97-3975. East Tennessee Natural Gas Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 33 (Wednesday, February 19, 1997)]
    [Notices]
    [Pages 7445-7446]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-3975]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP97-240-000]
    
    
    East Tennessee Natural Gas Company; Notice of Request Under 
    Blanket Authorization
    
    February 12, 1997.
        Take notice that on February 10, 1997, East Tennessee Natural Gas 
    Company (East Tennessee), P.O. Box 2511, Houston, Texas 77252, filed in 
    Docket No. CP97-240-000 a request pursuant to Secs. 157.205 and 157.212 
    of the Commission's Regulations under the Natural Gas Act (18 CFR 
    157.205, 157.212) for authorization to construct a new delivery point 
    to provide interruptible natural gas transportation service to the 
    Virginia Gas Distribution Company (Virginia Gas), a local distribution 
    company, under East Tennessee's blanket certificate issued in Docket 
    No. CP82-412-000 pursuant to Section 7 of the Natural Gas Act, all as
    
    [[Page 7446]]
    
    more fully set forth in the request that is on file with the Commission 
    and open to public inspection.
        East Tennessee proposes to establish a new delivery point on its 
    system at approximate Mile Post 3404-1+0.0 in Russell County, Virginia 
    for deliveries to Virginia Gas of up to 1,000 Dekatherms per day of 
    natural gas on an interruptible basis. East Tennessee states it will 
    install, own and maintain a 2-inch hot tap and electronic measurement 
    equipment. East Tennessee states that Virginia Gas will install, own, 
    operate and maintain approximately 40 feet of two-inch interconnect 
    piping and install, own and maintain the meter facilities. East 
    Tennessee also states that Virginia Gas will provide a meter site 
    adjacent to East Tennessee's existing pipeline right-of-way and will 
    reimburse East Tennessee for the cost of the project which is estimated 
    to be $28,800.
        East Tennessee states that the total quantities to be delivered to 
    Virginia Gas after the delivery point is constructed will not exceed 
    previously authorized quantities. East Tennessee also states, that the 
    installation of the proposed delivery point is not prohibited by East 
    Tennessee's tariff, and that East Tennessee has sufficient capacity to 
    accomplish deliveries at the proposed new point without detriment or 
    disadvantage to its other customers.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-3975 Filed 2-18-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/19/1997
Department:
Energy Department
Entry Type:
Notice
Document Number:
97-3975
Pages:
7445-7446 (2 pages)
Docket Numbers:
Docket No. CP97-240-000
PDF File:
97-3975.pdf