AGENCIES: The Department of the Interior (Department) and the Central
Utah Water Conservancy District (District).
ACTION: Notice of availability of the Draft Environmental Impact
Statement: DES 97-7.
-----------------------------------------------------------------------
SUMMARY: Pursuant to section 102(2)(C) of the National Environmental
Policy Act of 1969, as amended, the Department, and the District have
issued a joint Draft Environmental Impact Statement (Draft EIS) on the
Uintah Unit Replacement Project (Uintah Unit). The Draft EIS consists
of a proposed action and alternatives to construct a combination of
features that will develop water supplies for the Uintah Unit of the
Central Utah Project in the Uinta Basin of northeastern Utah. The Draft
EIS evaluates the environmental impacts of water storage reservoirs,
improved diversion and distribution of water, water conservation,
stabilization of high mountain lakes, instream flows, fish and wildlife
mitigation and enhancement, recreation developments and land
retirement.
There is a need to manage the water supply within the Uintah Unit
to develop resources of the Ute Indian Tribe of the Uintah and Ouray
Reservation, provide early and late season irrigation water, and
provide water and facilities for environmental and recreation purposes.
The proposed action and alternatives seek to meet these needs by
providing storage, improved distribution of water, water conservation,
instream flows, fish and wildlife enhancements, and recreation
developments.
Public participation has occurred throughout the EIS process. A
Notice of Intent was filed in the Federal Register on December 31,
1992. Since that time, open houses, public meetings, and mail-outs have
been conducted to solicit comments and ideas. Any comments received
throughout the process have been considered.
DATES: Written comments on the Draft EIS must be submitted or
postmarked no later than April 29, 1997. Comments on the Draft EIS may
also be presented verbally or submitted in writing at the public
hearings to be held at the following times and locations:
Tuesday, April 1, 1997, 1:00 p.m., Ute Tribal Auditorium,
Tribal Headquarters, Fort Duchesne, Utah.
Tuesday, April 1, 1997, 6:00 p.m., Union High School
Auditorium, 135 North Union, Roosevelt, Utah.
Wednesday April 2, 1997, 6:00 p.m., Salt Lake County
Commission Chambers, Room N1101, 2001 South State Street, Salt Lake
City, Utah.
The public hearings are being held to address the Draft EIS for the
proposed Uintah Unit Replacement Project. In order to be included as
part of the hearing record, written testimony must be submitted at the
time of the hearing. Verbal testimony will be limited to 5 minutes.
Those wishing to give testimony at a hearing should submit a
registration form, included at the end of the Draft EIS, to the address
listed below by, March 25, 1997.
ADDRESS: Comments on the Draft EIS should be addressed to: Terry
Holzworth, Project Manager, Central Utah Water Conservancy District,
355 West 1300 South, Orem, Utah 84058.
FOR FURTHER INFORMATION: Additional copies of the Draft EIS, copies of
the resources technical reports, Draft Feasibility Study, or
information on matters related to this notice can be obtained on
request from: Ms. Nancy Hardman, Central Utah Water Conservancy
District, 355 West 1300 South, Orem, Utah 84058, Telephone: (801) 226-
7187, Fax: (801) 226-7150.
Copies are also available for inspection at:
Central Utah Water Conservancy District, 355 West 1300 South, Orem,
Utah 84058
Department of the Interior, Natural Resource Library, Serials Branch,
18th and C Streets, NW, Washington, D.C. 20240
Department of the Interior, Central Utah Project Completion Act Office,
302 East 1860 South, Provo, Utah 84606
Bureau of Indian Affairs, Uintah and Ouray Agency, 988 South 7500 East,
Fort Duchesne, Utah 84026.
Dated: February 21, 1997.
Ronald Johnston,
CUPCA Program Director, Department of the Interior.
[FR Doc. 97-4753 Filed 2-25-97; 8:45 am]