    DEPARTMENT OF ENERGY
    [Docket No. CP93-261-001]
    
     
    
    Algonquin Gas Transmission Co.; Amendment
    
    February 16, 1994.
        Take notice that on February 15, 1994, Algonquin Gas Transmission 
    Company (Algonquin), located at 1284 Soldiers Field Road, Boston, 
    Massachusetts 02135, filed an amendment in Docket No. CP93-261-001, 
    pursuant to Section 7(c) of the Natural Gas Act, requesting a 
    certificate of public convenience and necessity authorizing Algonquin 
    to construct and operate facilities and to transport and deliver a 
    total of approximately 14,758 MMbtu of natural gas per day on a firm 
    basis to Bay State Gas Company (Bay State), all as more fully set forth 
    in the application which is on file with the Commission and open to 
    public inspection.
        Algonquin states that the withdrawal of New England Power from the 
    AFT-5 project has resulted in a reduction in the service and facility 
    requirements originally proposed.
        Specifically, Algonquin now proposes to: (1) Construct and operate 
    3.8 miles of 16-inch loop on Algonquin's I-2 system from Valve I-22 to 
    the Brockton Meter Station in Brockton, Massachusetts; (2) upgrade 
    Turbine Nos. C-7 and C-8 to 4,700 hp at the Cromwell Compressor Station 
    in Cromwell, Massachusetts; and (3) make various modifications to 
    metering and regulating facilities in Waterford and Pomfret, 
    Connecticut and in Ashland, Brockton and Norwood, Massachusetts. The 
    cost of Algonquin's proposed facilities is estimated to be $13,139,000.
        Algonquin would provide the firm transportation service for Bay 
    State under proposed Rate Schedule AFT-5, and would charge a 100% 
    demand rate of $19.3606 per MMbtu for the incremental service.
        Algonquin seeks a shortened notice period and expeditious 
    Commission action in order to construct the necessary facilities and 
    commence the proposed service by November 1, 1994.
        Any person desiring to be heard or to make any protest with 
    reference to said petition should, on or before February 23, 1994, file 
    with the Federal Energy Regulatory Commission (Commission), 825 North 
    Capitol Street, NE., Washington, DC 20426, a petition to intervene or 
    protest in accordance with the requirements of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 or 385.214) and the 
    Regulations under the NGA (18 CFR 157.10). All protests filed with the 
    Commission will be considered by it in determining the appropriate 
    action to be taken but will not serve to make the protestants parties 
    to the proceeding. Any person wishing to become a party to a proceeding 
    or to participate as a party in any hearing therein must file a 
    petition to intervene in accordance with the Commission's Rules. Any 
    person who has heretofore filed need not file again.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-4017 Filed 2-22-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/23/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-4017
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: February 23, 1994, Docket No. CP93-261-001