulemaking: Denial.

    SUMMARY:

    The U.S. Nuclear Regulatory Commission (NRC) is denying a petition for rulemaking (PRM-170-6) submitted by the Technical Specifications Task Force (TSTF), which is a jointly sponsored activity of the Pressurized Water Reactor Owners Group and the Boiling Water Reactor Owners' Group. The petition requests that the NRC amend its regulations to provide an explicit exemption from NRC review fees for activities associated with generic improvements to the Improved Standard Technical Specifications (ISTS). The NRC is denying the petition because the petition presents issues that the NRC has already carefully considered and addressed. Also, the petition fails to present any significant new information or arguments that would warrant the requested amendment.

    ADDRESSES:

    You can access publicly available documents related to this petition for rulemaking using the following methods:

    Federal e-Rulemaking Portal: Go to http://www.regulations.gov and search for documents filed under Docket ID [NRC-2008-0496]. Address questions about NRC dockets to Carol Gallagher 301-492-3668; e-mail Carol.Gallagher@nrc.gov.

    NRC's Public Document room (PDR): The public may examine and have copied for a fee publicly available documents at the NRC's PDR, Public File Area O1 F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.

    NRC's Agencywide Documents Access and Management System (ADAMS): Publicly available documents created or received at the NRC are available electronically at the NRC's Electronic Reading Room at http://www.nrc.gov/​reading-rm/​adams.html. From this page, the public can gain entry into ADAMS, which provides text and image files of NRC's public documents. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC PDR reference staff at 1-800-397-4209, 301-415-4737 or by e-mail to pdr.resource@nrc.gov.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Rebecca I. Erickson, Office of the Chief Financial Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone 301-415-7126; e-mail Rebecca.Erickson@nrc.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Background

    The Nuclear Regulatory Commission (NRC) is required each year, under the Omnibus Budget Reconciliation Act of 1990 (OBRA-90), as amended, (42 U.S.C. 2214) to recover approximately 90 percent of its budget authority, less the amounts appropriated from the Nuclear Waste Fund (NWF), amounts appropriated for Waste Incidental to Reprocessing (WIR) activities, and amounts appropriated for generic homeland security activities, through fees to NRC licensees and applicants.

    The NRC assesses two types of fees to meet the requirements of OBRA-90, as amended. First, license and inspection fees, established in 10 CFR part 170 under the authority of the Independent Offices Appropriation Act of 1952 (IOAA) (31 U.S.C. 9701), recover the NRC's costs of providing special benefits to identifiable applicants and licensees. Second, annual fees established in 10 CFR part 171 under the authority of OBRA-90, as amended, recover generic and other regulatory costs not otherwise recovered through 10 CFR part 170 fees.

    There are fee exemption provisions under both 10 CFR part 170 and 171. At the time the NRC became a separate regulatory agency on January 19, 1975, there were nine exemptions in effect in § 170.11(a). Changes have been made to the original nine exemptions.

    Before the fiscal year (FY) 2002 final fee rule became effective, an exemption for Part 170 fees was part of footnote 4 to § 170.21 and footnote 5 to § 170.31. The NRC continued to receive requests for fee exemptions that did not meet the intent of the waiver provisions. The NRC determined that footnote 4 to § 170.21, footnote 5 to § 170.31, and material in the definition of “Special Projects” in § 170.3 concerning these types of requests and reports provided information that was more suitable for inclusion in § 170.11, “Exemptions.” As a result, in the FY 2002 fee rule (67 FR 42629; June 24, 2002), the NRC removed the language relating to certain reports and requests submitted to the NRC for review from the definition of “Special Projects” in § 170.3, removed footnote 4 to § 170.21, and removed footnote 5 to § 170.31. The NRC also added paragraph (a)(1) to § 170.11.

    The NRC revised the fee waiver provision to specifically state that the fee waiver criteria would apply only when it was demonstrated that the report or request had been submitted to the NRC for the specific purpose of supporting the generic regulatory improvements or efforts of the NRC, rather than the industry, and that the NRC, at the time of the submission, planned to use the submission for that purpose. The amendment also clarified that the waiver provisions would not apply to reports or documents submitted for the NRC's review that the NRC, at the time of the submission, did not plan to use to improve its regulatory program. Therefore, since these reviews would primarily provide a special benefit to identifiable recipients, such as individual members of the public, industry entities, vendors, or specific licensees, a fee waiver would not be available. This clarification is stated in § 170.11(a)(1)(iii):

    (C) Fees will not be waived for reports/requests that are not submitted specifically for the purpose of supporting the NRC's generic regulatory improvements or efforts, because the primary beneficiary of the NRC's review and approval of such documents is the requesting organization. In this case, the waiver provision does not apply even though the NRC may realize some benefits from its review and approval of the document.

    (D) An example of the type of document that does not meet the fee waiver criteria is a topical report submitted for the purpose of obtaining NRC approval so that the report can be used by the industry in the future to address licensing or safety issues.

    Start Printed Page 7383

    The fee waiver provisions in § 170.11(a)(1) have not changed after FY 2002, with the exception of § 170.11(a)(1)(iii)(A)(3), which was added by the FY 2005 fee rule amendment (70 FR 30543; May 26, 2005). This provision specifies that a fee exemption request must be made in writing to the NRC's Chief Financial Officer who must address the request in writing.

    The Petition

    The petitioner requests that NRC amend 10 CFR 170.11, “Exemptions” to provide an exemption for activities associated with generic improvements to the ISTS to make the regulations consistent with the Commission's Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors (signed on July 16, 1993, and published on July 22, 1993; 58 FR 39132). The Policy Statement states that ISTS have been developed and will be maintained. It also states that the NRC will, consistent with its mission, allocate resources as necessary to implement the Policy Statement. The petitioner states that, contrary to the Policy Statement, in 2003, the NRC began assessing fees for the review of industry actions to maintain the ISTS, known as “Travelers.” According to the petitioner, this placed the entire burden of maintaining the ISTS on the industry, which has subsequently paid over $750,000 in fees.

    The petitioner states that it has repeatedly requested fee exemptions from the NRC for the review of Travelers and has almost always been rejected on the basis that § 170.11 does not contain a provision for exempting the activity. Therefore the petitioner requests that the NRC amend § 170.11 to provide an exemption for activities associated with generic improvements to the ISTS to make the regulations consistent with the Policy Statement. Specifically, the petitioner requests that a new paragraph be added as § 170.11(a)(1)(iii)(A)(4) to provide an exemption for activities associated with generic improvements to the ISTS.

    The petitioner states that the imposition of review fees for the review of generic improvements to the ISTS is unduly burdensome. According to the petitioner, a direct result of the inconsistency between the Commission's Policy Statement and the provisions of 10 CFR 170.11 is that the industry owner's groups have paid over $750,000 in NRC review fees after 2003 for maintenance of the ISTS when the NRC's policy was that the NRC would allocate the resources for that activity.

    The petitioner states that the current provisions of 10 CFR 170.11 are deficient in that the imposition of review fees for the review of generic improvements to the ISTS is inconsistent with NRC policy. The petitioner also states that the Consolidated Line Item Improvement Process (CLIIP) described in NRC Regulatory Information Summary 2000-06 contains a streamlined regulatory process describing how licensees can request license amendments based on NRC-approved Travelers. The petitioner believes the CLIIP process saves significant NRC resources by requiring an average of one-tenth of the hours for NRC review compared to a similar non-CLIIP amendment.

    The petitioner estimates that after the initiation of the CLIIP process, over 500 license amendments have been approved that have saved the NRC more than 40 work-years of effort after FY 2001. The petitioner states that submittal of new Travelers by the nuclear industry has dropped from an average of 56 per year during 1995-2002 to an average of nine per year after the imposition of fees for Travelers reviews. The petitioner suggests that it is in the NRC's interest to support the CLIIP by encouraging the submittal of Travelers through the elimination of review fees.

    To implement the NRC's policy properly, remove an undue burden on licensees, and improve the NRC's efficiency, the petitioner requests that § 170.11 be amended as suggested in its petition for rulemaking to provide an exemption from review fees for generic improvements to standard technical specifications. The petitioner believes there is adequate justification and precedent for the NRC to implement the provisions presented in this petition for rulemaking and requests that the NRC issue a proposed rule and direct final rule concurrently.

    Reasons for Denial

    The petition presents issues that have been carefully considered and addressed in earlier correspondence. The NRC informed the TSTF of the change in the fee exemption status for Travelers in a January 10, 2003, letter to the TSTF from W. D. Beckner, NRC Program Director (ADAMS Accession Number ML030100090). Mr. Beckner explained that the industry had not been assessed Part 170 fees for review of proposals to revise standard technical specifications (STS) because those proposals were used by the NRC to make generic regulatory improvements. Mr. Beckner also explained that for the most part those regulatory improvements had been achieved, and the review of the proposed STS changes being submitted to the NRC would primarily benefit specific licensees rather than enhancing the NRC regulatory process. Thus, future submissions would be subject to fees unless a fee exemption was allowed under 10 CFR 170.11(a)(1).

    Further, the NRC received an April 28, 2006, letter from the TSTF on this same subject (ADAMS Accession Number ML061210034). NRC's Chief Financial Officer, J.L. Funches, explained in his June 14, 2006, response to the TSTF that the NRC's budgeted costs must be recovered, by law, through fees assessed to licensees and applicants (ADAMS Accession Number ML061650078). Mr. Funches also explained that the NRC's commitment to allocate budget resources to implement the Policy Statement is not related to the assessment of fees. Therefore, the NRC did not believe that its assessment of fees for review work of a Traveler was a contradiction to the Policy Statement.

    The NRC continues to believe it is fair and appropriate to apply the fee exemption criteria in § 170.11 to all Special projects as defined under § 170.3, “Definitions.” The NRC is unable to determine in advance whether all Travelers will meet the fee exemption criteria; thus, the NRC must separately review each fee exemption request to determine whether the fee exemption criteria apply.

    With regard to the use of the CLIIP process in saving significant NRC resources, although the NRC is committed to actions which promote the efficient use of NRC resources, providing a fee exemption based on a cost savings to the NRC is contrary to the IOAA. Under the authority of the IOAA, the NRC recovers the costs of providing special benefits to identifiable applicants and licensees. In response to the petition comment that the imposition of review fees is unduly burdensome on the industry, with extremely limited exceptions, the NRC does not base its fees on the economic circumstances of particular licensees or classes of licensees. If the NRC were to grant the petition, other licensees would be required to subsidize the Travelers through increased fees in order for the NRC to meet the requirements of OBRA-90.

    The petitioner offers no new arguments for the NRC's consideration. Therefore, the NRC has determined that it would be an unwise expenditure of resources to conduct a rulemaking on this matter.

    For these reasons, the Commission denies PRM-170-6.

    Start Signature
    Start Printed Page 7384

    Dated at Rockville, Maryland, this 5th day of February, 2009.

    For the Nuclear Regulatory Commission.

    J.E. Dyer,

    Chief Financial Officer.

    End Signature End Supplemental Information

    [FR Doc. E9-3144 Filed 2-13-09; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Published:
02/17/2009
Department:
Nuclear Regulatory Commission
Entry Type:
Proposed Rule
Action:
Petition for rulemaking: Denial.
Document Number:
E9-3144
Pages:
7382-7384 (3 pages)
Docket Numbers:
Docket No. PRM-170-6, NRC-2008-0496
PDF File:
e9-3144.pdf
CFR: (1)
10 CFR 170