99-3894. CNG Transmission Corporation; Notice of Amendment  

  • [Federal Register Volume 64, Number 32 (Thursday, February 18, 1999)]
    [Notices]
    [Page 8076]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-3894]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-96-001]
    
    
    CNG Transmission Corporation; Notice of Amendment
    
    February 11, 1999.
        Take notice that on February 9, 1999, CNG Transmission Corporation 
    (CNG), 445 West Main Street, Clarksburg, West Virginia 26301, filed in 
    Docket No. CP99-96-001 to amend its pending application filed on 
    December 2, 1998 in Docket No. CP99-96-000. This application is on file 
    with the Commission and available for public inspection. This filing 
    may be viewed on the web at http://www.ferc.fed.us/online/rims.htm 
    (please call (202) 208-0400 for assistance).
        CNG states that the purpose of the amendment is to revise the 
    facilities CNG proposed to construct and operate at its North Summit 
    Storage Field. Specifically, CNG is withdrawing its request for 
    authorization to convert Well UW-207 from an observation well to a 
    storage well and to construct approximately 3,554 feet of 8-inch 
    diameter pipeline with appurtenant facilities designated as Line No. 
    UP-25.
        Any person desiring to be heard or making any protest with 
    reference to said application should on or before March 4, 1999, file 
    with the Federal Energy Regulatory Commission, 888 First Street, N.E., 
    Washington, D.C. 20426, a motion to intervene or a protest in 
    accordance with the requirements of the Commission's Rules of Practice 
    and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the 
    NGA (18 CFR 157.10). All protests filed with the Commission will be 
    considered by it in determining the appropriate action to be taken but 
    will not serve to make the protestants parties to the proceeding. The 
    Commission's rules require that protestors provide copies of their 
    protests to the party or person to whom the protests are directed. Any 
    person wishing to become a party to a proceeding or to participate as a 
    party in any hearing therein must file a motion to intervene in 
    accordance with the Commission's Rules. Any person who filed to 
    intervene in Docket No. CP99-96-000 need not file again.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Commission by 
    sections 7 and 15 of the NGA and the Commission's Rules of Practice and 
    Procedure, a hearing will be held without further notice before the 
    Commission or its designee on this application if no motion to 
    intervene is filed within the time required herein, if the Commission 
    on its own review of the matter finds that a grant of the certificate 
    is required by the public convenience and necessity. If a motion for 
    leave to intervene is timely filed, or if the Commission on its own 
    motion believes that a formal hearing is required, further notice of 
    such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for CNG to appear or be represented at the 
    hearing.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 99-3894 Filed 2-17-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/18/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-3894
Pages:
8076-8076 (1 pages)
Docket Numbers:
Docket No. CP99-96-001
PDF File:
99-3894.pdf