[Federal Register Volume 64, Number 33 (Friday, February 19, 1999)]
[Notices]
[Page 8396]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-4095]
-----------------------------------------------------------------------
DEPARTMENT OF HEALTH AND HUMAN SERVICES
Public Health Service
Centers for Disease Control and Prevention, Statement of
Organization, Functions, and Delegations of Authority
Part C (Centers for Disease Control and Prevention) of the
Statement of Organization, Functions, and Delegations of Authority of
the Department of Health and Human Services (45 FR 67772-76, dated
October 14, 1980, and corrected at 45 FR 69296, October 20, 1980, as
amended most recently at 64 FR 5308-5310, dated February 3, 1998) is
amended to reflect the (1) establishment of the Facilities Engineering
Office, the Facilities Planning and Project Management Office, and the
Design and Construction Management Office, and (2) the abolishment of
the Engineering Services Office within the Office of Program Support,
Centers for Disease Control and Prevention (CDC).
Section C-B, Organization and Functions, is hereby amended as
follows:
Delete in their entirety the title and functional statements for
the Engineering Services Office (CA52), Office of Program Support
(CA5), and insert the following:
Facilities Engineering Office CA52). (1) Operates, maintains,
repairs, and modifies CDC's Atlanta area plant facilities and other
designated CDC facilities throughout the United States and Puerto Rico
and conducts a maintenance and repair program for CDC's program support
equipment; (2) develops services for new, improved, and modified
equipment to meet program needs; (3) provides technical assistance,
reviews maintenance and operation programs, and recommends appropriate
action for all Atlanta area facilities and other designated CDC
facilities throughout the United States and Puerto Rico; (4) provides
recommendations, priorities, and services for new, improved, or
modified equipment to meet program needs; (5) provides maintenance and
operation of the central energy plant including structures, utilities
production and utilities distribution systems and equipment; (6)
conducts a program of custodial services, waste disposal,
incinerations, and disposal of biological waste and other building
services at all CDC Atlanta area facilities and other designated CDC
facilities throughout the United States and Puerto Rico; (7) provides
landscape development, repair, and maintenance at all CDC Atlanta area
facilities and other designated CDC facilities throughout the United
States and Puerto Rico; (8) provides hauling and moving services for
CDC in the Atlanta area; (9) provides insect and rodent control
services for CDC in Atlanta area facilities; (10) develops required
contractual services and provides supervision for work performed in
these areas; (11) establishes and maintains a computerized system for
maintenance services and for stocking and ordering supplies and
replacement parts; (12) provides for pick-up and delivery of supplies
and replacement parts to work sites; (13) maintains adequate stock
levels of supplies and replacement parts; (14) as needed, prepares
designs and contract specifications and coordinates completion of
contract maintenance projects; (15) manages CDC's Energy Conservation
Program for all CDC facilities; (16) reviews all construction documents
for energy conservation goals and compliance with applicable CDC
construction standards; (17) participates on all core teams and value
engineering teams; (18) provides maintenance and inspection for fire
extinguishers and fire sprinkler systems; (19) provides services for
the procurement of natural gas; (20) develops and maintains a standard
equipment list for all CDC facilities; (21) assists the Design and
Construction Management Office and the Facilities Planning and Project
Management Office with facility-related issues.
After the title and functional statement for the Information
Resources Management Office (CA54), insert the following:
Design and Construction Management Office (CA55). (1) Develops
architectural designs and engineering specifications for construction
of new facilities and major modifications and renovations to CDC-owned
facilities; (2) provides architectural and engineering technical
services and consultation on facility project designs; (3) provides in-
house construction administration services for CDC-owned facilities in
Atlanta; (4) manages interior design and furniture standards; (5)
coordinates development and determination of best methods and means for
the planning and conduct of assigned projects, including selection of
resources.
Facilities Planning and Project Management Office (CA56). (1)
Provides professional architectural/engineering capabilities and
technical and administrative project support to CDC and the CIOs for
renovations and improvements to CDC-owned facilities and construction
of new facilities; (2) prioritizes design and construction needs for
requested CIO projects; (3) manages and administers the CDC renovations
and improvement (R&I) budget; (4) develops project management
requirements (including determination of methods and means of project
completion and selection of resources), funding sources, and budgets;
(5) serves as the point of contact with CIOs for administration and
coordination of all facilities-related needs, i.e., project planning,
evaluation, estimation, and tracking.
Dated: February 9, 1999.
Jeffrey P. Koplan,
Director.
[FR Doc. 99-4095 Filed 2-18-99; 8:45 am]
BILLING CODE 4160-18-M