E8-3584. Railroad Cost Recovery Procedures Productivity Adjustment  

  • Start Preamble Start Printed Page 10335

    AGENCY:

    Surface Transportation Board, DOT.

    ACTION:

    Proposed Adoption of a Railroad Cost Recovery Procedures Productivity Adjustment.

    SUMMARY:

    The Surface Transportation Board proposes to adopt 1.008 (0.8%) as the measure of average change in railroad productivity for the 2002-2006 (5-year) averaging period. This value is a decline of 0.9 of a percentage point from the current measure of 1.7% that was developed for the 2001-2005 period.

    DATES:

    Comments are due March 13, 2008.

    EFFECTIVE DATE:

    The proposed productivity adjustment is effective March 17, 2008.

    ADDRESSES:

    Send comments (an original and 10 copies) referring to STB Ex Parte No. 290 (Sub-No. 4) to: Surface Transportation Board, 395 E Street, SW., Washington, DC 20423-0001.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Pedro Ramirez, (202) 245-0333. [Federal Information Relay Service (FIRS) for the hearing impaired: 1-800-877-8339.]

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Additional information is contained in the Board's decision, which is available on our Web site www.stb.dot.gov. To purchase a copy of the full decision, write to, e-mail or call the Board's contractor, ASAP Document Solutions; 9332 Annapolis Rd., Suite 103, Lanham, MD 20706; e-mail asapdc@verizon.net; phone (202) 306-4004. [Assistance for the hearing impaired is available through FIRS: 1-800-877-8339.]

    This action will not significantly affect either the quality of the human environment or energy conservation.

    Pursuant to 5 U.S.C. 605(b), we conclude that our action will not have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act.

    Start Signature

    Decided: February 20, 2008.

    By the Board, Chairman Nottingham, Vice Chairman Mulvey, and Commissioner Buttrey.

    Anne K. Quinlan,

    Acting Secretary.

    End Signature End Supplemental Information

    [FR Doc. E8-3584 Filed 2-25-08; 8:45 am]

    BILLING CODE 4915-01-P

Document Information

Published:
02/26/2008
Department:
Surface Transportation Board
Entry Type:
Notice
Action:
Proposed Adoption of a Railroad Cost Recovery Procedures Productivity Adjustment.
Document Number:
E8-3584
Dates:
Comments are due March 13, 2008.
Pages:
10335-10335 (1 pages)
Docket Numbers:
STB Ex Parte No. 290 (Sub-No. 4)
PDF File:
e8-3584.pdf