[Federal Register Volume 63, Number 32 (Wednesday, February 18, 1998)]
[Notices]
[Pages 8194-8195]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-3947]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Acceptance and Notice Requesting
Interventions and Protests
February 11, 1998.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Original License for a Major Water Power
Project--5 Megawatts or Less.
b. Project No.: 11480.
c. Date filed: November 25, 1997.
d. Applicant: Haida Corporation.
e. Name of Project: Reynolds Creek Hydroelectric Project.
f. Location: On Reynolds Creek, Prince of Wales Island, Alaska.
g. Filed Pursuant to: Federal Power Act and Public Utility
Regulatory Policies Act.
h. Applicant Contact: Michael V. Stimac, HDR Engineering, Inc.,
500-108th Avenue NE, Suite 1200, Bellevue, Washington 98004-5538, (425)
453-1523.
i. FERC Contact: Carl J. Keller, (202) 219-2831.
j. Deadline for filing interventions and protests: April 15, 1998.
k. Status of Environmental Analysis: This application is not ready
for environmental analysis at this time; therefore, the Commission is
not now requesting comments, recommendations, terms and conditions, or
prescriptions--see attached paragraph D7.
l. Brief Description of Project: The proposed modified run-of-river
hydroelectric project would consist of: (1) A 20-foot-long, concrete
weir, diversion dam and intake at the outlet of Rich's Pond; (2) a
3,200-foot-long, 42-inch diameter, steel penstock, (3) a metal
powerhouse initially containing a 1,500 kilowatt (kW) horizontal
impulse turbine/generator for Phase 1; Phase II would add a second
3,500 kW turbine/generator, (4) about 500 feet of new access road, and
(5) a 10.9-mile-long, 34.5 kilovolt overhead transmission line.
m. This notice also consists of the following standard paragraphs:
A2, A-9, B1, and D7.
n. Available Locations of Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, Room 2A, 888 First Street, N.E., Washington, D.C. 20426
or by calling (202) 208-1659. A copy is also available
[[Page 8195]]
for inspection and reproduction by contacting Mr. Michael Stimac at HDR
Engineering, Inc. at (425) 453-1523 in Bellevue, Washington or Mr.
Charles Skultka, Sr., Haida Corporation, at (907) 966-2574 in Hydaburg,
Alaska.
A2. Development Application--Any qualified applicant desiring to
file a competing application must submit to the Commission, on or
before the specified deadline date for the particular application, a
competing development application, or a notice of intent to file such
an application. Submission of a timely notice of intent allows an
interested person to file the competing development application no
later than 120 days after the specified deadline date for the
particular application. Applications for preliminary permits will not
be accepted in response to this notice.
A9. Notice of intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
B1. Protests or Motions to Intervene--Anyone may submit a protest
or a motion to intervene in accordance with the requirements of Rules
of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
D7. Filing and Service of Responsive Documents--The application is
not ready for environmental analysis at this time; therefore, the
Commission is not now requesting comments, recommendations, terms and
conditions, or prescriptions.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. Any of these documents must be filed by providing the
original and the number of copies required by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, N.E., Washington, D.C. 20426. An additional copy must
be sent to Director, Division of Project Review, Office of Hydropower
Licensing, Federal Energy Regulatory Commission, at the above address.
A copy of any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application.
Lindwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-3947 Filed 2-19-98; 8:45 am]