98-4269. Iroquois Gas Transmission System L.P.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 34 (Friday, February 20, 1998)]
    [Notices]
    [Pages 8628-8629]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-4269]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-221-000]
    
    
    Iroquois Gas Transmission System L.P.; Notice of Request Under 
    Blanket Authorization
    
    February 13, 1998.
        Take notice that on February 6, 1998, Iroquois Gas Transmission 
    System, L.P. (Iroquois), One Corporate Drive, Suite 600, Shelton, 
    Connecticut 06484, filed in Docket No. CP98-221-000 a request pursuant 
    to Sections 157.205 and 157.211 of the Commission's Regulations under 
    the Natural Gas Act (18 CFR 157.205, 157.211) for authorization to 
    construct and operate a third meter run at its existing Northport Meter 
    Station, located in Suffolk County, New York, to permit additional 
    capability to serve Long Island Lighting Company (LILCO), under 
    Iroquois' blanket certificate issued in Docket No. CP89-634-000, 
    pursuant to Section 7(c) of the Natural Gas Act, all as more fully set 
    forth in the request that is on file with the Commission and open to 
    public inspection.
        Iroquois proposes to construct and operate a third meter run at 
    Iroquois; Northport Meter Station, located in Suffolk County, New York, 
    to provide additional capacity to serve LILCO at that delivery point. 
    LILCO proposes the conversion of an existing 380 MW generating unit at 
    its Northport Power Station to provide it with dual fuel capability and 
    the addition of a third meter run would provide additional capacity at 
    the meter station to meet LILCO's planned requirements. Iroquois 
    declares the third meter run would increase the delivery capability at 
    the Northport Meter Station from approximately 213 MMcf to 
    approximately 312 MMcf per day.
        Iroquois states the estimated cost of the third meter run is 
    $190,000, which will be recovered through the provision of additional 
    deliveries to LILCO.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn 30
    
    [[Page 8629]]
    
    days after the time allowed for filing a protest, the instant request 
    shall be treated as an application for authorization pursuant to 
    Section 7 of the Natural Gas Act.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-4269 Filed 2-19-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/20/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-4269
Pages:
8628-8629 (2 pages)
Docket Numbers:
Docket No. CP98-221-000
PDF File:
98-4269.pdf