97-4352. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 62, Number 35 (Friday, February 21, 1997)]
    [Notices]
    [Pages 8013-8014]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-4352]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-5477-7]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared February 3, 1997 Through 
    February 7, 1997 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 564-7167. An explanation of the ratings assigned to draft 
    environmental impact statements (EISs) was published in FR dated April 
    5, 1996 (61 FR 15251).
    
    Draft EISs
    
        ERP No. D-AFS-J65060-UT Rating EC2, Alta Ski Area Master 
    Development Plan Update Approval, Special-Use-Permit and COE Permits 
    Issuance, Wasatch-Cache National Forest, Salt Lake Ranger District, 
    Salt Lake County, UT.
        Summary: EPA expressed environmental concerns about impacts to 
    wetlands and air quality impacts.
        ERP No. D-AFS-J65258-MT Rating EC2, Lewis and Clark National Forest 
    Plan, Implementation, Oil and Gas Leasing Analysis, Upper Missouri 
    River Basin, several counties, MT.
        Summary: EPA expressed environmental concerns about potential 
    cumulative impacts from directional drilling and associated oil and gas 
    exploration and development activities. The final EIS should address 
    wetland protection, specific air and water quality monitoring and 
    validation plans.
        ERP No. D-AFS-J65259-CO Rating EC2, Aspen Highlands Ski Area 
    Expansion, Master Development Plan Amendment, COE 404 Permit and 
    Special-Use-Permit, White River National Forest, Aspen Ranger District, 
    Pitkin County, CO.
        Summary: EPA expressed environmental concerns about inadequate 
    modeling and analysis to determine air quality impacts.
        ERP No. D-AFS-K65192-CA Rating EC2, Jaybird Multi-Resource Project, 
    Implementation, Downieville Ranger District, Yuba County, CA.
        Summary: EPA expressed environmental concerns that the proposed 
    management activities are not directly integrated into the overall 
    watershed management plan. The final EIS should clearly define roles 
    and responsibilities for monitoring activities.
        ERP No. D-AFS-L65265-WA Rating LO, North Sherman and Fritz Timber 
    Sales, Implementation, Colville National Forest, Kettle Falls Ranger 
    District, Ferry County, WA.
        Summary: EPA expressed lack of objections. No formal comment letter 
    was sent to the preparing agency.
        ERP No. D-AFS-L65280-ID Rating EC2, Mosquito-Fly Project Area, 
    Implementation, Harvest Timber, Road Construction and Grant Access to 
    Private Land, Idaho Panhandle National Forests, St. Joe Ranger 
    District, Shoshone County, ID.
        Summary: EPA expressed environmental concerns about the retention 
    of roadless area characteristics, water quality, and cumulative/
    indirect impacts.
        ERP No. D-AFS-L67035-OR Rating EO2, Stewart Mining Operation, Plan 
    of Operation Approval, Implementation, City Creek, North Umpqua Ranger 
    District, Umpqua National Forest, Douglas and Lane Counties, OR.
        Summary: EPA expressed environmental objections about compliance 
    with Aquatic Conservation Strategy Objectives provided in the Northwest 
    Forest Plan Record of Decision, and about impacts to the Outstandingly 
    Remarkable Values recognized in the North Umpqua River and Streamboat 
    Creek, from sedimentation and acid rock drainage.
        ERP No. D-BLM-J65191-00 Rating EC2, Standards for Rangeland Health 
    and Guidelines for Livestock Grazing Management on Bureau of Land 
    Management Administered Lands, Implementation, MT, ND and SD.
        Summary: EPA expressed environmental concerns that the Standards 
    and Guidelines may not adequately protect the chemical, physical and 
    biological integrity of water quality to meet the Clean Water Act. 
    There was confusion concerning what CWA Section 303 water quality 
    standards (WQS) mean and how the States implement WQS. Consistency, 
    additional information and environmental commitments were requested in 
    the final EIS. The final EIS should include specifics of the mitigation 
    plans.
        ERP No. D-BLM-K67039-NV Rating LO, Denton-Rawhide Mine Expansion 
    Project, Plan of Operation Approval, Implementation, Mineral County, 
    NV.
        Summary: EPA expressed a lack of objection.
        ERP No. D-BLM-L65272-ID Rating EC2, Challis Land and Resource 
    Management Plan, Implementation, Upper Columbus--Salmon Clearwater 
    Districts, Salmon River, Lemhi and Custer Counties, ID.
        Summary: EPA expressed environmental concerns on water quality 
    impacts from grazing activities. EPA suggests that the final EIS 
    include specifics on mitigation plans, including implementation to 
    improve degraded riparian areas.
        ERP No. D-COE-L36104-WA Rating LO, Howard A. Hanson Dam Continued 
    Operation and Maintenance Plan, Implementation, Green River, King 
    County, WA.
        Summary: Our abbreviated review has revealed no EPA concerns on 
    this project.
        ERP No. D-IBR-K31018-AZ Rating EO2, Programmatic EIS--Pima-Maricopa 
    Irrigation Project, Construction and Operation, Maricopa and Pinal 
    Counties, AZ.
        Summary: EPA had environmental objection with the large scope of 
    the proposed action and its long-term sustainability. The PDEIS did not 
    persuasively demonstrate that potential adverse environmental impacts 
    can be avoided, minimized, or mitigated. EPA recommended prioritization 
    of project components for implementation with primary emphasis on 
    rehabilitation of existing irrigation systems and agricultural areas. 
    EPA also strongly advocated monitoring and adaptive management and 
    urged full integration of the local comprehensive water management 
    plan. EPA expressed concern with potential adverse impacts to surface 
    and groundwater quality, riparian areas, air quality, fish and
    
    [[Page 8014]]
    
    wildlife habitat, and public health and safety.
        ERP No. D-STA-G50009-00 Rating LO, Programmatic EIS--International 
    Bridge Crossing Project, Construction and Operation, Along the United 
    States-Mexico Border from EL Paso to Brownsville, TX, Presidential 
    Permit, NM and TX.
        Summary: EPA had no objection to the proposed action.
        ERP No. D-UMC-K24018-CA Rating EC2, Sewage Effluent Compliance 
    Project, Implementation, Lower Santa Margarita Basin, Marine Corps Base 
    Camp Pendleton, San Diego County, CA.
        Summary: EPA expressed environmental concerns with the alternative 
    analysis and requested clarification of wetland issues.
        ERP No. DA-DOE-A22076-NM Rating LO, Waste Isolation Pilot Plant 
    Disposal Phase, Updated Information, Disposal of Transuranic Waste, 
    Carlsbad, NM.
        Summary: EPA expressed lack of objections to the preferred 
    alternative.
    
    Final EISs
    
        ERP No. F-AFS-J60017-CO Fraser Valley Loop Transmission Line 
    Project, Construction, Operation, Associated Operations and Maintenance 
    Activities, Approval of Permits, Arapaho and Roosevelt National 
    Forests, Grand County, CO.
        Summary: EPA continued to express environmental concerns that many 
    of the potential impacts to wetlands, old growth, and raptor nests will 
    not be known until a biological survey of the area is done. EPA also 
    expressed environmental concern over possible conflicts that may still 
    exist between this EIS and draft land management plans.
        ERP No. F-AFS-J65242-MT Checkerboard Land Exchange, Plan of 
    Approval and Implementation, Kootenai, Lolo and Flathead National 
    Forests, Lincoln, Flathead and Sanders Counties, MT.
        Summary: EPA expressed environmental concerns about potential 
    adverse water quality and fisheries impacts that could occur on lands 
    exchanged to the Plum Creek Timber Company (PCTC) due to high intensity 
    timber harvesting and road building activities by PCTC on these lands.
        ERP No. F-AFS-K65189-CA, Cavanah Multi-Resource Management Project, 
    Implementation, Enhancing Forest Health and Productivity, Tahoe 
    National Forest, Foresthill Ranger District, Placer County, CA.
        Summary: EPA expressed environmental concerns that the number of 
    proposed road obliterations will not be adequate to improve water 
    quality.
        ERP No. F-BLM-K67037-NV, Twin Creeks Mine Consolidation and 
    Expansion, which Encompasses the former Rabbit Creek Mine and the 
    former Chimmey Creek Mine, Plan of Operation Approval and Permit 
    Issuance, Winnemucca District, Humboldt County, NV.
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. F-COE-G39029-LA, Programmatic EIS--Marsh Management 
    Project, Hydrologic Manipulation, COE Section 10 and 404 Permit 
    Issuance, Coastal Wetland of Louisiana a part of the Coastal Wetlands 
    Planning, Protection and Restoration Act (CWPPRA) River Basins, LA.
        Summary: EPA recommended that the Record of Decision identify the 
    future directions or activities that can be implemented by the COE to 
    address hydrologic manipulation issues in coastal Louisiana.
        ERP No. F-COE-G85180-LA, Estelle Plantation Partnership Municipal 
    Golf Course and Housing Development, Implementation, Jefferson Parish, 
    LA.
        Summary: EPA continued to have environmental concerns regarding the 
    preferred actions but defers further comment pending completion of the 
    Clean Water Act Section 404 Permit processing.
        ERP No. F-FHW-K40214-CA, Alternatives to Replacement of the 
    Embarcadero Freeway and the Terminal Separator Structure, (Formerly CA-
    480) Implementation, Permit Approvals and Funding, San Francisco 
    County, CA.
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. F-GSA-C81017-NY, US Brooklyn Court Project, Demolition of 
    the Emanuel Celler Federal Building, Construction of a New Courthouse 
    and Renovation/Adaptive Reuse of the General Post Office at Cadman 
    Plaza East, Kings County, NY.
        Summary: EPA continued to have environmental concerns about the 
    meteorological data used in the air model. EPA has requested that 
    updated information be used in a revised modeling analysis.
    
        Dated: February 18, 1997.
    B. Katherine Biggs,
    Associate Director, NEPA Compliance Division, Office of Federal 
    Activities.
    [FR Doc. 97-4352 Filed 2-20-97; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
02/21/1997
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
97-4352
Pages:
8013-8014 (2 pages)
Docket Numbers:
ER-FRL-5477-7
PDF File:
97-4352.pdf