DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-212-000]
Columbia Gas Transmission Corporation; Notice of Request under
Blanket Authorization
February 22, 1999.
Take notice that on February 12, 1999, Columbia Gas Transmission
Corporation (Columbia), 12801 Fair Lakes Parkway, Fairfax, Virginia
22030 filed in Docket No. CP99-212-000 a request pursuant to Sections
157.205 and 157.212 of the Commission's Regulations under the Natural
Gas Act (NGA) (18 CFR 157.205, 157.212) is seeking NGA Section 7
certification for an existing point of delivery in Gilmer County, West
Virginia under Columbia's blanket certificate issued in Docket No.
CP83-76-000 pursuant to Section 7 of the Natural Gas Act, all as more
fully set forth in the request on file with Commission and open to
public inspection. This application may also be viewed on the Internet
at http:/www.ferc.fed.us/online/rims.htm (call 202-208-2222 for
assistance).
Columbia requests certification for the existing Natural Gas Policy
Act Section 311 point of delivery so it can provide both part 284,
Subpart B, and Subpart G transportation. The existing point of delivery
for which Columbia requests NGA certification under Sections 157.205
and 157.212 is for Eastern Marketing. The maximum daily quantity is
1,500 Dth, the annual quantity is 547,500 Dth and the end use of gas is
industrial. The transportation service to be provided through the
existing point of delivery would be firm service provided under
Columbia's Rate Schedule, Firm Transportation Service.
Columbia constructed the existing point of delivery to Eastern
Marketing in Gilmer County, West Virginia, which was placed in service
on August 20, 1997. The cost of constructing the existing point of
delivery was $39,000. Facilities installed by Columbia included a tap,
meter, structure, and a filter separator.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Secretary.
[FR Doc. 99-4785 Filed 2-25-99; 8:45 am]