03-4643. Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals  

  • [Federal Register Volume 68, Number 39 (Thursday, February 27, 2003)]
    [Notices]
    [Pages 9109-9113]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 03-4643]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Federal Aviation Administration
    
    
    Notice of Passenger Facility Charge (PFC) Approvals and 
    Disapprovals
    
    AGENCY: Federal Aviation Administration (FAA), DOT.
    
    ACTION: Monthly notice of PFC approvals and disapprovals. In January 
    2003, there were 15 applications approved. Additionally, 15 approved 
    amendments to previously approved applications are listed.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC 
    approvals and disapprovals under the provisions of the Aviation Safety 
    and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget 
    Reconciliation Act of 1990) (Pub. L. 101-508) and Part 158 of the 
    Federal Aviation Regulations (14 CFR part 158). This notice is 
    published pursuant to paragraph d of Sec.  158.29.
    
    PFC Applications Approved
    
        Public Agency: City of Joplin, Missouri.
        Application Number: 02-01-C-00-JLN.
        Application Type: Impose and use a PFC.
        PFC Level: $4.50.
        Total PFC Revenue Approved in This Decision: $889,663.
        Earliest Charge Effective Date: April 1, 2003.
        Estimated Charge Expiration Date: July 1, 2008.
        Class of Air Carriers Not Required to Collect PFC's: None.
        Brief Description of Projects Approved for Collection and Use:
    
    Purchase new aircraft rescue and firefighting vehicle.
    Purchase and install new runway and taxiway signage.
    
    [[Page 9110]]
    
    Site preparation of runway 18/36 extension and parallel taxiway (phase 
    1).
    Site preparation of runway 18/36 extension and parallel taxiway (phase 
    2).
    Pave, mark, and light runway 18 extension.
    Partial parallel taxiway and connecting taxiways to runway 18.
    Install deer fence.
    Purchase medium intensity approach lighting system with runway 
    alignment indicator lights.
    Purchase handicap lift.
    Install runway 18 navigational aids.
    Construct taxiway K.
    Construct apron extension.
    Construct airport access roadway.
    Runway 13/31 safety area improvements.
    Airport signage/lighting enhancements.
    New passenger terminal building: Environmental assessment.
    New passenger terminal building: Phase 1 (design).
    
        Decision Date: January 9, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Lorna Sandridge, Central Region 
    Airports Division, (816) 329-2641.
        Public Agency: Monroe County Board of County Commissioners, Key 
    West, Florida.
        Application Number: 02-06-C-00-EYW.
        Application Type: Impose and use a PFC.
        PFC Level: $4.50.
        Total PFC Revenue Approved in This Decision: $263,000.
        Earliest Charge Effective Date: June 1, 2003.
        Estimated Charge Expiration Date: January 1, 2004.
        Class of Air Carriers Not Required to Collect PFC's:
        Commuters or small certificated air carriers filing Department of 
    Transportation Form 298-C T1 or E1.
        Determination: Approved. Based on information submitted in the 
    public agency's application, the FAA has determined that the approved 
    class accounts for less than 1 percent of the total annual enplanements 
    at Key West International Airport.
        Brief Description of Projects Approved for Collection and Use:
    
    PFC application and administration.
    Master utility plan.
    Noise insulation program construction.
    Noise insulation program (phase 3) architecture and engineering.
    Security.
    Runway safety area/runway 9/27 extension feasibility study.
    West general aviation apron lighting.
    Airfield guidance signs.
    Runway 9/27 drainage design and construction.
    Part 150 update.
    
        Decision Date: January 10, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Susan Moore, Orlando Airports District 
    Office, (407) 812-6331, extension 20.
        Public Agency: Savannah Airport Commission, Savannah, Georgia.
        Application Number: 02-05-C-00-SAV.
        Application Type: Impose and use of PFC.
        PFC Level: $4.50.
        Total PFC Revenue Approved in this Decision: $3,015,790.
        Earliest Charge Effective Date: July 1, 2012.
        Estimated Charge Expiration Date: May 1, 2013.
        Class of Air Carriers Not Required to Collect PFC's: Air taxi/
    commercial operators filing FAA Form 1800-31.
        Determination: Approved. Based on information submitted in the 
    public agency's application, the FAA has determined that the approved 
    class accounts for less than 1 percent of the total annual enplanements 
    at Savannah International Airport.
        Brief Description of Projects Approved for Collection and Use:
    
    Precision approach path indicators runways 9 and 36.
    Interactive training system.
    Fingerprint machine.
    (Construct taxiway) new ammunition bunker.
    Baggage lifts.
    PFC administration and implementation.
    Purchase and renovate loading bridges.
    Flight information display system.
    South bag carousel 1.
    Design and construct general aviation taxiways.
    
        Decision Date: January 13, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Philip Cannon, Atlanta Airports 
    District Office, (404) 305-7152.
        Public Agency: City of Pensacola, Florida.
        Application Number: 03-06-U-00-PNS.
        Application Type: Use PFC revenue.
        PFC Level: $4.50.
        Total PFC Revenue to be Used in this Decision: $12,300,000.
        Charge Effective Date: June 1, 1999.
        Estimated Charge Expiration Date: June 1, 2009.
        Class of Air Carriers Not Required to Collect PFC's: No change from 
    previous approval.
        Brief Description of Project Approved for Use: Runway 8/26 
    extension.
        Decision Date: January 15, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Bill Farris, Orlando Airports District 
    Office, (407) 812-6331, extension 25.
        Public Agency: Port of Bellingham, Bellingham, Washington.
        Application Number: 02-06-U-00-BLI.
        Application Type: Use PFC revenue.
        PFC Level: $4.50.
        Total PFC Revenue to be Used in this Decision: $1,200,000.
        Charge Effective Date: January 1, 2000.
        Estimated Charge Expiration Date: January 1, 2007.
        Class of Air Carriers Not Required to Collect PFC's: No change from 
    previous approval.
        Brief Description of Project Approved for Use: Terminal 
    rehabilitation and expansion.
        Decision Date: January 16, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Suzanne Lee-Pang, Seattle Airports 
    District Office, (425) 227-2654.
        Public Agency: St. Joseph County Airport Authority, South Bend, 
    Indiana.
        Application Number: 03-03-C-00-SBN.
        Application Type: Impose and use a PFC.
        PFC Level: $3.00.
        Total PFC Revenue Approved in this Decision: $23,898,229.
        Earliest Charge Effective Date: June 1, 2003.
        Estimated Charge Expiration Date: January 1, 2023.
        Class of Air Carriers Not Required to Collect PFC's: Part 135 air 
    taxi operators operating with less than 15 seats.
        Determination: Approved. Based on information submitted in the 
    public agency's application, the FAA has determined that the approved 
    class accounts for less than 1 percent of the total annual enplanements 
    at South Bend Regional Airport.
        Brief Description of Projects Approved for Collection and Use:
    
    Land acquisition.
    Lincolnway West Relocation.
    
        Decision Date: January 21, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Gregory N. Sweeny, Chicago Airports
    District Office, (847) 294-7526.
        Public Agency: Raleigh-Durham Airport Authority, Raleigh-Durham, 
    North Carolina.
        Application Number: 03-01-C-00-RDU
        Application Type: Impose and use a PFC.
        PFC Level: $3.00.
        Total PFC Revenue Approved in this Decision: $69,903,473.
        Earliest Charge Effective Date: April 1, 2003.
        Estimated Charge Expiration Date: September 1, 2008.
        Class of Air Carriers Not Required to Collect PFC's: Non-scheduled/
    on-demand air carriers.
    
    [[Page 9111]]
    
        Determination: Approved. Based on information submitted in the 
    public agency's application, the FAA has determined that the approved 
    class accounts for less than 1 percent of the total annual enplanements 
    at Raleigh-Durham Airport.
        Brief Description of Projects Approved for Collection and Use:
    
    Surface movement guidance and control system plan and improvements.
    Taxiway J and International Drive bridge.
    Runway 5R/23L safety areas extension.
    Preparation of PFC application.
    Relocate taxiway D/expand terminal C apron.
        Brief Description of Project Approved for Collection: Runway 5R/23L 
    safety area extension.
        Decision Date: January 22, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Tracie D. Kleine, Atlanta Airports 
    District Office, (404) 305-7148.
        Public Agency: Melbourne Airport Authority, Melbourne, Florida.
        Application Number: 03-06-C-00-MLB.
        Application Type: Impose and use a PFC.
        PFC Level: $3.00.
        Total PFC Revenue Approved in this Decision: $8,563,500.
        Earliest Charge Effective Date: October 1, 2003.
        Estimated Charge Expiration Date: June 1, 2018.
        Class of Air Carriers Not Required to Collect PFC's: Air taxi/
    commercial operator.
        Determination: Approved. Based on information submitted in the 
    public agency's application, the FAA has determined that the approved 
    class accounts for less than 1 percent of the total annual enplanements 
    at Melbourne International Airport.
        Brief Description of Project Approved for Collection and Use: 
    Terminal development.
        Decision Date: January 23, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Armando L. Rovira, Orlando Airports 
    District Office, (407) 812-6331, extension 31.
        Public Agency: City of Monroe, Louisiana.
        Application Number: 03-01-C-00-MLU.
        Application Type: Impose and use a PFC.
        PFC Level: $4.50.
        Total PFC Revenue Approved in this Decision: $1,134,672.
        Earliest Charge Effective Date: April 1, 2003.
        Estimated Charge Expiration Date: February 1, 2006.
        Class of Air Carriers Not Required to Collect PFC's: Air taxi/
    commercial carriers operating under Part 135 and filing FAA Form 1800-
    31.
        Determination: Approved. Based on information submitted in the 
    public agency's application, the FAA has determined that the approved 
    class accounts for less than 1 percent of the total annual enplanements 
    at Monroe Regional Airport.
        Brief Description of Projects Approved for Collection and Use: 
    Aircraft loading equipment improvements. Rehabilitate airfield 
    lighting. PFC application professional fees.
        Decision Date: January 23, 2003.
    
    FOR FURTHER INFORMATION CONTACT: G. Thomas Wade, Southwest Region 
    Airports Division, (817) 222-5613.
        Public Agency: Imperial County, Imperial, California.
        Application Number: 03-01-C-00-IPL.
        Application Type: Impose and use a PFC.
        PFC Level: $4.50.
        Total PFC Revenue Approved in this Decision: $892,781.
        Earliest Charge Effective Date: April 1, 2003.
        Estimated Charge Expiration Date: April 1, 2012.
        Class of Air Carriers Not Required to Collect PFC's: None.
        Brief Description of Projects Approved for Collection and Use:
    
    Rehabilitate runway 14/31.
    Rehabilitate runway 8/26.
    Rehabilitate and construct aprons.
    Rehabilitate access road and public parking areas.
    Update airport master plan.
    Rehabilitate passenger terminal building.
    Rehabilitate aircraft rescue and firefighting vehicle.
    Acquire airport sweeper.
    Acquire Americans with Disabilities Act passenger lift device.
    Install gate actuators.
    Airport maintenance building.
    Airport drainage and erosion protection.
        Decision Date: January 24, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Eric Vermeeren, Western Pacific Region 
    Airports Division, (310) 725-3631.
        Public Agency: Metropolitan Airports Commission, Minneapolis, 
    Minnesota.
        Application Number: 02-06-C-00-MSP.
        Application Type: Impose and use a PFC.
        PFC Level: $4.50.
        Total PFC Revenue Approved in this Decision: $1,161,478,610.
        Earliest Charge Effective Date: April 1, 2003.
        Estimated Charge Expiration Date: January 1, 2017.
        Class of Air Carriers Not Required to Collect PFC's: Air taxi/
    commercial operators filing FAA Form 1800-31.
        Determination: Approved. Based on information submitted in the 
    public agency's application, the FAA has determined that the approved 
    class accounts for less than 1 percent of the total annual enplanements 
    at Minneapolis-St. Paul International Airport.
    
        Brief Description of Projects Approved for Collection and Use at a 
    $3.00 PFC Level:
    
    Airside bituminous construction--2001.
    Taxiways A/H reconstruction.
    Green/Gold connector bag belt.
    Green/Gold connector ticket counter/bag check.
    
        Brief Description of Projects Partially Approved for Collection and 
    Use at a $3.00 PFC Level: Runway 4/22 property acquisition.
        Determination: The public agency revised its cost estimate for the 
    project downward after the airline consultation meeting and submission 
    of the PFC application.
        Pavement rehabilitation--aprons/taxiways.
        Determination: The public agency discovered, after submitting the 
    application, that one element of the proposed project had been included 
    in a previous PFC application and, so, deleted that element.
        Brief Description of Projects Approved for Collection and Use at a 
    $4.50 PFC Level:
    
    Runway 12L deicing pad.
    Runway 12R deicing pad.
    Buildings demolition.
    Taxiway B construction.
    Runway 17/35 site preparation and utility installation.
    Runway 17/35 site demolition on and off airport.
    Runway 17/35 runways, taxiways, taxilanes, and connectors.
    Runway 17/35 airfield service roads.
    Runways 17/35 and 4/22 tunnels.
    Taxiways W-Y/Y-3 tunnels.
    Tenant lease extinguishment.
    Deicing agent processing facility.
    Airfield material and equipment storage facilities.
    Property acquisition.
    Program planning/management costs.
    Residential noise insulation.
    Green concourse (concourse C) expansion--phase 1.
    Green concourse (concourse C) expansion--phase 2.
    Green concourse apron expansion.
    Green/gold connector.
    Green concourse automated people mover.
    
    [[Page 9112]]
    
    Humphrey Terminal hydrant fueling system.
    
        Brief Description of Project Approved for Collection at a $4.50 PFC 
    Level: Fire/rescue replacement facility.
        Brief Description of Disapproved Projects: Runway 12R/30L temporary 
    extension.
        Determination: This project does not meet Airport Improvement 
    Program (AIP) eligibility criteria for temporary construction, 
    paragraph 310(e)(2) of FAA Order 5100.38B, AIP Handbook, (May 31, 
    2002), because it is not required to maintain uninterrupted operation 
    of the airport.
        Miscellaneous airfield construction.
        Determination: The project description identifies unspecified small 
    incidental airside projects of a maintenance nature. Maintenance work 
    at primary airports is specifically identified as being not AIP 
    eligible per paragraph 501 of FAA Order 5100.38B, AIP Handbook, (May 
    31, 2002).
        Maintenance facility addition--2000.
        Determination: This project does not meet AIP eligibility criteria 
    because it does not involve the storage of eligible equipment or 
    abrasives and chemicals used in the treatment of eligible paved areas 
    per paragraph 547(c) of FAA Order 5100.38B, AIP Handbook (May 31, 
    2002).
        Brief Description of Withdrawn Projects:
    Concourse F expansion.
        Date of Withdrawal: December 20, 2002. Security fence/gate 
    replacements.
        Date of Withdrawal: January 16, 2003.
        Decision Date: January 24, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Gordon Nelson, Minneapolis Airports 
    District Office, (612) 713-4358.
        Public Agency: Missoula County Airport Authority, Missoula, 
    Montana.
        Application Number: 03-04-C-00-MSO.
        Application Type: Impose and use a PFC.
        PFC Level: $4.50.
        Total PFC Revenue Approved in this Decision: $832,464.
        Earliest Charge Effective Date: February 1, 2004.
        Estimated Charge Expiration Date: April 1, 2006.
        Class of Air Carriers Not Required to Collect PFC's: Air taxi/
    commercial operators filing FAA Form 1800-31.
        Determination: Approved. Based on information submitted in the 
    public agency's application, the FAA has determined that the approved 
    class accounts for less than 1 percent of the total annual enplanements 
    at Missoula International Airport.
        Brief Description of Project Approved for Collection and Use: 
    Rehabilitate air carrier apron (phase 2).
        Decision Date: January 24, 2003.
    
    FOR FURTHER INFORMATION CONTACT: David S. Stelling, Helena Airports 
    District Office, (406) 449-5271.
        Public Agency: Port of Pasco, Pasco, Washington.
        Application Number: 02-05-C-00-PSC.
        Application Type: Impose and use a PFC.
        PFC Level: $4.50.
        Total PFC Revenue Approved in this Decision: $1,409,000.
        Earliest Charge Effective Date: April 1, 2004.
        Estimated Charge Expiration Date: February 1, 2006.
        Class of Air Carriers Not Required to Collect PFC's: None.
        Brief Description of Projects Approved for Collection and Use:
    
    Security enhancement plan.
    Terminal building passenger boarding area upgrades.
    Security enhancements.
    Interactive training systems.
    Security fencing.
        Decision Date: January 24, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Suzanne Lee-Pang, Seattle Airports 
    District Office, (425) 227-2654.
        Public Agency: Central West Virginia Regional Airport Authority, 
    Charleston, West Virginia.
        Application Number: 03-08-C-00-CRW.
        Application Type: Impose and use a PFC.
        PFC Level: $4.50.
        Total PFC Revenue Approved in this Decision: $2,834,117.
        Earliest Charge Effective Date: April 1, 2003.
        Estimated Charge Expiration Date: February 1, 2006.
        Classes of Air Carriers Not Required to Collect PFC's:
        (1) Part 135 charter operators for hire to the general public; (2) 
    Part 121 charter operators for hire to the general public; (3) non-
    signatory and non-scheduled air carriers.
        Determination: Approved. Based on information submitted in the 
    public agency's application, the FAA has determined that each approved 
    class accounts for less than 1 percent of the total annual enplanements 
    at Yeager Airport.
        Brief Description of Projects Approved for Collection and Use:
    
    Runway 5/23 engineering study.
    Obstruction removal.
    Taxiway B drain repair.
    Strengthen taxiways B and B1 and apron.
    Acquire snow equipment (rdio/friction meter).
    Acquire snow removal equipment (end loader).
    Acquire security vehicle.
    Rehabilitate airport lighting.
    Rehabilitate runway 5/23.
    Acquire snow removal equipment (grader).
    Construct snow equipment storage building.
    Acquire airline baggage lift system.
    Conduct wildlife study.
    Install apron signs.
    Rehabilitate runway 15/33.
    Replace lighting regulators.
    Repair runway 5/23.
    Upgrade runway scan system.
    
        Brief Description of Project Approved for Use: Paging system.
        Brief Description of Project Disapproved for Collection: Safety 
    area improvement runway 5 approach.
        Determination: In accordance with Sec.  158.25(b)(14)(ii), an 
    application for authority to impose a PFC shall include a description 
    of any alternative uses of the PFC revenue to ensure such revenue will 
    be used only on eligible projects in the event the primary project is 
    not approved for use authority or implemented. No alternative projects 
    were provided in this application.
        Decision Date: January 28, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Larry F. Clark, Beckley Airports Field 
    Office, (304) 252-6212.
        Public Agency: Gulfport-Biloxi Regional Airport Authority, 
    Gulfport, Mississippi.
        Application Number: 03-06-C-00-GPT.
        Application Type: Impose and use a PFC.
        PFC Level: $4.50.
        Total PFC Revenue Approved in this Decision: $14,251,901.
        Earliest Charge Effective Date: June 1, 2005.
        Estimated Charge Expiration Date: September 1, 2012.
        Class of Air Carriers Not Required to Collect PFC'S: None.
        Brief Description of Projects Approved for Collection and Use:
    
    Terminal expansion--baggage claim area.
    Terminal expansion--baggage screening area.
    Terminal expansion--security screening checkpoint.
    Terminal expansion--flight information display/baggage information 
    display systems.
    Terminal expansion baggage claim phase II and second floor.
    
        Brief Description of Disapproved Project: Airline security 
    reimbursement.
        Determination: The project was for costs incurred by the airlines, 
    not the
    
    [[Page 9113]]
    
    public agency, and, thus, was not AIP or PFC eligible.
        Decision Date: January 29, 2003.
    
    FOR FURTHER INFORMATION CONTACT: Patrick D. Vaught, Jackson Airports 
    District Office, (601) 664-9885.
    
    Amendments to PFC Approvals
    
    ----------------------------------------------------------------------------------------------------------------
                                                                                         Original         Amended
                                         Amendment       Original         Amended        estimated       estimated
        Amendment No. city, state      approved date   approved net    approved net     charge exp.     charge exp.
                                                        PFC revenue     PFC revenue        date            date
    ----------------------------------------------------------------------------------------------------------------
    97-01-C-01-BHM, Birmingham, AL..        12/18/02      $7,657,558      $7,438,100        02/01/00        02/01/00
    99-02-C-01-BHM, Birmingham, AL..        12/23/02      10,736,857       9,539,381        02/01/01        10/01/00
    01-14-C-01-CHO, Charlottesville,        01/03/03       4,480,518       4,609,392        01/01/05        03/01/06
     VA.............................
    93-01-C-13-ORD, Chicago, IL.....        01/23/03   1,228,917,970   1,148,517,970        02/01/17        07/01/16
    96-05-C-07-ORD, Chicago, IL.....        01/23/03     467,714,130     467,714,130        02/01/17        07/01/16
    01-12-C-04-ORD, Chicago, IL.....        01/23/03     972,627,790   1,072,879,304        07/01/16        04/01/17
    92-01-C-05-HPN, White Plains, NY        01/23/03      17,932,607      17,252,918        05/01/04        05/01/04
    * 00-04-C-01-BUR, Burbank, CA...        01/24/03      73,699,087      73,699,087        08/01/13        01/01/08
    96-02-C-03-JAX, Jacksonville, FL        01/24/03      18,503,092      19,042,209        06/01/99        06/01/99
    97-03-U-01-JAX, Jacksonville, FL        01/24/03              NA              NA        06/01/99        06/01/99
    99-04-C-01-JAX, Jacksonville, FL        01/24/03       5,010,000       5,140,741        01/01/00        01/01/00
    00-05-C-01-JAX, Jacksonville, FL        01/24/03      13,081,065       3,814,930        02/01/02        02/01/02
    98-07-I-05-PHL, Philadelphia, PA        01/24/03     986,693,869     999,267,790        12/01/12        02/01/13
    99-08-U-04-PHL, Philadelphia, PA        01/24/03              NA              NA        12/01/12        02/01/13
    99-02-C-01-UNV, State College,          01/24/03       1,448,605       1,597,102        10/01/04        10/01/04
     PA.............................
    ----------------------------------------------------------------------------------------------------------------
    
        (Note: The amendment denoted by an asterisk (*) includes a 
    change to the PFC level charged from $3.00 per enplaned passenger to 
    $4.50 per enplaned passenger. For Burbank, CA, this change is 
    effective on April 1, 2003.
    
        Issued in Washington, DC on February 21, 2003.
    Barry Molar,
    Manager, Airports Financial Assistance Division.
    [FR Doc. 03-4643] Filed 2-26-03; 8:45 am]
    BILLING CODE 4910-13-M
    
    
    

Document Information

Effective Date:
4/1/2003
Published:
02/27/2003
Department:
Federal Aviation Administration
Entry Type:
Notice
Action:
Monthly notice of PFC approvals and disapprovals. In January 2003, there were 15 applications approved. Additionally, 15 approved amendments to previously approved applications are listed.
Document Number:
03-4643
Dates:
April 1, 2003.
Pages:
9109-9113 (5 pages)
PDF File:
03-4643.pdf