[Federal Register Volume 63, Number 39 (Friday, February 27, 1998)]
[Notices]
[Pages 10017-10018]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-4990]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL98-27-000, et al.]
Delmarva Power & Light Company, et al.; Electric Rate and
Corporate Regulation Filings
February 20, 1998.
Take notice that the following filings have been made with the
Commission:
1. Delmarva Power & Light Company
[Docket No. EL98-27-000]
Take notice that on February 9, 1998, Delmarva Power & Light
Company tendered for filing a motion to collect PJM network
transmission service charges from the City of Dover, for the period
April 1, 1997 through April 1, 1998.
Comment date: March 9, 1998, in accordance with Standard Paragraph
E at the end of this notice.
2. Berkshire Power Company LLC
[Docket No. EG98-27-000]
Take notice that on February 18, 1998, Berkshire Power Company LLC
(Berkshire), 200 High Street, Boston, Massachusetts 02110, filed with
the Federal Energy Regulatory Commission (Commission) an amended
application for determination of exempt wholesale generator status
pursuant to Part 365 of the Commission's Regulations.
Berkshire is a Massachusetts limited liability company that
proposes to construct and own a two hundred seventy-two (272) megawatt
natural gas-fired electric generation facility, including ancillary and
appurtenant structures, on a site in the town of Agawam, Massachusetts.
Berkshire states that it will be engaged directly, or indirectly
through one or more affiliates, as defined in Section 2(a)(11)(B) of
PUHCA, and exclusively in the business of owning and/or operating, all
or part of one or more eligible facilities and selling electric energy
at wholesale.
Comment date: March 13, 1998, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the amended application.
3. Sithe Framingham LLC
[Docket No. EG98-41-000]
Take notice that on February 11, 1998, Sithe Framingham LLC, 450
Lexington Avenue, 37th Floor, New York, NY 10017 (Sithe Framingham),
filed with the Federal Energy Regulatory Commission an application for
determination of exempt wholesale generator status pursuant to Part 365
of the Commission's Regulations.
Sithe Framingham will own an electric generating facility with a
capacity of approximately 33 MW located in Framingham, Massachusetts.
Comment date: March 6, 1998, in accordance with Standard Paragraph
E at the end of this notice. The commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
4. Sithe Mystic LLC
[Docket No. EG98-46-000]
Take notice that on February 11, 1998, Sithe Mystic LLC, 450
Lexington Avenue, 37th Floor, New York, NY 10017 (Sithe Mystic), filed
with the Federal Energy Regulatory Commission an application for
determination of exempt wholesale generator status pursuant to Part 365
of the Commission's Regulations.
Sithe Mystic will own an electric generating facility with a
capacity of approximately 990 MW located in Everett, Massachusetts.
Comment date: March 6, 1998, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
5. Duke Power Company
[Docket No. ER97-2398-002]
Take notice that on February 9, 1998, Duke Power Company tendered
for filing its compliance filing in the above-referenced docket.
Comment date: March 6, 1998, in accordance with Standard Paragraph
E at the end of this notice.
6. PJM Interconnection, L.L.C.
[Docket ER98-1794-000]
Take notice that on February 10, 1998, the PJM Interconnection,
L.L.C. (PJM), filed on behalf of the Members of the LLC, membership
applications of CMS Marketing, Services and Trading. PJM requests an
effective date on the day after this Notice of Filing is received by
FERC.
Comment date: March 6, 1998, in accordance with Standard Paragraph
E at the end of this notice.
[[Page 10018]]
7. Chicago Housing Authority
[Docket No. TX98-1-000]
Take notice that on February 17, 1998, Chicago Housing Authority
tendered for filing an amendment in the above-referenced docket.
Comment date: March 6, 1998, in accordance with Standard Paragraph
E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of these filings are on file with
the Commission and are available for public inspection.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-4990 Filed 2-26-98; 8:45 am]