E6-2691. Proposed Flood Elevation Determinations  

  • Start Preamble

    AGENCY:

    Federal Emergency Management Agency (FEMA), Department of Homeland Security, Mitigation Division.

    ACTION:

    Proposed rule.

    SUMMARY:

    Technical information or comments are requested on the proposed Base (1% annual chance) Flood Elevations (BFEs) and proposed BFE modifications for the communities listed below. The BFEs are the basis for the floodplain management measures that the community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).

    DATES:

    The comment period is ninety (90) days following the second publication of this proposed rule in a newspaper of local circulation in each community.

    ADDRESSES:

    The proposed BFEs for each community are available for inspection at the office of the Chief Executive Officer of each community. The respective addresses are listed in the table below.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Doug Bellomo, P.E., Hazard Identification Section, FEMA, 500 C Start Printed Page 9761Street, SW., Washington, DC 20472, (202) 646-2903.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    FEMA proposes to make determinations of BFEs and modified BFEs for each community listed below, in accordance with Section 110 of the Flood Disaster Protection Act of 1973, 42 U.S.C. 4104, and 44 CFR 67.4(a).

    These proposed base flood elevations and modified BFEs, together with the floodplain management criteria required by 44 CFR 60.3, are the minimum that are required. They should not be construed to mean that the community must change any existing ordinances that are more stringent in their floodplain management requirements. The community may at any time enact stricter requirements of its own, or pursuant to policies established by other Federal, state or regional entities. These proposed elevations are used to meet the floodplain management requirements of the NFIP and are also used to calculate the appropriate flood insurance premium rates for new buildings built after these elevations are made final, and for the contents in these buildings.

    National Environmental Policy Act. This proposed rule is categorically excluded from the requirements of 44 CFR part 10, Environmental Consideration. No environmental impact assessment has been prepared.

    Regulatory Flexibility Act. The Mitigation Division Director certifies that this proposed rule is exempt from the requirements of the Regulatory Flexibility Act because proposed or modified BFEs are required by the Flood Disaster Protection Act of 1973, 42 U.S.C. 4104, and are required to establish and maintain community eligibility in the NFIP. As a result, a regulatory flexibility analysis has not been prepared.

    Regulatory Classification. This proposed rule is not a significant regulatory action under the criteria of Section 3(f) of Executive Order 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735.

    Executive Order 13132, Federalism. This rule involves no policies that have federalism implications under Executive Order 13132.

    Executive Order 12988, Civil Justice Reform. This rule meets the applicable standards of Executive Order 12988.

    Start List of Subjects

    List of Subjects in 44 CFR Part 67

    • Administrative practice and procedure
    • Flood insurance
    • Reporting and recordkeeping requirements
    End List of Subjects

    Accordingly, 44 CFR part 67 is proposed to be amended as follows:

    Start Part

    PART 67—[AMENDED]

    1. The authority citation for part 67 continues to read as follows:

    Start Authority

    Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376.

    End Authority
    [Amended]

    2. The tables published under the authority of § 67.4 are proposed to be amended as follows:

    StateCity/town/countySource of floodingLocation#Depth in feet above ground *Elevation in feet (NGVD) •Elevation in feet (NAVD)
    ExistingModified
    CaliforniaRohnert Park (City), Sonoma CountyLaguna de Santa Rosa CreekAt downstream side of Redwood Highway South (US Route 101)*95*94
    Approximately 0.80 mile upstream of Redwood Highway South*105*94
    Maps available for inspection at the Rohnert Park City Public Works Department, 6750 Commerce Boulevard, Rohnert Park, California.
    Send comments to Mr. Steve Donley, Rohnert Park City Manager, 6750 Commerce Boulevard, Rohnert Park, California 94928.
    CaliforniaTulare County (Unincorporated Areas)Sheet Flow west of Sand CreekApproximately 0.47 mile downstream of Avenue 440#2#1
    Approximately 0.56 mile upstream of Avenue 440#2#1
    Maps available for inspection at Tulare County Resource Management Agency, 5961 South Mooney Boulevard, Visalia, California.
    Send comments to Mr. Brian Haddix, Tulare County Administrative Officer, 2800 West Burrel Avenue, Visalia, California 93291.

    (Catalog of Federal Domestic Assistance No. 83.100, “Flood Insurance.”)

    Start Signature

    Dated: February 3, 2006.

    David I. Maurstad,

    Acting Director, Mitigation Division, Federal Emergency Management Agency, Department of Homeland Security.

    End Signature End Part End Supplemental Information

    [FR Doc. E6-2691 Filed 2-24-06; 8:45 am]

    BILLING CODE 9110-12-P

Document Information

Published:
02/27/2006
Department:
Federal Emergency Management Agency
Entry Type:
Proposed Rule
Action:
Proposed rule.
Document Number:
E6-2691
Dates:
The comment period is ninety (90) days following the second publication of this proposed rule in a newspaper of local circulation in each community.
Pages:
9760-9761 (2 pages)
Docket Numbers:
Docket No. FEMA-D-7644
Topics:
Administrative practice and procedure, Flood insurance, Reporting and recordkeeping requirements
PDF File:
e6-2691.pdf
CFR: (1)
44 CFR 67.4