Start Preamble
AGENCY:
Federal Energy Regulatory Commission, DOE.
ACTION:
Notice of information collection and request for comments.
SUMMARY:
In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725J (Definition of the Bulk Electric System).
DATES:
Comments on the collection of information are due April 25, 2016.
ADDRESSES:
You may submit comments (identified by Docket No. IC16-6-000) by either of the following methods:
- eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp
- Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426.
Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 273-0873.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Title: FERC-725J, Definition of the Bulk Electric System
OMB Control No.: 1902-0259
Type of Request: Three-year extension of the FERC-725J information collection requirements with no changes to the current reporting requirements.
Abstract: On December 20, 2012, the Commission issued Order No. 773, a Final Rule approving NERC's modifications to the definition of “bulk electric system” and the Rules of Procedure exception process to be effective July 1, 2013. On April 18, 2013, in Order No. 773-A, the Commission largely affirmed its findings in Order No. 773. In Order Nos. 773 and 773-A, the Commission directed NERC to modify the definition of bulk electric system in two respects: (1) Modify the local network exclusion (exclusion E3) to remove the 100 kV minimum operating voltage to allow systems that include one or more looped configurations connected below 100 kV to be eligible for the local network exclusion; and (2) modify the exclusions to ensure that generator interconnection facilities at or above 100 kV connected to bulk electric system generators identified in inclusion I2 are not excluded from the bulk electric system.
Type of Respondents: Generator owners, distribution providers, other NERC-registered entities.
Estimate of Annual Burden: [1] The Commission estimates the annual public reporting burden for the information collection as:
FERC-725J (Definition of the Bulk Electric System)
Number of respondents Annual number of responses per respondent Total number of responses Average burden and cost per response 2 Total annual burden hours and total annual cost Cost per respondent ($) (1) (2) (1)*(2)=(3) (4) (3)*(4)=(5) (5)÷(1) Generator Owners and Distribution Providers (Exception Request) 20 1 20 94 hrs.; $5,864 1,880 hrs.; $117,274 $5,864 All Registered Entities (Implementation Plans and Compliance) 186 1 186 350 hrs.; $21,833 65,100 hrs.; $4,060,938 $21,833 Total 206 66,980 hrs.; $4,178,212 $27,697 Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; Start Printed Page 9180and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.
Start SignatureDated: February 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Footnotes
1. The Commission defines burden as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3.
Back to Citation2. The estimates for cost per response are derived using the following formula: Average Burden Hours per Response * $62.38/hour = Average Cost per Response. The hourly cost figure (wages plus benefits) comes from the Bureau of Labor Statistics (http://www.bls.gov/oes/current/naics2_22.htm). The figure is for an electric engineer (Occupational Code: 17-2071).
Back to Citation[FR Doc. 2016-03838 Filed 2-23-16; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 02/24/2016
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Action:
- Notice of information collection and request for comments.
- Document Number:
- 2016-03838
- Dates:
- Comments on the collection of information are due April 25, 2016.
- Pages:
- 9179-9180 (2 pages)
- Docket Numbers:
- Docket No. IC16-6-000
- PDF File:
- 2016-03838.pdf