[Federal Register Volume 64, Number 32 (Thursday, February 18, 1999)]
[Notices]
[Page 8076]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-3894]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-96-001]
CNG Transmission Corporation; Notice of Amendment
February 11, 1999.
Take notice that on February 9, 1999, CNG Transmission Corporation
(CNG), 445 West Main Street, Clarksburg, West Virginia 26301, filed in
Docket No. CP99-96-001 to amend its pending application filed on
December 2, 1998 in Docket No. CP99-96-000. This application is on file
with the Commission and available for public inspection. This filing
may be viewed on the web at http://www.ferc.fed.us/online/rims.htm
(please call (202) 208-0400 for assistance).
CNG states that the purpose of the amendment is to revise the
facilities CNG proposed to construct and operate at its North Summit
Storage Field. Specifically, CNG is withdrawing its request for
authorization to convert Well UW-207 from an observation well to a
storage well and to construct approximately 3,554 feet of 8-inch
diameter pipeline with appurtenant facilities designated as Line No.
UP-25.
Any person desiring to be heard or making any protest with
reference to said application should on or before March 4, 1999, file
with the Federal Energy Regulatory Commission, 888 First Street, N.E.,
Washington, D.C. 20426, a motion to intervene or a protest in
accordance with the requirements of the Commission's Rules of Practice
and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the
NGA (18 CFR 157.10). All protests filed with the Commission will be
considered by it in determining the appropriate action to be taken but
will not serve to make the protestants parties to the proceeding. The
Commission's rules require that protestors provide copies of their
protests to the party or person to whom the protests are directed. Any
person wishing to become a party to a proceeding or to participate as a
party in any hearing therein must file a motion to intervene in
accordance with the Commission's Rules. Any person who filed to
intervene in Docket No. CP99-96-000 need not file again.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Commission by
sections 7 and 15 of the NGA and the Commission's Rules of Practice and
Procedure, a hearing will be held without further notice before the
Commission or its designee on this application if no motion to
intervene is filed within the time required herein, if the Commission
on its own review of the matter finds that a grant of the certificate
is required by the public convenience and necessity. If a motion for
leave to intervene is timely filed, or if the Commission on its own
motion believes that a formal hearing is required, further notice of
such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for CNG to appear or be represented at the
hearing.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-3894 Filed 2-17-99; 8:45 am]
BILLING CODE 6717-01-M