2010-3098. CenterPoint Energy Gas Transmission Company; Prior Notice of Activity Under Blanket Certificate  

  • Start Preamble February 3, 2010.

    On January 26, 2010 CenterPoint Energy Gas Transmission Company (CEGT) filed a prior notice request pursuant to sections 157.205, 157.208 and 157.210 of the Federal Energy Regulatory Commission's (Commission) regulations under the Natural Gas Act, and CEGT's certificate issued September 1, 1982, as amended February 10, 1983, in Docket Nos. CP82-384-000 and CP82-384-001. CEGT requests authorization to construct a new compressor station near the town of Alto in Richland Parish, Louisiana, all as more fully described in the application that is available for public inspection.

    Any questions regarding the application should be directed to Michelle Willis, Manager, Regulatory & Compliance, CenterPoint Energy Gas Transmission Company, P.O. Box 21734, Shreveport, Louisiana 71151, or by calling (318) 429-3708.

    Any person or the Commission's staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA.

    Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such motions or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant, on or before the comment date. It is not necessary to serve motions to intervene or protests on persons other than the Applicant.

    The Commission encourages electronic submission of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

    This filing is accessible on-line at http://www.ferc.gov,, using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2010-3098 Filed 2-18-10; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
02/19/2010
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2010-3098
Pages:
7474-7474 (1 pages)
Docket Numbers:
Docket No. CP10-47-000
EOCitation:
of 2010-02-03
PDF File:
2010-3098.pdf