96-4210. Pacific Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 38 (Monday, February 26, 1996)]
    [Notices]
    [Page 7097]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-4210]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-179-000]
    
    
    Pacific Gas Transmission Company; Notice of Request Under Blanket 
    Authorization
    
    February 20, 1996.
        Take notice that on February 8, 1996, Pacific Gas Transmission 
    Company (PGT), 2100 Southwest River Parkway, Portland, Oregon 97201, 
    filed in Docket No. CP96-179-000 a request pursuant to Secs. 157.205 
    and 157.211 of the Commission's Regulations under the Natural Gas Act 
    (18 CFR 157.205, 157.211) for authorization to install a new tap and 
    meter set near Moyie Springs, Idaho for delivery of gas to The 
    Washington Water Power Company (WWP), under PGT's blanket certificate 
    issued in Docket No. CP82-530-000 pursuant to Section 7 of the Natural 
    Gas Act, all as more fully set forth in request on file with the 
    Commission and open to public inspection.
        According to PGT, WWP requested that a 2-inch tap and meter set 
    with appurtenant facilities be constructed to allow WWP an additional 
    supply point for its Bonners Ferry distribution system. These needed 
    facilities will let WWP provide more reliable service to the Moyie 
    Springs and Bonners Ferry area which has been experiencing supply 
    disruptions from flooding on the Kootenai River.
        PGT states that the facilities will be located immediately adjacent 
    to PGT's existing right-of-way near Moyie Springs on land owned by WWP. 
    The station will consist of a fenced and graveled yard, an 8-by-16 foot 
    building housing gas pressure regulation and metering facilities, 
    approximately 150 feet of 2-inch buried pipe and a slab-mounted gas 
    heater. Construction will be from April 1, 1996 to June 1, 1996. The 
    proposed tap will have no impact on PGT's peak day or annual deliveries 
    and there is sufficient capacity to accomplish deliveries without 
    detriment or disadvantage to existing customers.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-4210 Filed 2-23-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
02/26/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-4210
Pages:
7097-7097 (1 pages)
Docket Numbers:
Docket No. CP96-179-000
PDF File:
96-4210.pdf