98-4910. Notice of Application for New Major License  

  • [Federal Register Volume 63, Number 38 (Thursday, February 26, 1998)]
    [Notices]
    [Page 9790]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-4910]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application for New Major License
    
    February 20, 1998.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: New Major License.
        b. Project No.: 2674-003.
        c. Date Filed: May 30, 1997.
        d. Applicant: Green Mountain Power Corporation.
        e. Name of Project: Vergennes Hydroelectric Project.
        f. Location: On Otter Creek in the City of Vergennes, Addison 
    County, Vermont.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Mr. Michael Scarzello, Green Mountain Power 
    Corporation, 25 Green Mountain Drive, P.O. Box 850, South Burlington, 
    VT 05402, (802) 660-5835.
        i. FERC Contact: Lee Emery, (202) 219-2779.
        j. Deadline Date: See attached paragraph D9.
        k. Status of Environmental Analysis: The application has been 
    accepted for filing and is ready for environmental analysis at this 
    time--see attached paragraph D9.
        l. Description of the Project: The Vergennes Project's existing 
    facilities consist of the following features: (1) Three concrete 
    overflow dams, each about 10 feet high, with a total length of 231 
    feet, each having a crest elevation of about 132.78 feet above mean sea 
    level (msl), surmounted by 1.5-foot-high flashboards, and a 29-foot-
    long, non-overflow dam; (2) an 8.8-mile-long, 133 acre surface area 
    reservoir having a 200 acre-foot usable storage capacity at normal 
    water surface elevation of 134.28 feet msl; (3) the north forebay with 
    trashracks, headgates, and two 7-foot-diameter steel penstocks; (4) the 
    north powerhouse, known as Plant 9B, with a 1,000-kW generating unit; 
    (5) the south forebay, with trashracks, headgates, two surge tanks, and 
    two 10-foot-diameter penstocks; (6) the south powerhouse, known as 
    Plant 9, with two 700-kW generating units; (7) the generator leads from 
    Plant 9 to the Vergennes substation and the 950-foot-long, 2,400-volt 
    overhead generator leads from Plant 9B to the Vergennes substation; and 
    (8) appurtenant facilities.
        The total project generating capacity would be 2,400 kW, and the 
    total average annual generation would be 9.455 MWh. The applicant owns 
    the dam and existing project facilities.
        m. This notice also consists of the following standard paragraphs: 
    D9.
        n. A copy of the application is available for inspection and 
    reproduction at the Commission's Public Reference Room, located at: 888 
    First St., NE, Room 2A, Washington, DC 20426, or by calling (202) 208-
    1371. A copy is also available for inspection and reproduction at 25 
    Green Mountain Drive, South Burlington, VT 05402, (802) 864-5731 and at 
    the City of Vergennes, City Manager's Office, Route 22A (Main Street), 
    Vergennes, VT 05491, or by calling (802) 877-3637.
        D9. Filing and Service of Responsive Documents--The application is 
    ready for environmental analysis at this time, and the Commission is 
    requesting comments, reply comments, recommendations, terms and 
    conditions, and prescriptions.
        The Commission directs, pursuant to Section 4.34(b) of the 
    Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 
    1991), that all comments, recommendations, terms and conditions and 
    prescriptions concerning the application be filed with the Commission 
    within 60 days from the issuance date of this notice. All reply 
    comments must be filed with the Commission within 105 days from the 
    date of this notice.
        Anyone may obtain an extension of time for these deadlines from the 
    Commission only upon a showing of good cause or extraordinary 
    circumstances in accordance with 18 CFR 385.2008.
        All filings must (1) bear in all capital letters the title 
    ``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
    CONDITIONS,'' or ``PRESCRIPTIONS''; (2) set forth in the heading the 
    name of the applicant and the project number of the application to 
    which the filing responds; (3) furnish the name, address, and telephone 
    number of the person submitting the filing; and (4) otherwise comply 
    with the requirements of 18 CFR 385.2001 through 385.2005. All 
    comments, recommendations, terms and conditions or prescriptions must 
    set forth their evidentiary basis and otherwise comply with the 
    requirements of 18 CFR 4.34(b). Any of these documents must be filed by 
    providing the original and the number of copies required by the 
    Commission's regulations to: The Secretary, Federal Energy Regulatory 
    Commission, 888 First Street, NE, Washington, DC 20426. An additional 
    copy must be sent to Director, Division of Licensing and Compliance, 
    Office of Hydropower Licensing, Federal Energy Regulatory Commission, 
    at the above address. Each filing must be accompanied by proof of 
    service on all persons listed on the service list prepared by the 
    Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 
    385.2010.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-4910 Filed 2-25-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/26/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-4910
Dates:
See attached paragraph D9.
Pages:
9790-9790 (1 pages)
PDF File:
98-4910.pdf