DEPARTMENT OF ENERGY
[Docket No. ER94-1359-001, et al.]
Consolidated Edison Company of New York, Inc., et al. Electric
Rate and Corporate Regulation Filings
February 15, 1995.
Take notice that the following filings have been made with the
Commission:
1. Consolidated Edison Company of New York, Inc.
[Docket No. ER94-1359-001]
Take notice that on January 31, 1995, Consolidated Edison Company
of New York, Inc. (Con Edison) tendered for filing a Compliance Report
in the above-referenced docket.
Con Edison states that a copy of this filing has been served by
mail upon the New York State Electric and Gas Corporation and the
Public Service Commission of the State of New York.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
2. Carolina Power & Light Company
[Docket No. ER95-27-000]
Take notice that on January 27, 1995, Carolina Power & Light
Company tendered for filing an amendment in the above-referenced
docket.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
3. Southern Company Services, Inc.
[Docket No. ER95-59-002]
Take notice that on January 30, 1995, Southern Company Services,
Inc., as agent for Alabama Power Company, Georgia Power Company, Gulf
Power Company, Mississippi Power Company, and Savannah Electric and
Power Company, tendered for filing amended procedures applicable to its
recovery of emission allowance replacement costs under the Intercompany
Interchange Contract of Southern Companies, various unit power sales
agreements, and various interchange agreements with certain neighboring
utilities. The purpose of the filing is to comply with the Commission's
Order of December 30, 1994 in Docket No. ER95-59-000.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
4. Mississippi Power Company
[Docket No. ER95-138-002]
Take notice that on February 1, 1995, Mississippi Power Company
tendered for filing a modification to its practice under its
interchange agreement with South Mississippi Electric Power
Association. The purpose of this modification is to allow for the in
kind payment of allowances prior to the EPA reporting date rather than
at the time of the transaction.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
5. Alabama Power Company
[Docket No. ER95-149-002]
Take notice that on January 30, 1995, Alabama Power Company
tendered for filing amended procedures applicable to its recovery of
emission allowance replacement costs under the Interconnection
Agreement Between Alabama Power Company and Alabama Electric
Cooperative, Inc., and the Agreement for Transmission Service to
Distribution Cooperative Members of Alabama Electric Cooperative. The
purpose of the filing is to comply with the Commission's Order of
December 30, 1994 in Docket No. ER95-149-000.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
6. Illinois Power Company
[Docket No. ER95-285-000]
Take notice that on January 31, 1995, Illinois Power Company
tendered for filing an amendment in the above-referenced docket.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
7. Tampa Electric Company
[Docket No. ER95-335-000]
Take notice that on February 8, 1995, Tampa Electric Company
tendered for filing an amendment in the above-referenced docket.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
8. Allegheny Power Service Corporation
[Docket No. ER95-510-000]
Take notice that on February 1, 1995, Allegheny Power Service
Corporation tendered for filing an amendment in the above-referenced
docket. [[Page 9832]]
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
9. NorAm Energy Services, Inc.
[Docket No. ER95-512-000]
Take notice that on January 30, 1995, NorAm Energy Services, Inc.
(NorAm) tendered for filing copies of a Power Sales Agreement between
Central Louisiana Electric Company, Inc. and NorAm.
10. New England Power Company
[Docket No. ER95-539-000]
Take notice that on February 2, 1995, New England Power Company
tendered for filing a contract with Catex-Vitol Electric, Inc. for the
provision of exchange unit capacity.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
11. PacifiCorp
[Docket No. ER95-540-000]
Take notice that on February 2, 1995, PacifiCorp tendered for
filing in accordance with 18 CFR Part 35 of the Commission's Rules and
Regulations, a revision to the Annual Charge Rate Calculation,
Supplement No. 2 to PacifiCorp Rate Schedule FERC No. 234, for
transmission service pursuant to the Operations and Maintenance
Agreement for Swift No. 2 between PacifiCorp and the Public Utility
District No. 1 of Cowlitz County (Cowlitz), PacifiCorp Rate Schedule
FERC No. 234.
PacifiCorp requests that the revised Annual Charge Rate Calculation
be accepted within sixty days of the Commission's receipt of this
filing.
Copies of this filing were supplied to Cowlitz, the Washington
Utilities and Transportation Commission and the Public Utility
Commission of Oregon.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
12. Iowa-Illinois Gas & Electric Company
[Docket No. ER95-541-000]
Take notice that on February 2, 1995, Iowa-Illinois Gas and
Electric Company (Iowa-Illinois), 206 East Second Street, P.O. Box
4350, Davenport, Iowa 52808, tendered for filing pursuant to Sec. 35.12
of the Regulations under the Federal Power Act an initial rate schedule
consisting of a Transmission Service Agreement dated as of December 16,
1994 between Iowa-Illinois and Electric Clearinghouse, Inc. (ECI).
Iowa-Illinois states that the terms and conditions of this
Agreement are identical in all respects to Iowa-Illinois' Transmission
Service Agreement with Enron Power Marketing, Inc. which was accepted
for filing by the Commission on January 31, 1995 in Docket No. ER95-
334-000 and Iowa-Illinois' Transmission Service Agreement with four
other power marketers submitted for filing on January 13, 1995 in
Docket No. ER95-426-000. Iowa-Illinois further states that under the
Agreement it will provide non-firm transmission service to ECI on a
monthly, weekly, daily or hourly basis to transmit power and associated
energy from certain defined points to other defined points on Iowa-
Illinois' interconnected electric system. Service will be provided upon
request by ECI on an as available basis as determined by Iowa-Illinois.
Iowa-Illinois requests a waiver of the Commission's 60-day notice
requirement in order to permit the Agreement to become effective on or
before March 6, 1995.
Copies of the filing were served upon the Iowa Utilities Board, the
Illinois Commerce Commission and ECI.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
13. Northeast Utilities Service Company
[Docket No. ER95-542-000]
Take notice that on February 2, 1995, Northeast Utilities Service
Company (NUSCO), tendered for filing a Service Agreement to provide
non-firm transmission service to Catex Vitol Electric Inc. (Catex)
under the NU System Companies' Transmission Service Tariff No. 2.
NUSCO states that a copy of this filing has been mailed to Catex.
NUSCO requests that the Service Agreement become effective sixty
(60) days after receipt of this filing by the Commission.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
14. Potomac Electric Power Company
[Docket No. ER95-543-000]
Take notice that on February 2, 1995, Potomac Electric Power
Company submitted an explanation of Pepco's treatment of the cost of
emission allowances in its as-available power sales tariff, and makes
minor corrections to the original submittal. This filing has no
substantive effect upon the services rendered and makes no change in
rates. Pursuant to the Commission's ``Policy Statement and Interim
Rule'' on emission allowance costs and with waiver of notice, an
effective date of January 1, 1995 is requested.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
15. PacifiCorp
[Docket No. ER95-547-000]
Take notice that on February 3, 1995, PacifiCorp, tendered for
filing in accordance with 18 CFR Part 35 of the Commission's Rules and
Regulations, new and amended Exhibits to the Cooperative Communications
Agreement, Contract No. DE-MS79-92BP93740, between PacifiCorp and
Bonneville Power Administration.
PacifiCorp request that these Exhibits be accepted pursuant to 18
CFR 35.3 of the Commission's Rules and Regulations.
Copies of this filing were supplied to the Public Utility
Commission of Oregon and the Washington Utilities and Transportation
Commission.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
16. Southern Company Services, Inc.
[Docket No. ER95-548-000]
Take notice that on February 3, 1995, Southern Company Services,
Inc. (SCS), acting on behalf of Alabama Power Company, Georgia Power
Company, Gulf Power Company, Mississippi Power Company, and Savannah
Electric and Power Company (collectively referred to as ``Southern
Companies'') filed a Service Agreement dated as of January 23, 1995
between Florida Power Corporation and SCS (as agent for Southern
Companies) for service under the Short Term Non-Firm Transmission
Service Tariff of Southern Companies.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
17. New England Power Company
[Docket No. FA91-53-002]
Take notice that on January 24, 1995, New England Power Company
tendered for filing its refund report in the above-referenced docket.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice.
18. Ohio Power Company
[Docket No. FA92-60-001]
Take notice that on January 27, 1995, Ohio Power Company tendered
for filing its compliance report in the above-referenced docket.
Comment date: March 1, 1995, in accordance with Standard Paragraph
E at the end of this notice. [[Page 9833]]
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-4232 Filed 2-21-95; 8:45 am]