99-4785. Columbia Gas Transmission Corporation; Notice of Request under Blanket Authorization  

  • [Federal Register Volume 64, Number 38 (Friday, February 26, 1999)]
    [Notices]
    [Page 9488]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-4785]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-212-000]
    
    
    Columbia Gas Transmission Corporation; Notice of Request under 
    Blanket Authorization
    
    February 22, 1999.
        Take notice that on February 12, 1999, Columbia Gas Transmission 
    Corporation (Columbia), 12801 Fair Lakes Parkway, Fairfax, Virginia 
    22030 filed in Docket No. CP99-212-000 a request pursuant to Sections 
    157.205 and 157.212 of the Commission's Regulations under the Natural 
    Gas Act (NGA) (18 CFR 157.205, 157.212) is seeking NGA Section 7 
    certification for an existing point of delivery in Gilmer County, West 
    Virginia under Columbia's blanket certificate issued in Docket No. 
    CP83-76-000 pursuant to Section 7 of the Natural Gas Act, all as more 
    fully set forth in the request on file with Commission and open to 
    public inspection. This application may also be viewed on the Internet 
    at http:/www.ferc.fed.us/online/rims.htm (call 202-208-2222 for 
    assistance).
        Columbia requests certification for the existing Natural Gas Policy 
    Act Section 311 point of delivery so it can provide both part 284, 
    Subpart B, and Subpart G transportation. The existing point of delivery 
    for which Columbia requests NGA certification under Sections 157.205 
    and 157.212 is for Eastern Marketing. The maximum daily quantity is 
    1,500 Dth, the annual quantity is 547,500 Dth and the end use of gas is 
    industrial. The transportation service to be provided through the 
    existing point of delivery would be firm service provided under 
    Columbia's Rate Schedule, Firm Transportation Service.
        Columbia constructed the existing point of delivery to Eastern 
    Marketing in Gilmer County, West Virginia, which was placed in service 
    on August 20, 1997. The cost of constructing the existing point of 
    delivery was $39,000. Facilities installed by Columbia included a tap, 
    meter, structure, and a filter separator.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-4785 Filed 2-25-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/26/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-4785
Pages:
9488-9488 (1 pages)
Docket Numbers:
Docket No. CP99-212-000
PDF File:
99-4785.pdf