2011-2044. Defense Federal Acquisition Regulation Supplement; Reporting of Government Property Lost, Stolen, Damaged, or Destroyed
-
Start Preamble
AGENCY:
Defense Acquisition Regulations System; Department of Defense (DoD).
ACTION:
Final rule.
SUMMARY:
DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to require contractors to report loss of Government property to the Defense Contract Management Agency (DCMA) eTools application.
DATES:
Effective Date: February 2, 2011.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ms. Clare Zebrowski, 703-602-0289.
End Further Info End Preamble Start Supplemental Information Start Printed Page 6007SUPPLEMENTARY INFORMATION:
I. Background
This final rule provides a clause at DFARS 252.245-7002, Reporting Loss of Government Property, that requires DoD contractors to report the loss, theft, damage, and destruction of Government property to the DCMA eTools application. The final rule changes—
- DFARS 245.102(4), Policy, to make editorial changes to remove subparagraphs that unnecessarily duplicate language contained in the clause at 252.245-7002, Reporting Loss of Government Property. This paragraph has been redesignated as 245.102(5).
- DFARS 245.107(2), Contract clauses, to correct the prescription for use of the clause at 252.245-7002, Reporting Loss of Government Property, by removing the reference to FAR 52.245-2, Government Property Installation Operation Services. This paragraph has been redesignated as 245.107(c).
- Clause 252.245-7002, Reporting Loss of Government Property, to—
○ Revise the clause title;
○ Change the defined term “acquisition cost” to “unit acquisition cost” and expand the definition to include contractor-acquired property;
○ Revise the definition for “Government property” to state that the term is defined in the clause at FAR 52.245-1, Government Property;
○ Add a new definition for “loss of Government property”;
○ Revise the paragraph (b) title and (b)(1) to accommodate the new definition of “Loss of Government property”.
○ Revise paragraph (b)(1) to add the word “unit” to reflect that reporting value shall be at “unit acquisition cost,” and to provide an updated Web page for accessing the eTools application;
- Revise paragraph (b)(3) to make editorial and format changes;
- Revise paragraph (b)(4) to make editorial changes and to delete reference to two specific property clauses and instead state that the reporting requirements do not change any other liability or other reporting requirement that may exist under the contract.
II. Discussion and Analysis
Three respondents submitted four comments on the proposed rule, which was published at 75 FR 22729 on April 30, 2010. Comments were due June 29, 2010. A discussion of the comments received follows:
A. Clause Prescription
Comment: One respondent recommended revising paragraph 245.107(2) to remove the reference to FAR 52.245-2, Government Property Installation Operation Services, as the loss of property reporting requirement stems directly from FAR 52.245-1 and not from 52.245-2.
DoD Response: DoD has revised the language accordingly.
B. Definition of “Government Property”
Comment: One respondent recommended that the definition of “Government property” in the proposed clause should make clear that it includes all property acquired by the contractor through indirect cost accounts.
DoD Response: The recommendation is outside the scope of the rule. The rule does not seek to alter or modify the definition of Government property as prescribed in the Federal Acquisition Regulations (FAR 52.245-1). However, in order to clarify the Government property definition, DoD has replaced the definition of “Government property” in the clause with a reference to the definition of “Government property” in FAR 52.245-1.
C. Use of Term “Losses”
Comment: One respondent recommended modifying the clause language in paragraph (b) to replace the term “lost, stolen, damaged, or destroyed” with “losses” to maintain simplicity and consistency.
DoD Response: A new definition for “loss of Government property” has been added to the clause at 252.245-7002, Reporting Loss of Government Property.
D. Definition of “Estimated Harm”/“Acquisition Cost”
Comment: One respondent recommended adding a new definition of “estimated harm” to the proposed clause at 252.245-70XX and stated that estimated harm should consider other factors such as residual value, replacement cost, and care and handling cost. The respondent stated that the estimated harm should be expressed as a numeric value, and that providing only the acquisition cost without providing estimated harm to the Government is misleading and may result in poor decisions. According to the respondent, industry experience has proven that there typically is minimal or no harm to the Government and, even though the Government is self insured, replacement of lost items rarely occurs.
Similarly, a respondent stated the need to address the materiality of the loss and that without this information, decision makers may be misled and losses may be overstated. Further, according to the respondent, the rule should then explain how to compensate the Government for losses when the “indirect costs used to buy the property” have been partially allocated to Government contracts and partially allocated to commercial work or firm-fixed-price contracts.
DoD Response: These recommendations are outside the scope of the rule. The clause seeks only to require the electronic reporting of data pertaining to Government property losses. It does not require reporting of the estimated harm or materiality of such losses to the Government.
However, in order to clarify the reporting value, the clause definition of “acquisition cost” has been revised to a definition of “unit acquisition cost.” The new definition clarifies that for Government-furnished property, the unit acquisition cost is the dollar value assigned by the Government and identified in the contract; and adds the method for determining the reporting value for contractor-acquired property. The revised definition is more comprehensive and clarifies the property values to be reported.
The final rule also revises paragraph (b)(4) of the clause to remove the references to 52.245-1 and 52.245-2, since the contract may contain other liability or other reporting requirements. This change clarifies that the new clause does not impact any other contractual reporting or liability requirements.
III. Executive Order 12866
This rule was not subject to Office of Management and Budget review under Executive Order 12866, dated September 30, 1993. This rule is not a major rule under 5 U.S.C. 804.
IV. Regulatory Flexibility Act
DoD has prepared a final regulatory flexibility analysis consistent with 5 U.S.C. 604. A copy of the analysis may be obtained from the individual specified herein. The analysis is summarized as follows:
The objective of this rule is to provide DoD with a single repository for reporting loss of Government property to improve accountability and control of DoD assets and contractor oversight.
None of the comments from the three respondents was in response to the initial regulatory flexibility analysis. Therefore, there is no change to the rule in this regard.
The rule applies to DoD contractors provided with Government property. The clause at 252.245-7002, Reporting Loss of Government Property, requires the contractor to use the Defense Contract Management Agency eTools software application for reporting loss of Start Printed Page 6008Government property. The eTools software can be accessed from the DCMA homepage External Web Access Management application at http://www.dcma.mil/aboutetools.cfm.
Unless otherwise provided for in the contract, these requirements do not apply to normal and reasonable inventory adjustments, i.e., losses of low-risk consumable material such as common hardware, as agreed to by the contractor and the Government property administrator. Such losses are typically a product of normal process variation. The contractor shall ensure that its property management system provides adequate management control measures, e.g., statistical process controls, as a means of managing such variation.
Reporting requirements apply to losses of Government property outside normal process variation, e.g., because of—
(1) Theft;
(2) Inadequate storage;
(3) Inadequate security; or
(4) “Acts of God.”
This rule is not expected to have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act, 5 U.S.C. 601, et seq., because any start-up costs that contractors will incur to comply with the rule are expected to be minimal. The rule is expected to have a positive or beneficial impact on small entities by making available a Government-provided software application to use for reporting purposes. The rule does not duplicate, overlap, or conflict with any other Federal rules.
V. Paperwork Reduction Act
This final rule does not significantly increase the information collection requirements set forth under FAR 52.245-1(f)(vi), approved by the Office of Management and Budget under OMB clearance number 9000-0075. The rule will have a minimal impact on contractors, as such reporting is already common practice and is on an exception basis, i.e., only when reportable property is lost. There were no comments received on the proposed rule concerning information collection.
Start List of SubjectsList of Subjects in 48 CFR Parts 245 and 252
- Government procurement
Ynette R. Shelkin,
Editor, Defense Acquisition Regulations System.
Therefore, 48 CFR parts 245 and 252 are amended as follows:
Start Amendment Part1. The authority citation for 48 CFR parts 245 and 252 continues to read as follows:
End Amendment Part Start PartPART 245—GOVERNMENT PROPERTY
Policy.2. Section 245.102 is amended by adding paragraph (5) to read as follows:
End Amendment Part* * * * *(5) Reporting loss of Government property. The Defense Contract Management Agency (DCMA) eTools software application is the DoD data repository for reporting loss of Government property in the possession of contractors. The requirements and procedures for reporting loss of Government property to eTools are set forth in the clause at 252.245-7002, Reporting Loss of Government Property, prescribed at 245.107.
Start Amendment Part3. Section 245.107 is amended by adding paragraph (c) to read as follows:
End Amendment PartContract clauses.* * * * *(c) Use the clause at 252.245-7002, Reporting Loss of Government Property, in solicitations and contracts that contain the clause at FAR 52.245-1, Government Property.
PART 252—SOLICITATION PROVISIONS AND CONTRACT CLAUSES
End Part Start Amendment Part4. Add section 252.245-7002 to read as follows:
End Amendment PartReporting Loss of Government Property.As prescribed in 245.107(c), use the following clause:
REPORTING LOSS OF GOVERNMENT PROPERTY (FEB 2011)
(a) Definitions. As used in this clause—
Government property is defined in the clause at FAR 52.245-1, Government Property.
Loss of Government property means unintended, unforeseen, or accidental loss, damage, or destruction of Government property that reduces the Government's expected economic benefits of the property. Loss of Government property does not include purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to—
(1) Items that cannot be found after a reasonable search;
(2) Theft;
(3) Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or
(4) Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.
Unit acquisition cost means—
(1) For Government-furnished property, the dollar value assigned by the Government and identified in the contract; and
(2) For Contractor-acquired property, the cost derived from the Contractor's records that reflect consistently applied, generally acceptable accounting principles.
(b) Reporting loss of Government property. (1) The Contractor shall use the Defense Contract Management Agency (DCMA) eTools software application for reporting loss of Government property. Reporting value shall be at unit acquisition cost. The eTools “LTDD of Government Property” toolset can be accessed from the DCMA home page External Web Access Management application at http://www.dcma.mil/aboutetools.cfm.
(2) Unless otherwise provided for in this contract, the requirements of paragraph (b)(1) of this clause do not apply to normal and reasonable inventory adjustments, i.e., losses of low-risk consumable material such as common hardware, as agreed to by the Contractor and the Government Property Administrator. Such losses are typically a product of normal process variation. The Contractor shall ensure that its property management system provides adequate management control measures, e.g., statistical process controls, as a means of managing such variation.
(3) The Contractor shall report losses of Government property outside normal process variation, e.g., losses due to—
(i) Theft;
(ii) Inadequate storage;
(iii) Lack of physical security; or
(iv) “Acts of God.”
(4) This reporting requirement does not change any liability provisions or other reporting requirements that may exist under this contract.
(End of clause)
[FR Doc. 2011-2044 Filed 2-1-11; 8:45 am]
BILLING CODE 5001-08-P
Document Information
- Published:
- 02/02/2011
- Department:
- Defense Acquisition Regulations System
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2011-2044
- Pages:
- 6006-6008 (3 pages)
- Docket Numbers:
- DFARS Case 2008-D049
- RINs:
- 0750-AG64: Reporting of Government Property Lost, Stolen, Damaged, or Destroyed (DFARS Case 2008-D049)
- RIN Links:
- https://www.federalregister.gov/regulations/0750-AG64/reporting-of-government-property-lost-stolen-damaged-or-destroyed-dfars-case-2008-d049-
- Topics:
- Government procurement
- PDF File:
- 2011-2044.pdf
- CFR: (3)
- 48 CFR 245.102
- 48 CFR 245.107
- 48 CFR 252.245-7002