E9-3969. PJM Interconnection, L.L.C.; PJM Interconnection, L.L.C.; Notice Deferring Technical Conference  

  • Start Preamble February 18, 2009.

    In PJM Interconnection, L.L.C., 124 FERC ¶ 61,272, at P 53 (2008), the Commission indicated that it expected to hold a technical conference in this proceeding in February 2009. The date of that conference is hereby deferred pending further notice.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. E9-3969 Filed 2-24-09; 8:45 am]

    BILLING CODE 6717-01-P