97-3854. Sabine Pipe Line Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 32 (Tuesday, February 18, 1997)]
    [Notices]
    [Pages 7224-7225]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-3854]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP97-226-000]
    
    
    Sabine Pipe Line Company; Notice of Request Under Blanket 
    Authorization
    
    February 11, 1997.
        Take notice that on February 4, 1997, Sabine Pipe Line Company 
    (Sabine) P.O. Box 4781, Houston, Texas 77210-4781, filed in the above 
    docket, a request pursuant to Sections 157.205 and 157.211 of the 
    Commission's Regulations for authorization to use an existing receipt 
    tap to deliver gas through displacement to MidCon Gas Pipeline Corp. 
    (MidCon). The receipt
    
    [[Page 7225]]
    
    tap, constructed under Sabine's blanket certificate issued on March 31, 
    1983, in Docket No. CP83-199-000, interconnects Sabine's 16-inch low-
    pressure mainline with MidCon's pipeline in Jefferson County, Texas, 
    all as more fully set forth in the request which is file with the 
    Commission and open to public inspection.
        Sabine states that the maximum quantity of gas that will be 
    delivered through the interconnect is 100,000 MMcf per day. Sabine also 
    states that the delivery through displacement to the MidCon point will 
    be available to all existing and potential shippers receiving service 
    under Sabine's IT-1 Rate Schedule set forth in Sabine's FERC Gas 
    Tariff, subject to prevailing operating conditions. Sabine states that 
    no construction is required to operate the point as proposed, and 
    therefore, no costs will be incurred.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.215) a motion to intervene or notice of intervention and pursuant 
    to Sec. 157.205 of the Regulations under the Natural Gas Act (18 CFR 
    157.205) a protest to the request. If no protest is filed within the 
    time allowed therefor, the proposed activity is deemed to be authorized 
    effective on the day after the time allowed for filing a protest. If a 
    protest is filed and not withdrawn within 30 days after the time 
    allowed for filing a protest, the instant request shall be treated as 
    an application for authorization pursuant to Section 7 of the Natural 
    Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-3854 Filed 2-14-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/18/1997