E7-2878. In the Matter of Dairyland Power Cooperative: La Crosse Boiling Water Reactor; Order Imposing Additional Security Measures (Effective Immediately)
-
Start Preamble
I
The Licensee, Dairyland Power Cooperative, holds a license issued by the U.S. Nuclear Regulatory Commission (NRC or Commission) for La Crosse Boiling Water Reactor, in accordance with the Atomic Energy Act of 1954, as amended, and 10 CFR part 50, authorizing it to possess and transfer items containing radioactive material quantities of concern. This Order is being issued to all such Licensees who may transport radioactive material quantities of concern under the NRC's authority to protect the common defense and security. The Orders require compliance with specific additional security measures to enhance the security for transport of certain radioactive material quantities of concern.
II
On September 11, 2001, terrorists simultaneously attacked targets in New York, NY, and Washington, DC, utilizing large commercial aircraft as weapons. In response to the attacks and intelligence information subsequently obtained, the Commission issued a number of Safeguards and Threat Advisories to Licensees in order to strengthen Licensees' capabilities and readiness to respond to a potential attack on this regulated activity. The Commission has also communicated with other Federal, State and local government agencies and industry representatives to discuss and evaluate the current threat environment in order to assess the adequacy of the current security measures. In addition, the Commission commenced a comprehensive review of its safeguards and security programs and requirements.
As a result of its initial consideration of current safeguards and security requirements, as well as a review of information provided by the intelligence community, the Commission has determined that certain security measures are required to be implemented by Licensees as prudent, interim measures to address the current threat environment in a consistent manner. Therefore, the Commission is imposing requirements, as set forth in Attachment A [1] of this Order, on the Licensee. These additional security measures, which supplement existing regulatory requirements, will provide the Commission with reasonable assurance that the common defense and security continue to be adequately protected in the current threat environment. These additional security measures will remain in effect until the Commission determines otherwise.
The Commission recognizes that the Licensee may have already initiated many of the measures set forth in Attachment A to this Order in response to previously issued Safeguards and Threat Advisories or on its own. It is also recognized that some measures may not be possible or necessary for all shipments of radioactive material quantities of concern, or may need to be tailored to accommodate the Licensee's specific circumstances to achieve the intended objectives and avoid any unforeseen effect on the safe transport of radioactive material quantities of concern.
Although the security measures implemented by Licensees in response to the Safeguards and Threat Advisories have been adequate to provide reasonable assurance of adequate protection of common defense and security, in light of the continuing threat environment, the Commission concludes that the security measures must be embodied in an Order, consistent with the established regulatory framework. The Commission has determined that the security measures contained in Attachment A of this Order contain Safeguards Information and will not be released to the public as per Order entitled, “Issuance of Order Imposing Requirements for the Protection of Certain Safeguards Information,” issued on November 15, 2006, to the Licensee. To provide assurance that Licensees are implementing prudent measures to achieve a consistent level of protection to address the current threat environment, the Licensee shall implement the requirements identified in Attachment A to this Order. In addition, pursuant to 10 CFR 2.202, I find that in light of the common defense and security matters identified above, which warrant the issuance of this Order, the public health and safety require that this Order be immediately effective.
III
Accordingly, pursuant to Sections 53, 81, 149, 161b, 161i, 161o, 182 and 186 of the Atomic Energy Act of 1954, as amended, and the Commission's regulations in 10 CFR 2.202 and 10 CFR part 50, it is hereby ordered, effective immediately, that the licensee shall comply with the following:
A. The Licensee shall, notwithstanding the provisions of any Commission regulation or license to the contrary, comply with the requirements described in Attachment A to this Order. The Licensee shall immediately start implementation of the requirements in Attachment A to the Order and shall complete implementation by August 11, 2007 or before the first shipment of radioactive material quantities of concern, whichever is sooner.
B.1. The Licensee shall, within twenty (20) days of the date of this Order, notify the Commission, (1) If it is unable to comply with any of the requirements described in Attachment A, (2) if compliance with any of the requirements is unnecessary in its specific circumstances, or (3) if implementation of any of the requirements would cause the Licensee to be in violation of the provisions of any Commission regulation or its license. The notification shall provide the Licensee's justification for seeking relief from or variation of any specific requirement.
2. If the Licensee considers that implementation of any of the requirements described in Attachment A to this Order would adversely impact Start Printed Page 7912the safe transport of radioactive material quantities of concern, it must notify the Commission, within twenty (20) days of this Order, of the adverse safety impact, the basis for its determination that the requirement has an adverse safety impact, and either a proposal for achieving the same objectives specified in the Attachment A requirement in question, or a schedule for modifying the activity to address the adverse safety condition. If neither approach is appropriate, the Licensee must supplement its response to Condition B.1 of this Order to identify the condition as a requirement with which it cannot comply, with attendant justifications as required in Condition B.1.
C. The Licensee shall report to the Commission when it has achieved full compliance with the requirements described in Attachment A.
D. Notwithstanding any provisions of the Commission's regulations to the contrary, all measures implemented or actions taken in response to this order shall be maintained until the Commission determines otherwise.
Licensee responses to Conditions B.1, B.2, and C above shall be submitted to the Document Control Desk, ATTN: Director, Office of Federal and State Materials and Environmental Management Programs, U.S. Nuclear Regulatory Commission, Washington, DC 20555. In addition, Licensee submittals that contain Safeguards Information shall be properly marked and handled in accordance with Licensee's Safeguards Information or Safeguards Information—Modified Handling program.
The Director, Office of Federal and State Materials and Environmental Management Programs, may, in writing, relax or rescind any of the above conditions upon demonstration by the Licensee of good cause.
IV.
In accordance with 10 CFR 2.202, the Licensee must, and any other person adversely affected by this Order may, submit an answer to this Order, and may request a hearing on this Order, within twenty (20) days of the date of this Order. Where good cause is shown, consideration will be given to extending the time to request a hearing. A request for extension of time in which to submit an answer or request a hearing must be made in writing to the Director, Office of Federal and State Materials and Environmental Management Programs, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and include a statement of good cause for the extension. The answer may consent to this Order. Unless the answer consents to this Order, the answer shall, in writing and under oath or affirmation, specifically set forth the matters of fact and law on which the Licensee or other person adversely affected relies and the reasons as to why the Order should not have been issued. Any answer or request for a hearing shall be submitted to the Secretary, Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, ATTN: Rulemakings and Adjudications Staff, Washington, DC 20555. Copies also shall be sent to the Director, Office of Federal and State Materials and Environmental Management Programs, U.S. Nuclear Regulatory Commission, Washington, DC 20555, to the Assistant General Counsel for Materials Litigation and Enforcement, to the Office of Enforcement at the same address, to the Regional Administrator for NRC Region III, at the address specified in Appendix A to 10 CFR Part 73, and to the Licensee if the answer or hearing request is by a person other than the Licensee. Because of possible delays in delivery of mail to United States Government offices, it is requested that answers and requests for hearing be transmitted to the Secretary of the Commission either by means of facsimile transmission to 301-415-1101 or by e-mail to hearingdocket@nrc.gov and also to the Office of the General Counsel either by means of facsimile to 301-415-3725 or by e-mail to OGCMailCenter@nrc.gov. If a person other than the Licensee requests a hearing, that person shall set forth with particularity the manner in which his interest is adversely affected by this Order and shall address the criteria set forth in 10 CFR 2.309.
If a hearing is requested by the Licensee or a person whose interest is adversely affected, the Commission will issue an Order designating the time and place of any hearing. If a hearing is held, the issue to be considered at such hearing shall be whether this Order should be sustained.
Pursuant to 10 CFR 2.202(c)(2)(i), the Licensee, may, in addition to demanding a hearing, at the time the answer is filed or sooner, move the presiding officer to set aside the immediate effectiveness of the Order on the grounds that the Order, including the need for immediate effectiveness, is not based on adequate evidence but on mere suspicion, unfounded allegations, or error.
In the absence of any request for hearing, or written approval of an extension of time in which to request a hearing, the provisions specified in Section III above shall be final twenty (20) days from the date of this Order without further order or proceedings. If an extension of time for requesting a hearing has been approved, the provisions specified in Section III shall be final when the extension expires if a hearing request has not been received. An answer or a request for hearing shall not stay the immediate effectiveness of this order.
Start SignatureDated this 12th day of February, 2007.
For the Nuclear Regulatory Commission.
Charles L. Miller,
Director, Office of Federal and State Materials and Environmental Management Programs.
Footnotes
1. Attachment A contains Safeguards Information and will not be released to the public.
Back to Citation[FR Doc. E7-2878 Filed 2-20-07; 8:45 am]
BILLING CODE 7590-01-P
Document Information
- Published:
- 02/21/2007
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- E7-2878
- Pages:
- 7911-7912 (2 pages)
- Docket Numbers:
- EA-07-014
- PDF File:
- e7-2878.pdf