E7-1615. Drawbridge Operation Regulation; Mississippi River, Dubuque, IA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Temporary final rule.

    SUMMARY:

    The Coast Guard is changing the drawbridge operations for the Illinois Central Railroad Drawbridge across the Upper Mississippi River at Mile 579.9, at Dubuque, Iowa. Under the rule, the drawbridge shall open on signal if at least 24 hours advance notice is given from 12:01 a.m., on February 2, 2007 until 8 a.m., on March 15, 2007. This rule allows time for making upgrades to critical mechanical components and perform scheduled annual maintenance/repairs to the bridge and pier protection.

    DATES:

    The rule is effective from 12:01 a.m., on February 2, 2007 until 8 a.m., on March 15, 2007.

    ADDRESSES:

    Comments and material received from the public, as well as documents indicated in this preamble as being available in the docket, are part of docket [CGD08-06-037] and are available for inspection or copying at room 2.107f in the Robert A. Young Federal Building at Eighth Coast Guard District, between 8 a.m. and 4 p.m., Monday through Friday, except Federal holidays. Commander (dwb), Eighth Coast Guard District, Bridge Branch maintains the public docket for this rulemaking.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Roger K. Wiebusch, Bridge Administrator, (314) 269-2378.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Regulatory Information

    Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective in less than 30 days after publication in the Federal Register. Winter conditions on the Upper Mississippi River coupled with the closure of Lock and Dam 11, Mile 583.0, Upper Mississippi River, at Dubuque, Iowa from January 2, 2007 until February 28, 2007 preclude any significant navigation demands for the drawspan opening thereby making a 30-day delay during that period unnecessary, and a delayed effective date would be contrary to the public interest in prompt completion of the bridge's repairs and maintenance work.

    On November 16, 2006, we published a notice of proposed rulemaking (NPRM) entitled Drawbridge Operation Regulation; Mississippi River, Iowa and Illinois in the Federal Register (71 FR 66711). We received no comment letters on the proposed rule. No public hearing was requested, and none was held.

    Background and Purpose

    On September 12, 2006, the Chicago, Central & Pacific Railroad requested a temporary change to the operation of the Illinois Central Railroad Drawbridge, across the Upper Mississippi River, Mile 579.9, at Dubuque, Iowa to open on signal if at least 24 hours advance notice is given to facilitate critical bridge repair and annual maintenance.

    The Illinois Central Railroad Drawbridge navigation span has a vertical clearance of 19.9 feet above normal pool in the closed to navigation position. Navigation on the waterway consists primarily of commercial tows and recreational watercraft and will not be significantly impacted due to the reduced navigation in winter months. Presently, the draw opens on signal for passage of river traffic. The Chicago, Central & Pacific Railroad requested the drawbridge be permitted to remain closed-to-navigation from 12:01 a.m., February 2, 2007 until 8 a.m., March 15, 2007 unless 24 hours advance notice is given of the need to open. The Illinois Central Railroad Drawbridge, Mile 579.9, Upper Mississippi River, is located just downstream from Lock and Dam 11. Performing maintenance on the bridge and pier protection during the winter, when the number of vessels likely to be impacted is minimal, is preferred to the bridge closure or advance notification requirements during the navigation season. This Start Printed Page 4962temporary change to the drawbridge's operation has been coordinated with the commercial waterway operators.

    Discussion of Comments and Changes

    The Coast Guard received no comment letters. No changes have been made to this temporary final rule.

    Regulatory Evaluation

    This rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not “significant” under the regulatory policies and procedures of the Department of Homeland Security (DHS).

    The Coast Guard expects this temporary change to the operation of the Illinois Central Railroad Drawbridge to have a minimal economic impact on commercial traffic operating on the Upper Mississippi River such that a full regulatory evaluation under the regulatory policies and procedures of DHS is unnecessary. This temporary change has been written in such a manner as to allow for minimal interruption of the drawbridge's regular operation, since the change is only in effect during the winter months while commercial traffic is greatly reduced.

    Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.

    The Coast Guard certifies under 5 U.S.C. 605(b) that this rule would not have a significant economic impact on a substantial number of small entities. The rule will have a negligible impact on vessel traffic. The primary users of the Upper Mississippi River in Dubuque, Iowa are commercial towboat operators. With the onset of winter conditions, most activity on the Upper Mississippi River is curtailed and there are few, if any, significant navigation demands for opening the drawspan. The Coast Guard expects the impact of this action to be minimal.

    Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we offered to assist small entities in understanding this rule so that they could better evaluate its effects on them and participate in the rulemaking. Small businesses may send comments on the actions of Federal employees who enforce or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-800-REG-FAIR (1-800-734-3247).

    Collection of Information

    This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

    Federalism

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.

    Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.

    Taking of Private Property

    This rule will not affect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that may disproportionately affect children.

    Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it would not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    Energy Effects

    We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.

    Technical Standards

    The National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use voluntary consensus standards in their regulatory activities unless the agency provides Congress, through the Office of Management and Budget, with an explanation of why using these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies.

    This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.Start Printed Page 4963

    Environment

    We have analyzed this rule under Commandant Instruction M16475.1D, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that there are no factors in this case that would limit the use of a categorical exclusion under section 2.B.2 of the Instruction. Therefore this rule is categorically excluded under figure 2-1, paragraph 32(e) of the Instruction from further environmental documentation. Paragraph 32(e) excludes the promulgation of operating regulations or procedures for drawbridges from the environmental documentation requirements of the National Environmental Policy Act (NEPA). Since this regulation would alter the normal operating conditions of the drawbridge, it falls within this exclusion. A “Categorical Exclusion Determination” is available in the docket for inspection or copying where indicated under ADDRESSES.

    Start List of Subjects

    List of Subjects in 33 CFR Part 117

    • Bridges
    End List of Subjects Start Amendment Part

    For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 117 as follows:

    End Amendment Part Start Part

    PART 117—DRAWBRIDGE OPERATION REGULATIONS

    End Part Start Amendment Part

    1. The authority citation for part 117 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 33 U.S.C. 499; Department of Homeland Security Delegation No. 0170.1; 33 CFR 1.05-1(g); section 117.255 also issued under the authority of Pub. L. 102-587, 106 Stat. 5039.

    End Authority Start Amendment Part

    2. From 12:01 a.m., February 2, 2007 until 8 a.m., March 15, 2007 in § 117.671 add new paragraph (c) to read as follows:

    End Amendment Part
    Upper Mississippi River.
    * * * * *

    (c) The Illinois Central Railroad Drawbridge, Mile 579.9, Upper Mississippi River at Dubuque, Iowa shall open on signal if at least 24 hours notice is given.

    Start Signature

    Dated: January 22, 2007.

    J.R. Whitehead,

    Rear Admiral, U.S. Coast Guard Commander, Eighth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. E7-1615 Filed 2-1-07; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
2/2/2007
Published:
02/02/2007
Department:
Coast Guard
Entry Type:
Rule
Action:
Temporary final rule.
Document Number:
E7-1615
Dates:
The rule is effective from 12:01 a.m., on February 2, 2007 until 8 a.m., on March 15, 2007.
Pages:
4961-4963 (3 pages)
Docket Numbers:
CGD08-06-037
RINs:
1625-AA09: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
Topics:
Bridges
PDF File:
e7-1615.pdf
CFR: (1)
33 CFR 117.671