96-4210. Pacific Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 61, Number 38 (Monday, February 26, 1996)]
[Notices]
[Page 7097]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4210]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP96-179-000]
Pacific Gas Transmission Company; Notice of Request Under Blanket
Authorization
February 20, 1996.
Take notice that on February 8, 1996, Pacific Gas Transmission
Company (PGT), 2100 Southwest River Parkway, Portland, Oregon 97201,
filed in Docket No. CP96-179-000 a request pursuant to Secs. 157.205
and 157.211 of the Commission's Regulations under the Natural Gas Act
(18 CFR 157.205, 157.211) for authorization to install a new tap and
meter set near Moyie Springs, Idaho for delivery of gas to The
Washington Water Power Company (WWP), under PGT's blanket certificate
issued in Docket No. CP82-530-000 pursuant to Section 7 of the Natural
Gas Act, all as more fully set forth in request on file with the
Commission and open to public inspection.
According to PGT, WWP requested that a 2-inch tap and meter set
with appurtenant facilities be constructed to allow WWP an additional
supply point for its Bonners Ferry distribution system. These needed
facilities will let WWP provide more reliable service to the Moyie
Springs and Bonners Ferry area which has been experiencing supply
disruptions from flooding on the Kootenai River.
PGT states that the facilities will be located immediately adjacent
to PGT's existing right-of-way near Moyie Springs on land owned by WWP.
The station will consist of a fenced and graveled yard, an 8-by-16 foot
building housing gas pressure regulation and metering facilities,
approximately 150 feet of 2-inch buried pipe and a slab-mounted gas
heater. Construction will be from April 1, 1996 to June 1, 1996. The
proposed tap will have no impact on PGT's peak day or annual deliveries
and there is sufficient capacity to accomplish deliveries without
detriment or disadvantage to existing customers.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 96-4210 Filed 2-23-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 02/26/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-4210
- Pages:
- 7097-7097 (1 pages)
- Docket Numbers:
- Docket No. CP96-179-000
- PDF File:
-
96-4210.pdf