NUCLEAR REGULATORY COMMISSION
[Docket Nos. STN 50-454, STN 50-455, STN 50-456 and STN 50-457]
Commonwealth Edison Company; Notice of Consideration of Issuance
of Amendments to Facility Operating Licenses, Proposed no Significant
Hazards Consideration Determination, and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of amendments to Facility Operating License Nos.
NPF-37, NPF-66, NPF-72, and NPF-77 issued to Commonwealth Edison for
operation of the Byron Station, Units 1 and 2, located in Ogle County,
Illinois and Braidwood Station, Units 1 and 2, located in Will County,
Illinois.
The proposed amendments would relocate certain cycle-specific
parameter limits from the Technical Specifications to the Operating
Limits Report (ORL).
Before issuance of the proposed license amendments, the Commission
will have made findings as required by the Atomic Energy Act of 1954,
as amended (the Act) and the Commission's regulations.
The Commission has made a proposed determination that the
amendments requested involve no significant hazards consideration.
Under the Commission's regulations in 10 CFR 50.92, this means that
operation of the facility in accordance with the proposed amendments
would not (1) involve a significant increase in the probability or
consequences of an accident previously evaluated; or (2) create the
possibility of a new or different kind of accident from any accident
previously evaluated; or (3) involve a significant reduction in a
margin of safety. As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. The proposed Technical Specification changes do not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
The relocation of the cycle-specific core operating limits from
the Technical Specifications has no influence or impact on the
probability or consequences of any accident previously evaluated.
The Technical Specifications will continue to require operation
within the analyzed core operating limits and the appropriate
actions will be taken if the limits are exceeded. The cycle specific
limits within the OLR will be implemented and controlled by plant
procedures. Any needed revisions of the limit values in the OLR will
be performed based on NRC approved methodology as delineated in TS
6.9.1.9. Each accident analysis addressed in the Byron and Braidwood
Updated Final Safety Analysis Report (UFSAR) will be examined with
respect to changes in cycle dependent parameters. These parameters
are obtained from the application of NRC approved reload design
methodologies, to ensure that the transient evaluation of new
reloads are bounded by previously accepted analysis. This
examination, which will be performed under the requirements of 10
CFR 50.59 process, ensures that future reloads will not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
Therefore, the proposed changes do not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. The proposed changes do not create the possibility of a new
or different kind of accident from any accident previously
evaluated.
The relocation of the cycle specific variables has no influence
or impact, nor does it contribute in any way to the probability or
consequences of any new or different kind of accident. No safety
related equipment, safety function or plant operations will be
altered as a result of this proposed change. The cycle specific
variables are calculated using NRC approved methods and submitted to
the NRC for their review to allow the Staff to continue to trend the
values of these limits. The Technical Specifications will continue
to require operation within the analyzed core operating limits and
appropriate actions will be taken, when, or if, the limits are
exceeded.
Therefore, the proposed changes do not in any way create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. The proposed change does not involve a significant reduction
in a margin of safety for the following reasons:
The margin of safety is not affected by the relocation of cycle
specific core operating limits from the Technical Specifications.
The margin of safety presently provided by current Technical
Specifications remains unchanged. Appropriate measures exist to
control the values of these cycle specific limits. The proposed
amendment continues to require operation within the core limits as
obtained from the NRC approved reload design and safety analysis
methodologies. Appropriate actions are required to be taken, when,
or if, these limits are exceeded.
The development of the limits for future reloads will continue
to conform to those methods described in the NRC approved
documentation. In addition, each future reload will involve a 10 CFR
50.59 safety review to assure that operation of the Byron and
Braidwood units within the cycle specific limits will not involve a
reduction in
[[Page 7805]]
the margin of safety as defined in the basis for any Technical
Specification.
Therefore, the proposed changes do not impact operation of the
plant in a manner that involves a significant reduction in the
margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendments requested involve no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendments until the
expiration of the 30-day notice period. However, should circumstances
change during the notice period such that failure to act in a timely
way would result, for example, in derating or shutdown of the facility,
the Commission may issue the license amendments before the expiration
of the 30-day notice period, provided that its final determination is
that the amendments involve no significant hazards consideration. The
final determination will consider all public and State comments
received. Should the Commission take this action, it will publish in
the Federal Register a notice of issuance and provide for opportunity
for a hearing after issuance. The Commission expects that the need to
take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rules
Review and Directives Branch, Division of Freedom of Information and
Publications Services, Office of Administration, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, and should cite the
publication date and page number of this Federal Register notice.
Written comments may also be delivered to Room 6D22, Two White Flint
North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to
4:15 p.m. Federal workdays. Copies of written comments received may be
examined at the NRC Public Document Room, the Gelman Building, 2120 L
Street, NW., Washington, DC.
The filing of requests for hearing and petitions for leave to
intervene is discussed below.
By March 24, 1997, the licensee may file a request for a hearing
with respect to issuance of the amendments to the subject facility
operating licenses and any person whose interest may be affected by
this proceeding and who wishes to participate as a party in the
proceeding must file a written request for a hearing and a petition for
leave to intervene. Requests for a hearing and a petition for leave to
intervene shall be filed in accordance with the Commission's ``Rules of
Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2.
Interested persons should consult a current copy of 10 CFR 2.714 which
is available at the Commission's Public Document Room, the Gelman
Building, 2120 L Street, NW., Washington, DC, and at the local public
document room located at: for Byron, the Byron Public Library District,
109 N. Franklin, P.O. Box 434, Byron, Illinois 61010; for Braidwood,
the Wilmington Public Library, 201 S. Kankakee Street, Wilmington,
Illinois 60481. If a request for a hearing or petition for leave to
intervene is filed by the above date, the Commission or an Atomic
Safety and Licensing Board, designated by the Commission or by the
Chairman of the Atomic Safety and Licensing Board Panel, will rule on
the request and/or petition; and the Secretary or the designated Atomic
Safety and Licensing Board will issue a notice of hearing or an
appropriate order.
As required by 10 CFR 2.714, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following factors: (1) the nature of the petitioner's right under the
Act to be made party to the proceeding; (2) the nature and extent of
the petitioner's property, financial, or other interest in the
proceeding; and (3) the possible effect of any order which may be
entered in the proceeding on the petitioner's interest. The petition
should also identify the specific aspect(s) of the subject matter of
the proceeding as to which petitioner wishes to intervene. Any person
who has filed a petition for leave to intervene or who has been
admitted as a party may amend the petition without requesting leave of
the Board up to 15 days prior to the first prehearing conference
scheduled in the proceeding, but such an amended petition must satisfy
the specificity requirements described above.
Not later than 15 days prior to the first prehearing conference
scheduled in the proceeding, a petitioner shall file a supplement to
the petition to intervene which must include a list of the contentions
which are sought to be litigated in the matter. Each contention must
consist of a specific statement of the issue of law or fact to be
raised or controverted. In addition, the petitioner shall provide a
brief explanation of the bases of the contention and a concise
statement of the alleged facts or expert opinion which support the
contention and on which the petitioner intends to rely in proving the
contention at the hearing. The petitioner must also provide references
to those specific sources and documents of which the petitioner is
aware and on which the petitioner intends to rely to establish those
facts or expert opinion. Petitioner must provide sufficient information
to show that a genuine dispute exists with the applicant on a material
issue of law or fact. Contentions shall be limited to matters within
the scope of the amendments under consideration. The contention must be
one which, if proven, would entitle the petitioner to relief. A
petitioner who fails to file such a supplement which satisfies these
requirements with respect to at least one contention will not be
permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing, including the opportunity to present evidence and cross-
examine witnesses.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held.
If the final determination is that the amendments requested involve
no significant hazards consideration, the Commission may issue the
amendments and make them immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendments.
If the final determination is that the amendments requested involve
a significant hazards consideration, any hearing held would take place
before the issuance of any amendments.
A request for a hearing or a petition for leave to intervene must
be filed with the Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Docketing and
Services Branch, or may be delivered to the Commission's Public
Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC,
by the above date. Where petitions are filed during the last 10 days of
the notice period, it is requested that the petitioner promptly so
inform the Commission by
[[Page 7806]]
a toll-free telephone call to Western Union at 1-(800) 248-5100 (in
Missouri 1-(800) 342-6700). The Western Union operator should be given
Datagram Identification Number N1023 and the following message
addressed to Robert A. Capra: petitioner's name and telephone number,
date petition was mailed, plant name, and publication date and page
number of this Federal Register notice. A copy of the petition should
also be sent to the Office of the General Counsel, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, and to Michael I.
Miller, Esquire; Sidley and Austin, One First National Plaza, Chicago,
Illinois 60603, attorney for the licensee.
Nontimely filings of petitions for leave to intervene, amended
petitions, supplemental petitions and/or requests for hearing will not
be entertained absent a determination by the Commission, the presiding
officer or the presiding Atomic Safety and Licensing Board that the
petition and/or request should be granted based upon a balancing of the
factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).
For further details with respect to this action, see the
application for amendments dated December 21, 1995, as supplemented on
October 24, 1996, which are available for public inspection at the
Commission's Public Document Room, the Gelman Building, 2120 L Street,
NW., Washington, DC, and at the local public document rooms located at:
for Byron, the Byron Public Library District, 109 N. Franklin, P.O. Box
434, Byron, Illinois 61010; for Braidwood, the Wilmington Public
Library, 201 S. Kankakee Street, Wilmington, Illinois 60481.
Dated at Rockville, Maryland, this 13th day of February 1997.
For the Nuclear Regulatory Commission.
George F. Dick, Jr.,
Project Manager, Project Directorate III-2, Division of Reactor
Projects--III/IV Office of Nuclear Reactor Regulation.