2016-04151. Notice of Effectiveness of Exempt Wholesale Generator Status  

  • Start Preamble
    Docket No.
    Pavant Solar, LLCEG15-115-000
    Campbell County Wind Farm, LLCEG16-15-000
    OCI Alamo 6 LLCEG16-16-000
    OCI Alamo 7 LLCEG16-17-000
    OCI Solar TRE LLCEG16-18-000
    BIF III Holtwood LLCEG16-19-000
    Black Oak Wind, LLCEG16-20-000
    Central Antelope Dry Ranch C LLCEG16-21-000
    Shelby County Energy Center, LLCEG16-22-000
    Golden Hills Interconnection, LLCEG16-23-000
    Blythe Solar 110, LLCEG16-24-000
    NextEra Blythe Solar Energy Center, LLCEG16-25-000

    Take notice that during the months of November 2015 and January 2016, the status of the above-captioned entities as Exempt Wholesale Generators became effective by operation of the Commission's regulations. 18 CFR 366.7(a).

    Start Signature

    Dated: February 22, 2016.

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature End Preamble

    [FR Doc. 2016-04151 Filed 2-25-16; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
02/26/2016
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2016-04151
Pages:
9836-9836 (1 pages)
PDF File:
2016-04151.pdf