99-3896. Columbia Gas Transmission Corporation; Notice of Application  

  • [Federal Register Volume 64, Number 32 (Thursday, February 18, 1999)]
    [Notices]
    [Pages 8076-8077]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-3896]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-189-000]
    
    
    Columbia Gas Transmission Corporation; Notice of Application
    
    February 11, 1999.
        Take notice that on February 2, 1999, Columbia Transmission 
    Corporation (Columbia), 12801 Fair Lakes Parkway, Fairfax, Virginia 
    22030-0146, filed in Docket No. CP99-189-000 an application pursuant to 
    Section 7(b) of the Natural Gas Act for permission and approval to 
    abandon in place approximately 0.65 mile of 6-inch pipeline located in 
    Franklin County, Pennsylvania, all as more fully set forth in the 
    application on file with the Commission and open to public inspection. 
    The application may be viewed on the web at www.ferc.fed.us. Call (202) 
    208-2222 for assistance.
        Specifically, Columbia proposes to abandon approximately 0.65 mile 
    of 6-inch transmission Line 138 and appurtenances located in Franklin 
    County, Pennsylvania. Columbia states that it was authorized to own and 
    operate the facilities proposed for abandonment in Docket No. CP71-132-
    000. Columbia states that the section of Line 138 for which abandonment 
    in place authority is requested is an uncoated, steel pipeline in need 
    of replacement due to its deteriorating condition. Columbia states that 
    there are no points of delivery from this section of Line 138.
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before March 4, 1999, file 
    with the Federal Energy Regulatory Commission, 888 First Street, N.E., 
    Washington, D.C. 20426, a motion to intervene or a protest in 
    accordance with the requirements of the Commission's Rules of Practice 
    and Procedure (18 CFR 385.214 or 385.2111 and the Regulations under the 
    Natural Gas act (18 CFR 157.10). All protests filed with the Commission 
    will be considered by it in determining the appropriate action to be 
    taken but will not serve to make protestants parties to the proceeding. 
    Any person wishing to become a party to a proceeding or to participate 
    as a party in any hearing therein must file a motion to intervene in 
    accordance with the Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas
    
    [[Page 8077]]
    
    Act and the Commission's Rules of Practice and Procedure, a hearing 
    will be held without further notice before the Commission or its 
    designee on this application if no motion to intervene is filed within 
    the time required herein, if the Commission on its own review of the 
    matter finds that permission and approval for the proposed abandonment 
    are required by the pubic convenience and necessity. If a motion for 
    leave to intervene is timely filed, or if the Commission on its own 
    motion believes that a formal hearing is required, further notice of 
    such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Columbia to appear or be represented at the 
    hearing.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 99-3896 Filed 2-17-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/18/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-3896
Pages:
8076-8077 (2 pages)
Docket Numbers:
Docket No. CP99-189-000
PDF File:
99-3896.pdf