2021-03273. New England Hydropower Company, LLC Albion Hydro, LLC; Notice of Transfer of Exemption  

  • Start Preamble

    1. On December 28, 2020, New England Hydropower Company, LLC, exemptee for the Albion Dam Hydroelectric Project No. 14633, filed a letter notifying the Commission that the project was transferred from New England Hydropower Company, LLC to Albion Hydro, LLC. The exemption from licensing was originally issued on September 24, 2020.[1] The project would be located on the Blackstone River, near the towns of Cumberland and Lincoln, Providence County, Rhode Island. The transfer of an exemption does not require Commission approval.

    2. Albion Hydro, LLC is now the exemptee of the Albion Dam Hydroelectric Project No. 14633. All correspondence must be forwarded to: Mr. Michael C. Kerr, CEO, Albion Hydro, LLC, 100 Cummings Center Drive, Suite 451 C, Beverly, MA 01915, Phone: (978) 360-2547, Email: Michael@nehydropower.com.

    Start Signature

    Dated: February 11, 2021.

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature End Preamble

    Footnotes

    1.  New England Hydropower Company, LLC, 172 FERC ¶ 62,167 (2020).

    Back to Citation

    [FR Doc. 2021-03273 Filed 2-17-21; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
02/18/2021
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2021-03273
Pages:
10059-10059 (1 pages)
Docket Numbers:
Project No. 14633-0033
PDF File:
2021-03273.pdf